20080490 - Decision Notice [As Published] · 112008.490

of 32

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Assessment Mangers Conditions:

General

Pursuant to the provisions of the Integrated Planning Act 1997 and the Building Act 1975 and
made thereunder, permission to undertake the building work as outlined above is subject to
the following conditions: -

1,

All works subject to this approval are to be completed, inclusive of satisfactory final
inspection and submission of all associated certificates and documentation, no later
than 2 years after the date of approval or this approval will lapse.

Should this approval lapse, a new Development Approval for Building Works will be
required prior to continuance of any assessable development or inspection and will be
subject to compliance with legislative amendments that may have occurred in the
interim period.

 

2. All conditions of this permit shall be complied with prior to the issue of a Form 21 -
Final Inspection Certificate.

3. Oncompletion, the building or structure may only be used for purposes pursuant to the
abovementioned Classification as defined by the Building Code of Australia.

4. The builder must ensure a notice of inspection is given to Noosa Building Certifiers
(Ph. 5442 4778) before proceeding past the following stages of construction. Please
note, a minimum of 48 Hours Notice is required for inspections: -

Mandatory Inspection Type [ Inspection to be undertaken by

 

Building General

 

Footing excavations (including pier holes) with
reinforcing steel in place, prior to the placement of
concrete.

A Registered Professional Engineer
of Queensland

 

Slabs, including suspended slabs, with formwork
and reinforcing steel in place prior to the placement
of concrete.

A Registered Professional Engineer
of Queensland

 

Masonry Block Work, with reinforcing steel in
place, prior to the placement of concrete block fill.

A Registered Professional Engineer
of Queensland

 

Framing, including structural members, tie-down
and bracing prior to the installation of linings.

A Registered Professional Engineer
of Queensland

 

 

Final, on completion of all works relating to this
approval. -

 

Noosa Building Certifiers

 

 

Inspections will be undertaken in accordance with the Guidelines for the Inspections of
Class 1 and 10 Buildings and Structures prepared by the Department of Local
Government and Planning (Qld) effective 14 November 2003.

You are reminded that work is not to proceed past a stage of mandatory inspection until
Noosa Building Certifiers or a competent person lawfully acting on our behalf has

given authority for it to do so.

Where inspections are to be undertaken by Registered Professional Engineer of
Queensland, Noosa Building Certifiers must be advised of the Name and Registration
Number of the person responsible for the inspection prior to the event and we reserve

Page 2 of 8

 

Used in these records

About this file

File size
2.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20080490 - Decision Notice [As Published].pdf · 2.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.