38. The development site must be landscaped. The works must be undertaken in accordance
Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
Landscaping Plans. In this regard, amended Landscape Plans must be provided to Council
prior to the pre-start meeting with the following changes:
a. the following species are not approved and must be replaced with native species:
iii. Poinciana
iv. Pinstripe ginger
v. Heliconia
vi. Gardenia
b. The Wodyetia bifurcata (foxtail palm) identified on the approved plans as ‘t4’ are not
approved and must be replaced with a suitable native screening feature tree. Palm’s
individually planted are not in accordance with PSP2 – Landscaping.
c. t2 and t4 plantings must be 45litre pot size;
d. 2 x additional feature trees along the northern boundary, each one located opposite
the lower floor lounge/master suite (approximately)
e. screening vegetation for the full length of the eastern boundary. The species must grow
to a minimum mature height of 6m and planted at 2m centres.
f. provide 2 x Acronychia’s in each flared widening along the southern side of the
driveway
g. provision of 4 x 45 litre street trees evenly spaced within the road reserve
39. The finished level of all mulch in garden beds and landscaped medians is to be a minimum
of 50mm below the level of the adjacent top of kerb. All landscaping is to be constructed in
accordance with Council’s Planning Scheme Policy PSP2 Landscaping.
40. Suitable root barriers must be installed where proposed trees are adjacent to paths,
pavement etc in accordance with Council’s Planning Scheme Policy PSP2 Landscaping.
Damage to Services and Assets
41. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION
Certification
42. Upon completion of the work a certificate must be issued by an RPEQ certifying that the
works have been constructed in accordance with the Operational Works permit.
43. A condition report of the drainage system must be completed and submitted to council prior
to requesting the On-Maintenance inspection. The condition report is to include:
a. a CCTV inspection of the new stormwater line, extending between the existing
stormwater gully pit on James Street and the connecting pit on Weyba Road;
b. photos of the existing stormwater gully pit on James St fronting the subject site;
c. photos of the existing eastern most pit on the subject site.
Page 13 of 19
Document Set ID: 21498653
Version: 7, Version Date: 17/06/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.