Council archive · source document
20080490 - Decision Notice [As Published] · 112008.490
Assessment Mangers Conditions: General Pursuant to the provisions of the Integrated Planning Act 1997 and the Building Act 1975 and made thereunder, permission to undertake the building work as outlined above is subject to the following conditions: - 1, All works subject to this approval are to be completed, inclusive of satisfactory final inspection and submission of all associated certificates and documentation, no later than 2 years after the date of approval or this approval will lapse. Should this approval lapse, a new Development Approval for Building Works will be required prior to continuance of any assessable development or inspection and will be subject to compliance with legislative amendments that may have occurred in the interim period. 2. All conditions of this permit shall be complied with prior to the issue of a Form 21 - Final Inspection Certificate. 3. Oncompletion, the building or structure may only be used for purposes pursuant to the abovementioned Classification as defined by the Building Code of Australia. 4. The builder must ensure a notice of inspection is given to Noosa Building Certifiers (Ph. 5442 4778) before proceeding past the following stages of construction. Please note, a minimum of 48 Hours Notice is required for inspections: - Mandatory Inspection Type [ Inspection to be undertaken by Building General Footing excavations (including pier holes) with reinforcing steel in place, prior to the placement of concrete. A Registered Professional Engineer of Queensland Slabs, including suspended slabs, with formwork and reinforcing steel in place prior to the placement of concrete. A Registered Professional Engineer of Queensland Masonry Block Work, with reinforcing steel in place, prior to the placement of concrete block fill. A Registered Professional Engineer of Queensland Framing, including structural members, tie-down and bracing prior to the installation of linings. A Registered Professional Engineer of Queensland Final, on completion of all works relating to this approval. - Noosa Building Certifiers Inspections will be undertaken in accordance with the Guidelines for the Inspections of Class 1 and 10 Buildings and Structures prepared by the Department of Local Government and Planning (Qld) effective 14 November 2003. You are reminded that work is not to proceed past a stage of mandatory inspection until Noosa Building Certifiers or a competent person lawfully acting on our behalf has given authority for it to do so. Where inspections are to be undertaken by Registered Professional Engineer of Queensland, Noosa Building Certifiers must be advised of the Name and Registration Number of the person responsible for the inspection prior to the event and we reserve Page 2 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20080490 - Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.