20080490 - Decision Notice [As Published] · 112008.490
the right of veto should we not be satisfied as to experience or qualification of the proposed individual. All building work shall comply with the provisions of the Building Act 1975 and shall be in accordance with the approval documents including any amendments or conditions shown in red. Submission of a further application for approval of any proposed alteration or modification of any drawing or specifications pertaining to this building approval. A certified legible copy of the approved drawings and specifications is to be on the building site, available for inspection by the Building Certifier at all times. This Development Approval for Building Works does not incorporate the approval of any sanitary drainage or plumbing works. Separate approval from Sunshine Coast Regional Council Plumbing is required prior to commencing any such works. Certificates/ Documentation 9. Certification: - The following certificates of inspection and compliance are to be submitted from a suitably qualified person prior to the issue of a Form 21 — Final Inspection Certificate: (a) Registered Professional Engineer of Queensland certificates of satisfactory inspection of (1) Pool Steel, (2) Footings (including pier holes); (3) Floor Slabs (including suspended slabs); (4) Masonry Block Work ;(5) Retaining Walls and (6) Structural (framing bracing and tie down); (b) Termite Barrier installation certificates; (c) Truss Certificate and Layout; (d) Pre Fabricated Frame Certificate and Layout (if applicable); (e) Glass and window certificate; (f) Shower screen safety glass installation certificate; (g) Certificate for waterproofing application; (h) Smoke alarms; The Building Certifier may require additional certification / documentation under certain circumstances. The applicant will be advised if this is a requirement as the need arises, Acceptability of certificates/documents is at the discretion of the Building Certifier, acceptance of certificates is subject to the suitably qualified person being recognized as competent prior to certification of the building element. All certificates are to be submitted in the approved form (Form 16) or equivalent. Local Authority Infrastructure 10. li. All services that may be affected by this construction shall be accurately located for alignment and/or depth prior to commencement of works. Where sewer or stormwater access chambers are located within the property they are to remain uncovered and accessible during and after construction. Should difficulty arise in locating any service please contact Sunshine Coast Regional Council Water & Sewerage. This approval does not include water connection. In most instances a separate application will be required from Sunshine Coast Regional Council Plumbing. . Page 3 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20080490 - Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.