Attachment A - Approved Decision Notice MCU210027

of 19

Page text shows just the words. Original shows the document exactly as it was published.

                                                              Officer:            Lisa Pienaar
                                                              Direct Telephone:   07 53296514
                                                              Our Reference:      MCU21/0027 & OPW21/0047 :
                                                              Your Reference:     02061

               16 June 2021


               HRS Developments Pty Ltd Tte
               C/- Martoo Consulting Pty Ltd
               PO Box 1684
               NOOSA HEADS QLD 4567

               [email protected]



               Dear Sir/Madam,
                                                         Decision Notice
                                                         Planning Act 2016

               I refer to your application and advise that on 10 June 2021, Council decided to approve the
               application subject to conditions.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              MCU21/0027 and OPW21/0047

                   Street address:              30 & 32 James St Noosaville Qld 4566

                   Real property description:   Lots 3 & 4 RP 72986

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
                      Development Permit for Material Change of Use for Multiple dwellings x 4
                      Development Permit for Operational Works for Stormwater, drainage works, earthworks
                       and landscaping
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

                                       MATERIAL CHANGE OF USE MCU21/0027
               PLANNING
                       When Conditions must be Complied With
               1.      Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                       the use commencing, and then compliance maintained at all times while the use continues.



                                                PO Box 141                 P. (07) 5329 6500      [email protected]
                                                TEWANTIN QLD 4565          F. (07) 5329 6501      www.noosa.qld.gov.au
                                                                                                               Page 1 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021
Log in to download the original file

Attachment A - Approved Decision Notice MCU210027.pdf · 245 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 18 pages

Page 2

                      Approved Plans
               2.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                         Plan No.      Rev.      Plan/Document Name                                      Date

                         02            DA05      Site Plan, prepared by Braeden Constructions            7/5/21

                         03            DA05      Floor Plan - GF, prepared by Braeden                    7/5/21
                                                 Constructions

                         04            DA05      Floor Plan - FF, prepared by Braeden                    7/5/21
                                                 Constructions

                         05            DA05      Roof Plan, prepared by Braeden Constructions            7/5/21

                         09            DA05      Western Elevation and Southern Elevation,               7/5/21
                                                 prepared by Braeden Constructions

                         10            DA05      Eastern Elevation, Northern Elevation, and privacy      7/5/21
                                                 screen detail, prepared by Braeden Constructions

                         11            DA5       Landscape - Trees, prepared by Braeden                  7/5/21
                                                 Constructions and as annotated by Council

                         12            DA5       Landscape - Ground, prepared by Braeden                 7/5/21
                                                 Constructions and as annotated by Council

                         13            DA5       Landscape – Roof Garden, prepared by Braeden            7/5/21
                                                 Constructions and as annotated by Council

                      Site Cover
               3.     Site cover must not exceed 40% measured in accordance with the Noosa Plan 2020.
                      Currency Period
               4.     This development approval lapses if the use has not happened by 11 June 2027, unless an
                      application to extend the currency period is approved by Council.
                      Building Height
               5.     The maximum height of the development must not exceed 8 metres above the natural ground
                      level and 2 storeys.
               6.     Certification must be submitted to Council from a Licensed Surveyor which certifies that the
                      building does not exceed the maximum height requirement of this Decision Notice.
                      Fill
               7.     Fill within the front setback must batter down to NGL as shown on the approved northern
                      elevation drawing 10 dated 7/5/2021.
                      Performance Bond
               8.     Security in the form of a cash bond or trading bank guarantee to the sum of $30,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to pre-
                      start meeting. The cash bond or trading bank guarantee will be returned on performance of
                      the conditions of approval less any costs incurred by Council in respect of enforcing
                      performance of this permit. Council reserves the right to call upon the bond or guaranteed
                      sum to effect compliance with conditions.


                                                                                                       Page 2 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 3

                      Street Identification
               9.     The street address of the development must be clearly visible and discernible from the
                      primary frontage of the site by the provision of a street number and, where appropriate, the
                      building name.
                      Water & Sewer Connections
               10.    An underground connection to reticulated water and sewerage must be provided to the
                      development site in accordance with the standards and requirements of Northern SEQ
                      Distributor–Retailer Authority (Unitywater).
               11.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
                      must be submitted to Council that certifies an underground connection to reticulated water
                      and sewerage has been provided to the development site.
                      Building Appearance
               12.    All air conditioning units or other mechanical equipment must be fully enclosed or screened
                      such that they are not visible from the street frontages nor adjoining properties.
               13.    All deck and balcony areas above ground floor must not be enclosed by permanent fixtures
                      such as shutters, louvres, glass panelling or the like, except where required to satisfy any
                      privacy condition of this Decision Notice.
                      Fencing and Walls
               14.    Street fencing must be provided as shown on the approved Site Plan.
               15.    The area of land between the fence and the front property boundary must be densely
                      landscaped to screen any fencing from the street.
                      Clothes Drying Areas
               16.    Each dwelling unit must be provided with access to an outdoor clothesline which is screened
                      from public view.
                      Protection of Privacy
               17.    To protect privacy between adjoining properties, balconies, windows or openings must use
                      either/and translucent glazing, balustrading or fixed external screens, positioned in such a
                      way to obscure direct views into the habitable room windows or private open space areas of
                      the adjoining properties.
                      LANDSCAPING
                      Landscaping Works
               18.    The development site must be landscaped. The works must be undertaken in accordance
                      Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
                      Landscaping Plans. In this regard, amended Landscape Plans must be provided to Council
                      prior to the pre-start meeting with the following changes:
                      a.      the following species are not approved and must be replaced with native species:
                              i.       Poinciana
                              ii.      Pinstripe ginger
                              iii.     Heliconia
                              iv.      Gardenia
                      b.      Wodyetia bifurcata (foxtail palm) identified on the approved plans as ‘t4’ are not
                              approved and must be replaced with a suitable native screening feature tree. Palm’s
                              individually planted are not in accordance with PSP2 – Landscaping.
                      c.      t2 and replacement species t4 plantings must be 45 litre pot size;
                      d.      a total of 2 x additional feature trees along the northern boundary, each one located
                              opposite the lower floor lounge/master suite (approximately)


                                                                                                     Page 3 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 4

                      e.      screening vegetation for the full length of the eastern boundary. The species must grow
                              to a minimum mature height of 6m and planted at 2m centres.
                      f.      provide 2 x Acronychia’s in each flared widening along the southern side of the
                              driveway
                      g.      provision of 4 x 45 litre street trees evenly spaced within the road reserve
               19.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               20.    All landscape works must be maintained generally in accordance with the approved design
                      for the life of the development.
                      ENGINEERING
                      External Works
               21.    James Street must be upgraded for the length of its frontage to the subject site. The works
                      must be undertaken in accordance with the conditions of this Decision Notice and must
                      include in particular:
                      a.      construction of a pedestrian footpath;
                      b.      removal of the existing site access and reinstatement of the kerb, footpath and verge
                              area to match the balance of the site frontage, including the provision of topsoil and
                              turf where the existing verge is grassed.
                      Site Access and Driveways
               22.    A sealed access driveway must be provided from James Street to all parking and
                      manoeuvring areas of the development. The works must be undertaken in accordance with
                      the conditions of this Decision Notice and must include in particular:
                      a.      a driveway crossover generally in accordance with council standard drawings RS-049,
                              RS-050 and respective addendums.
                      b.      An updated Driveway and Access Plan to reflect the amended driveway shape.
                      Car Parking
               23.    A minimum of 9 car parking spaces must be provided and marked on the site. The works
                      must be undertaken in accordance with the conditions of this Decision Notice and must
                      include in particular:
                      a.      1 visitor parking spaces within the total, which are clearly marked for that purpose and
                              accessible at all times for visitor use;
                      b.      dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities.
               24.    All car parking areas and access driveways must be maintained exclusively for vehicle
                      parking and manoeuvring and kept in a tidy and safe condition at all times.
                      Pedestrian and Bicycle Facilities
               25.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with the conditions of this Decision Notice and must include in
                      particular:
                      a.      A 1.8 metre wide concrete footpath within the road verge for the entire length of the
                              site’s frontage to James Street.
                      Stormwater Drainage
               26.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with the conditions of this Decision
                      Notice and must include in particular:


                                                                                                         Page 4 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 5

                      a.      the works shown on the Approved Plans;
                      Services
               27.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               28.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               29.    A 4 metre wide easement for Stormwater purposes must be registered against the title of the
                      property in favour of Noosa Council over the proposed easement identified on the Approved
                      Plans.
               30.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               31.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               32.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Earthworks and Retaining Walls
               33.    All fill and associated batters must be contained entirely within the subject site unless written
                      permission from the respective landowner(s) is provided to Council. All earthworks must be
                      undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on
                      Earthworks for Commercial and Residential Developments and the conditions of this
                      Decision Notice.
               34.    Where the development involves excavation or filling over, or adjacent to, drainage, water
                      supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
                      provide a freeboard of 100mm above the finished ground surface level.
               35.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      ENVIRONMENTAL HEALTH
                      Waste Storage
               36.    The developer must provide waste storage and disposal facilities in accordance with
                      Planning Scheme Policy PSP - 9 Waste Management, including an external imperviously
                      paved area correctly sized for all refuse and recycling containers and suitably screened from
                      public places and neighbouring properties.
               37.    A bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer,
                      via a bucket trap. The drain outlet is to be designed to prevent storm water entry to the
                      sewerage system which can be achieved by a bunded area, with a nib wall height of 100mm
                      maximum, enclosing a wash area of 700mm x 700mm minimum (max 0.7m²). Alternatively,
                      the waste area can be roofed, or any other appropriate design approved by Council.
                      Noise
               38.    Written certification is required from a suitably qualified person confirming that sound
                      pressure levels from all mechanical plant and equipment comply with the following:
                      a.      Air-conditioning and Refrigeration

                                                                                                        Page 5 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 6

                                      7am to 10pm: Maximum level allowable = background + 5dB(A)
                                      10pm to 7am: Maximum level allowable = background + 3dB(A)
                      b.      Pumps
                                      7am to 7pm: Maximum level allowable = background + 5dB(A)
                                      7pm to 10pm: Maximum level allowable = background + 3dB(A)
                                      10pm to 7am: No audible noise.
               39.    The certification must be submitted to Council, which certifies that operational noise from any
                      fixed plant and equipment complies with the requirements of this Decision Notice.
                      DEMOLITION
                      Performance Bond
               40.    Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
                      submitted to Council prior to the issue of a Development Permit for Building Works for
                      demolition, to secure the demolition conditions of this approval. The cash bond or trading
                      bank guarantee will be returned on performance of the demolition conditions of this approval
                      less any costs incurred by Council in respect of enforcing performance of these demolition
                      conditions. Council reserves the right to call upon the bond or guaranteed sum to effect
                      compliance with conditions.
                      Works
               41.    Demolition must be undertaken in a manner that causes no detrimental effect upon the
                      amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
                      hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions
                      in accordance with the nuisance provisions of the Environmental Protection Act 1994.
                      Waste management
               42.    A Waste Management Plan (demolition) must be submitted in accordance with Planning
                      Scheme Policy PSP10 - Waste Management and approved by Council’s Waste Coordinator
                      prior to issue of a development permit for Building Works for demolition, removal or
                      relocation.
                      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
                      effective reuse and recycling of such materials. Segregated wastes attract significantly
                      reduced disposal fees at the landfill with some items free. Higher gate fees are charged for
                      mixed waste.
                      Waste storage areas must provide for adequate separation of all reusable, recyclable and
                      waste materials. These must be located so that they are convenient and safe to use.
                      The Plan must contain the following information:
                      a.      The areas for the storage and separation of waste shown on a site plan;
                      b.      A waste management table as indicated below is to be completed showing how waste
                              material is to be segregated - recycled – reused or disposed; and
                      c.      Table – Waste Management Table




                                                                                                        Page 6 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 7

                          MATERIALS ON-SITE                                   DESTINATION
                                                                  Re-use and Recycling                    Disposal
                          Expected waste    Estimated  On-site                 Off-site               *specify contractor
                          materials         volume(m³) *specify     proposed   *specify contractor    and landfill site or
                                                         re-use or on-site     and recycling outlet   other disposal site
                                                         recycling methods
                          Excavation
                          material
                          Green waste
                          Bricks
                          Concrete
                          Timber-please
                          specify
                          Plasterboard
                          Metals - please
                          specify
                          Asbestos
                          Other - please
                          specify
                      Note * If a demolition contractor is undertaking works, then the Waste Management table is
                      to be completed by the demolition contractor.
                      Damage to infrastructure
               43.    Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
                      bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
                      Vacant site
               44.    The site must be left clean and tidy free from debris such as concrete, wire, rubble, brick/s
                      and the like. If the site remains vacant for more than 30 days the lot/s must be turfed or
                      landscaped in accordance with Planning Scheme Policy PSP 2 – Landscaping and to the
                      satisfaction of Council so as to not cause nuisance to the surrounding area.
               45.    All waste materials must be removed from site.
                      Litter, erosion and sediment control
               46.    Litter, erosion and sediment control measures must be installed and maintained until soils
                      are stabilised by turf, vegetation or sealed.
                      Note: it is an offence under the Environmental Protection Act 1994 to deposit or potentially
                      allow litter, waste, soil, or other contaminants to enter a waterway or storm water drainage
                      system (e.g. roadside gutter).
                      Asbestos
               47.    Removal of building materials containing asbestos must be undertaken by a licensed
                      asbestos removalist.
               48.    Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
                      requires a licensed asbestos removalist to give notice to Workplace Health and Safety
                      Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
                      commences. Notification must be made using Form 65: Notification of licensed asbestos
                      removal work, demolition work or emergency demolition.
               49.    All building materials containing asbestos products are wrapped and disposed of in
                      accordance with the Public Health Regulation 2006 and the Environmental Protection
                      Regulation 2008.
                      Note: Asbestos is a Regulated Waste. The Department of Environment & Science licenses
                      businesses that transport asbestos waste, and landfills that accept this waste.
               50.    All building materials containing asbestos, including asbestos cement sheeting or roofing and
                      lagging are removed from the building prior to demolition/relocation.

                                                                                                        Page 7 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 8

                      Plumbing and Drainage
               51.    It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
                      demolition of a building, the existing sanitary drain upstream from the connection point for a
                      service provider’s sewerage system must be sealed water tight. This work is deemed as
                      notifiable Work and must be carried out by a suitably licenced plumber who must submit an
                      As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
                      Construction Commission) within 10 days of completing the work.
                                       OPERATIONAL WORKS – OPW21/0047
                      APPROVED PLANS
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                         Plan No.           Rev.    Plan/Document Name                             Date

                         31026-OW3.1        A       Earthworks Plan                                22/03/2021
                                                    Prepared by SCG Consulting Engineers

                         31026-OW5.1        A       Sewer and Stormwater Protection Plan           22/03/2021
                                                    Prepared by SCG Consulting Engineers
                                                    (AS ANNOTATED IN RED BY COUNCIL)

                         31026-OW6.1        A       Driveway and Access Plan                       22/03/2021
                                                    Prepared by SCG Consulting Engineers
                                                    (AS ANNOTATED IN RED BY COUNCIL)

                         31026-OW6.2        A       Driveway Levels Plan                           22/03/2021
                                                    Prepared by SCG Consulting Engineers

                         31026-SW1.1        A       Stormwater Management Plan                     22/03/2021
                                                    Prepared by SCG Consulting Engineers

                         31026-C1.1         A       Stormwater Relocation Plan                     22/03/2021
                                                    Prepared by SCG Consulting Engineers

                         11                 DA5     Landscape - Trees, prepared by Braeden 7/5/21
                                                    Constructions and as annotated by
                                                    Council

                         12                 DA5     Landscape - Ground, prepared by Braeden 7/5/21
                                                    Constructions and as annotated by
                                                    Council

                         13                 DA5     Landscape – Roof Garden, prepared by 7/5/21
                                                    Braeden Constructions and as annotated
                                                    by Council

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 15 May 2023, unless an application to extend the currency period is
                      approved by Council.


                                                                                                      Page 8 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 9

               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               3.     All necessary approvals from external service providers (e.g. Unitywater) and external parties
                      on which the development works are proposed have been obtained and a copy supplied to
                      Council.
               4.     A condition report of the drainage system must be completed and submitted to council prior
                      to the prestart meeting. The condition report is to include:
                      a.      a CCTV inspection of the pipe section between the existing eastern most pit on the
                              subject site (to be retained) and the connecting pit on Weyba Road;
                      b.      photos of the existing stormwater gully pit on James St fronting the subject site.
               5.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to council prior to the prestart meeting.
               6.     A condition report of all the properties neighbouring the subject site must be completed and
                      submitted to council prior to the prestart meeting.
               7.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               8.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Landscape works;
                      c.      Erosion and sediment control works;
                      d.      Other relevant parties.
               9.     A Construction Management Plan must be submitted to Council prior to the pre-start meeting
                      and must specifically address the following:
                      a.      Traffic Management during all aspects of the construct phase including:
                              i.       A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
                                       Control Devices (MUTCD) detailing all temporary signage and traffic control
                                       measures prior to construction;
                              ii.      Maintenance of safe pedestrian access across the frontage of the site both during
                                       daily construction and after daily construction has ceased;
                              iii.     Proposed fencing to the site during the construction phase of the development;
                              iv.      Adequate parking arrangements for construction workers;
                              v.       No queuing of trucks is permitted on residential streets, especially prior to
                                       7.00am. Further parked trucks must have engines turned off;
                      b.      Maintenance and protection of water quality and existing drainage lines through the
                              construction site through the implementation of appropriate erosion and sediment
                              control measures;
                      c.      Establishment of a communication protocol with the general public, adjoining owners,
                              emergency services and local businesses to advise of agreed construction times,
                              impacts on traffic and services and other relevant issues;
                      d.      Include a post out to the local residents and businesses advising of the proposed
                              development, the expected time frames and the site contact details.
                      e.      Include signage in prominent locations on the boundaries of the site advising of the
                              proposed development, the expected time frames and the site contact details.
                      f.      identification of complaint management procedures including:


                                                                                                          Page 9 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 10

                              i.       contact details for the on-site manager
                              ii.      dispute resolution procedures
               10.    Prior to the prestart meeting and commencement of municipal works associated with this
                      development, Council requires the provision of a bank guarantee, or a cash bond, of $20,000.
               11.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               12.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               DURING CONSTRUCTION
                      Engineering
               13.    The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               14.    All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               15.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice;
                      a.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines;
                      b.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                      Pavement Design and Construction
               16.    Pavement design for privately owned works must be undertaken in accordance with the
                      relevant standards. Structural integrity of the driveway and car park areas will remain the
                      responsibility of the property owner/developer and must be certified by an RPEQ.
                      Works within Road Reserve/Reinstatement
               17.    Safe pedestrian access on all streets in the vicinity of the development must be maintained
                      at all times. Should footpath/road closures be necessary to carry out construction works,
                      Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               18.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles.
               19.    Electrical conduits or other services proposed to be installed within existing and proposed
                      road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
                      driveways or significant vegetation must be installed by boring. Trenching is not permitted,
                      unless specifically approved by Council.
                      Pathways
               20.    All pathways must be constructed in accordance with the following requirements:
                      a.      All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065;



                                                                                                    Page 10 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 11

                      b.      Provision must be made for disabled access at all kerb crossings associated with
                              pathways, in accordance with Council's current standards;
                      c.      All paths must have a slip resistant surface;
                      d.      Expansion and contraction joints must provide a flush finish. Installation of joints by
                              saw cutting is preferred to ensure a smooth ride for cyclists;
                      e.      The required work includes any modifications to ensure the footpath finishes flush with
                              all existing service covers and the like, or alternatively these services are raised or
                              altered, so as not to create a pedestrian safety hazard.
               21.    Pathways must:
                      a.      terminate in a manner that ensures smooth transition to existing surfaces for public
                              safety;
                      b.      be designed and constructed to comply with the Disability Discrimination Act (DDA),
                              Access to Premises Standard, Austroads and relevant sections of AS1428 Design for
                              access and mobility.
                      Site Access and Driveways
               22.    Driveway crossovers must be constructed generally in accordance with council’s Standard
                      Drawings RS-049, RS-050 and respective addendums.
               23.    Any existing unnecessary or redundant property accesses must be removed, and the kerb,
                      footpath and verge area reinstated to match the existing footpath and/or verge treatments.
                      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
                      or turf, and must be maintained by the developer until established.
               24.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      The driveway surfacing must consist of either an approved hot mixed asphaltic
                              concrete or patterned/plain concrete;
                      b.      The driveway must be constructed so as not to concentrate stormwater runoff onto
                              neighbouring properties;
                      c.      Where there is an existing pedestrian path, a matching crossfall must be provided for
                              the driveway on the alignment of the path, for the full width of the path;
                      d.      The property access must be located a minimum of 1m clear of existing power poles,
                              streetlights or other signage. The developer is responsible for any necessary relocation
                              of existing services to provide this clearance and must contact the relevant service
                              authorities and comply with their requirements in relation to these works.
                      Earthworks and Retaining Walls
               25.    All earthworks must be undertaken generally in accordance with Douglas Partners’
                      “Geotechnical Investigation” report, ref. R.001.docx BWE, dated 13 May 2021.
               26.    All earthworks must be undertaken in accordance with the provisions of AS 3798 Guidelines
                      on Earthworks for Commercial and Residential Development, with geotechnical testing
                      undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 2’ as
                      defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and
                      uniformity of fill must be provided by a RPEQ and submitted to Council prior to requesting
                      the On-Maintenance inspection.
               27.    Fall protection must be provided to retaining walls that are over 1m high.
               28.    Slope and batters are a maximum grade of:
                      a.      1 in 6 where in proximity to waterbodies;
                      b.      1 in 4 for grassed areas;
                      c.      1 in 3 for planted areas;


                                                                                                       Page 11 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 12

                      d.      1 in 2 for combined structural engineering and planting solutions.
                      Stormwater Drainage
               29.    Appropriate scour protection must be provided at the outlet of all stormwater pipes including
                      temporary outlets.
               30.    Works associated with this permit must not adversely impact on the existing drainage
                      conditions on other properties (e.g. by blocking or interfering with natural overland flows).
               31.    Construction of all internal stormwater drainage works must comply with the relevant
                      section/s of Australian Standard AS/NZS 3500.3.
                      Erosion and Sediment Control
               32.    Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
                      Regulation 2019) must not be released from the site or to waters within the site, or be likely
                      to be released should rainfall occur, unless all reasonable and practicable measures are
                      taken to prevent or minimise the release and concentration of contamination.
               33.    Sediment and erosion control measures must be in place prior to works commencing. If such
                      measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
                      fines can be issued if sediments from the site are found to enter or have the potential to enter
                      Council’s stormwater system, natural waterways, any downstream stormwater filtration
                      system or adversely impacting on other properties. The sediment and erosion control design
                      and measures have NOT been approved, it is the site's Supervising Engineer who is
                      responsible for ensuring that the sediment and erosion control measures have:
                      a.      Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
                              practise" methods;
                      b.      Been revised by an RPEQ or CPESC to address the issues raised by changes in the
                              projected construction schedule and/or methods;
                      c.      Been revised to address predicted rainfall events; and
                      d.      Achieve the desired environmental outcomes.
                      Council may request further controls to be installed should the implemented measures be
                      found inefficient.
               34.    The erosion and sediment control measures must be designed, installed and maintained in
                      accordance with the supervising engineer instructions and the current best practice
                      standards * (Refer to Advisory Note).
               35.    The developer must ensure non-essential exposure of soil is prevented by restricting the
                      extent of disturbance and minimising the duration of soil exposure to adverse weather
                      conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
                      to rainfall occurring.
               36.    The developer must ensure sediment does not leave the site or enter onto adjoining
                      properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
                      machinery. It is essential to implement appropriate approved erosion and sediment control
                      measures throughout the site during all phases of construction including vehicle shakedown
                      pad/grid (or similar) at the access to the construction site. Where sediments or other
                      contaminants are deposited on a road, they must be removed so as not to enter Council’s
                      drainage system or waterways.
               37.    Prior to the completion of the development and commencement of use, all site surfaces must
                      be effectively stabilised using methods which have achieved effective short-term stabilisation
                      and which will continue to achieve effective stabilisation in the medium to long-term. For the
                      purpose of this condition, an effectively stabilised surface is defined as one that does not, or
                      is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or
                      lead to sedimentation, or lead to water contamination.




                                                                                                        Page 12 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 13

                      Landscape
               38.    The development site must be landscaped. The works must be undertaken in accordance
                      Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
                      Landscaping Plans. In this regard, amended Landscape Plans must be provided to Council
                      prior to the pre-start meeting with the following changes:
                      a.      the following species are not approved and must be replaced with native species:
                              iii.     Poinciana
                              iv.      Pinstripe ginger
                              v.       Heliconia
                              vi.      Gardenia
                      b.      The Wodyetia bifurcata (foxtail palm) identified on the approved plans as ‘t4’ are not
                              approved and must be replaced with a suitable native screening feature tree. Palm’s
                              individually planted are not in accordance with PSP2 – Landscaping.
                      c.      t2 and t4 plantings must be 45litre pot size;
                      d.      2 x additional feature trees along the northern boundary, each one located opposite
                              the lower floor lounge/master suite (approximately)
                      e.      screening vegetation for the full length of the eastern boundary. The species must grow
                              to a minimum mature height of 6m and planted at 2m centres.
                      f.      provide 2 x Acronychia’s in each flared widening along the southern side of the
                              driveway
                      g.      provision of 4 x 45 litre street trees evenly spaced within the road reserve
               39.    The finished level of all mulch in garden beds and landscaped medians is to be a minimum
                      of 50mm below the level of the adjacent top of kerb. All landscaping is to be constructed in
                      accordance with Council’s Planning Scheme Policy PSP2 Landscaping.
               40.    Suitable root barriers must be installed where proposed trees are adjacent to paths,
                      pavement etc in accordance with Council’s Planning Scheme Policy PSP2 Landscaping.
                      Damage to Services and Assets
               41.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               FOLLOWING CONSTRUCTION
                      Certification
               42.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the Operational Works permit.
               43.    A condition report of the drainage system must be completed and submitted to council prior
                      to requesting the On-Maintenance inspection. The condition report is to include:
                      a.      a CCTV inspection of the new stormwater line, extending between the existing
                              stormwater gully pit on James Street and the connecting pit on Weyba Road;
                      b.      photos of the existing stormwater gully pit on James St fronting the subject site;
                      c.      photos of the existing eastern most pit on the subject site.



                                                                                                        Page 13 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 14

                      As Constructed Plans and ADAC XML Files (Council)
               44.    Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory
                      “As-Constructed” records must be submitted to Council. The bundle of “As Constructed”
                      information must include:
                      a.      As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing
                              file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the
                              accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and;
                      b.      ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed)
                              prepared in accordance with industry standards and recorded in “MGA - UTM56 /
                              GDA94” projection.
                              Please Note: Further information and advice relating to the as-constructed drawing
                              presentation, as-constructed survey capture and associated guidelines for preparation
                              of a compliant ADAC XML digital file are available on the webpage titled “As-
                              Constructed Guidelines” and accessible at the Noosa Council Website: Planning &
                              Development / Development Tools & Guidelines / As-Constructed Guidelines.
                      c.      The “As-Constructed” drawings will require certification by a:
                              vii.     Qualified experienced Civil Engineer (RPEQ) confirming design intent and
                                       conformance with applicable standards and specifications, along with the
                                       relevant descriptions of assets, services and structures and;
                              viii.    Licensed Surveyor in regard to the cadastral and locational information, levels
                                       and applicable survey datum.
                      d.      The data must be in accordance with Council’s “Planning Scheme Policy 6 –
                              Engineering Design Standards”, and fully detail the levels for all engineering works
                              including but not limited to the drainage network and structures, finished ground and
                              pavement surface levels.
                      On Maintenance
               45.    All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
                      Council’s relevant Planning Scheme Policy prior to commencement of the use. To achieve
                      ‘On Maintenance’, the supervising RPEQ must submit to Council:
                      a.      certification that all works have been undertaken and completed in accordance with the
                              requirements of this Permit;
                      b.      as Constructed details in accordance with Council’s Planning Scheme Policy;
                      c.      maintenance and operational manuals for all proprietary or site specific devices.
                      Off Maintenance
               46.    Prior to requesting an Off Maintenance inspection the developer must provide a written
                      request for the Off Maintenance inspection.
               47.    A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
                      where:
                      a.      a Council inspection reveals works do not comply with approval requirements;
                      b.      submitted certification falsely states works comply with approval requirements.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:




                                                                                                       Page 14 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 15

               PLANNING
                      Aboriginal Cultural Heritage Act 2003
               1.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
                      Equitable Access and Facilities
               2.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in addition
                      to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:
                      a.      the Disability Discrimination Act 1992 (Commonwealth);
                      b.      the Anti-Discrimination Act 1991 (Queensland); and
                      c.      the Disability (Access to Premises – Buildings) Standards.
                      Development Compliance Inspection
               3.     Prior to the commencement of the use, please contact Council's Development Assessment
                      Branch to arrange a Development Compliance Inspection.
                      Infrastructure Charges
               4.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
                      General Advisory Notes
               5.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               6.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               7.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Prestart, On and Off Maintenance Inspections Request
               8.     Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
                      business days’ notice of preferred inspection time.




                                                                                                           Page 15 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 16

               9.     If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.
               10.    A minimum maintenance period of 12 months will apply to all municipal works and thereafter
                      until such time as the works are performing in accordance with the approved design unless
                      noted otherwise
                      Environmental Advisory Notes
               11.    The Environmental Protection Act 1994 states that a person must not carry out any activity
                      that causes, or is likely to cause, environmental harm unless the person takes all reasonable
                      and practicable measures to prevent or minimise the harm. Environmental harm includes
                      environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
                      construction and landscaping phases of this development are to adhere to their ‘general
                      environmental duty’ to minimise the risk of causing environmental harm.
                      Erosion and Sediment Control
               12.    Accepted best practice standards include International Erosion Control Association
                      Australasia Best Practice Erosion and Sediment Control
               13.    Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
                      in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
                      Engineer of Queensland (RPEQ).
               14.    As a general rule, a site is determined to have achieved effective short-term stabilisation if
                      at the time of the On-Maintenance inspection:
                      a.      Methods of stabilisation are:
                                      appropriate for slopes and slope lengths; and
                                      are consistent with best practice environmental management practices such as
                                       in the Manual for Erosion and Sediment Control or the IECA Manual; and
                      b.      Stormwater runoff from the site is not currently, and is not likely to result in visible
                              evidence of sedimentation or erosion, or lead to water contamination.
                              If at the time of request for the On-Maintenance inspection, the method of short-term
                              stabilisation has not achieved a level of stability that Council's Officers believe will have
                              a high probability of achieving long term stability (i.e. until house construction has
                              occurred on all lots), Council Officers may take the following matters into consideration
                              in determining whether the site is capable of achieving medium to long-term stability:
                                      evidence that the site has been effectively stabilised in the short term;
                                      evidence that soil has been adequately ameliorated;
                                      evidence that seed of annual and perennial grass species has been applied at
                                       an adequate rate; and
                                      that grass seed has germinated at a density that is likely to achieve an effective
                                       grass cover.
                      ENVIRONMENTAL HEALTH
                      Building Works
               15.    Noise from residential building works shall comply with the following:
                      a.      Limited to between 6:30am to 6:30pm Monday to Saturday.
                      b.      All reasonable measures are taken to minimise noise emissions
                      c.      Not permitted on Sunday or public holidays.
                      Measurement of Noise
               16.    Measurement of sound pressure levels (adjusted for tonality and impulse) must be in
                      accordance with either:

                                                                                                           Page 16 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 17

                      a.      Australian Standard AS1055.1 “Acoustics–Description            and    measurement         of
                              environmental noise – General procedures”, or
                      b.      The relevant “Noise Measurement Manual” as provided by the Department of
                              Environment and Heritage Protection.
               17.    A qualified person is considered to be either:
                      a.      a Registered Professional Engineer of Queensland, or;
                      b.      an environmental consultant with a minimum of 3 years current experience in the field
                              of acoustics.
                      Acoustic Advice & Design
               18.    It is highly recommended that the developer seek the advice and design input of a qualified
                      acoustic consultant at the plan development stage to ensure the development does not cause
                      a noise nuisance under the Environmental Protection Act 1994. Attention should be given
                      to the following (but not limited to):
                      a.      building design and construction
                      b.      design, selection and installation of fixed plant and equipment
                      c.      he location of air conditioning and heating units, refrigeration plant, pumps, mechanical
                              exhausts and plant rooms etc
                      d.      the use of acoustic enclosures/screens around noisy plant and equipment.
                      e.      operating times.
                      Environmental Protection
               19.    The development should be undertaken in a manner that causes no unlawful environmental
                      nuisance under the Environmental Protection Act 1994 by the creation of excessive noise,
                      lighting, waste, atmospheric pollutants (including dust or odours) or other releases to the
                      environment.
               20.    In accordance with the Environmental Protection Act 1994, all sand, silt, mud, paint, cement,
                      concrete, builder’s waste or other prescribed contaminants should not to be released to or
                      be placed where it could reasonably be expected to move into a roadside gutter, storm water
                      drain or a watercourse. On the spot fines apply for such offences.
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required                Subject of the required Development Permit

                Development Permit for Building Works              All building work.

               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If


                                                                                                        Page 17 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 18

               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully




               Patrick Murphy
               Coordinator Planning



               Enc:   Appeal Rights
                      Approved Plans
               cc.    Unitywater




                                                                                                     Page 18 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

Page 19

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 19 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.