SUPERSEDED Minor Change Existing Approval - 51983.3225.23 (As Published)
27. All waste materials are removed from site.
28. Litter, erosion and sediment control measures are to be installed and/or maintained until soils
are stabilised by vegetation or sealed. NB: it is an offence under the Environmental Protection
Act 1994 to deposit or potentially allow litter, waste, soil, or other contaminants to enter a
waterway or storm water drainage system (e.g. roadside gutter).
29. Removal of building materials containing asbestos must be undertaken by a licensed
asbestos removalist.
30. Asbestos removal work (Section 466) of the Work Health and Safety Regulation
2011 requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
commences. Notification must be made using Form 65: Notification of licensed asbestos
removal work, demolition work or emergency demolition.
31. All building materials containing asbestos products are wrapped and disposed of in
accordance with the Public Health Regulation 2006 and the Environmental Protection
Regulation 2008. NB: Asbestos is a Regulated Waste. The Department of Environment &
Science licenses businesses that transport asbestos waste, and landfills that accept this
waste.
32. All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging are removed from the building prior to demolition/relocation.
33. It is a requirement of the ‘Plumbing and Drainage Regulation 2019’ that at demolition of a
building classed 1-10, the existing sanitary drain upstream from the connection point for a
service provider’s sewerage system must be sealed water tight. This work is deemed as
Notifiable Work and must be carried out by a suitably licenced plumber who shall submit an
As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
Construction Commission) within 10 days of completing the work.
Special conditions relating to the redevelopment of Unit 19 only – 4 March 2021
34. The Level 1 balcony is to be setback 0.5 metres from the western boundary and 3.5 metres
from the northern boundary.
35. All parts of the building must be wholly contained within Lot 19 with the exception of
structures in the exclusive use area as stipulated by the Community Management Statement
for the site.
36. The storage room on the ground level is not to be used as a bedroom or as any other
habitable room.
Additional Conditions specific for Lot 30 (and the use of Lots 7 & 11 for construction and
access) – 21 October 2021
Performance Bond - Planning
37. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
be submitted to Council, to secure performance of all conditions of this approval, specifically
for Lot 30, prior to the issue of a Development Permit for Building Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval less
any costs incurred by Council in respect of enforcing performance of this permit. Council
reserves the right to call upon the bond or guaranteed sum to effect compliance with
conditions.
Performance Bond – Demolition
38. Security to the value of $10,000 must be provided to Council’s Building and Plumbing
Services prior to the issue of the development approval for building works (demolition). The
security must be in the form of a cash bond or bank guarantee, for security against
satisfactory completion of works.
Page 14 of 23
Document Set ID: 24114935
Version: 6, Version Date: 19/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records