Original source · versioned page text
2020-07-16 SM Agenda - Item 1 - Attachment 4 - Final Noosa Plan 2020 Part 7
The original of this document is very large (23.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance Outcomes Acceptable Outcomes
movement of aircraft within the Sunshine Coast Airport’s (a) do not emit smoke, dust, ash or steam into the Sunshine
operational airspace through the emission of particulate gases or Coast Airport’s operational airspace; and
other materials that may cause air turbulence, reduce visibility or
(b) do not emit a gaseous plume into the Sunshine Coast
affect aircraft engine performance.
Airport’s operational airspace at a velocity exceeding 4.3
metres per second as identified on Map AEM1 Airport
Environment Map.
Figure 7.2.6.4 Peregian Beach Framework & Character Plan
Click HERE for a high resolution PDF
Figure 7.2.6.5 Contextual view Peregian Beach
Rufus Street to Mt Coolum
NOOSA PLAN 2020 Page 71 of 74
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.