Development Application part 2 Report and Plans MCU13/0053

of 131

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (117 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                     SCRC CORRESPONDENCE


               Place barcode here
                                    11111111111
                                          80538890

     THIS IS THE NEXT PART OF A
    MULTIPLE PART RECORD
                                                                  .
                                                              -




                                             r-r"     ~8(8t           \]1 F5
I




                                     QO s.3
/
                           fV\c)A\ ~ !
                                                  I
Log in to download the original file

Development Application part 2 Report and Plans MCU13_0053.pdf · 117 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of pages 2 to 79 (of 131)

Page 2

.’-;ydore
                    iV.;’~1
                      \.

                              11
                              MAR
                              2013
                                     :J1V+psnt
                                                 Counter

            NLimted B Ca


[OCR of page images]
Broadbanding
Australia

Planning Report

Proposed Fixed Wireless Facility

153 Lake Flat Road
Boreen Point 4565

NBN Site Reference
NBN-4NBZ-4POM-5135 — Boreen Point

Prepared on behalf of NBN Co Limited
by Aurecon Australia Pty Ltd

 

Page 3

    Document Control,’Record

    Document prepared by:


    Aurecon Australia Pty Ltd
    ABN 54 005 139 873

    Lev.el 14, 32 T rbot Street
    Brisbane QLD 4000

    Locked Bag 331        ’




    Brisbane QLD 4001
    Australia


    T        +61 7 3173 8000

    F        +61 7 3173 8001

    E        brisbane@aurecongroup,com
    w        aurecongroup.com




    A person using’Aurecon documents or data accepts the risk of:

    a)       Using the documents of data in electronic form without requesting and chec~ing them for accuracy against
             the original hard copy version,

    b)       Using the ’documents or data for any purpose not agreed to in writing by Aur,econ.

                                                                 -         -




I    Document control                                                                                    aurecon


    Report Title                      Plarinin’g Assessment Report (Impact Assessment) Proposed Telecommunication
                                      Facility at Lake Flat Rd, Soreen Point QLD 4565
    Document 10                    ’Planning Assessment Report        Project Number          226420-001~01

                                      (Imp~ctAsse~sment)                                                                   ,   ,




    File Path                         P:\Telo\6. Ericsson NBN\Site Clusters\Nambour Cluster\Site Folders\Soreen
                                      Point\Planning\Development Application
                                                                                        ..




    Client                                                Client Contact                 ..                   ,   ..




    Rev           Date                Revision            Prepared by          Author    Verifier        Approver
                                      Details/Status
    01            15/01/2013          DRA~T               KR                   KR        AH              AH

    02            31/01/2013          FINAL               CH                   CH        AH              AH
                                  ,   ,




    Current Revision                  2    :



         ,   ,




    NBN-4NBZ-4POM-5135           -    Boreen Point                                                                Page 1

Page 4

Table of Contents

Document Control Record.......................................................................1

EXECUTIVE SUMMARY .............................................................................4

1.0     INTRODUCTION ..............................................................................5

2.0       BACKGROUND ...............................................................................6

  2.1      NBN Co and the National Broadband Network                             ......................................................
                                                                                                                                          6

  2.2      What is Fixed Wireless and how is it different to Mobile Broadband? ...................6

  2.3      The Fixed Wireless Network                -

                                                         Interdependencies ..................................................6

3.0      SITE SELECTION            ..............................................................................
                                                                                                                              9

  3.1      Identification of areas requiring Fixed Wireless coverage...................................... 9

  3.2      Site Selection Parameters......................................................................................9

  3.3      Candidate Sites....................................................        ................................................
                                                                                                                                         10

4.0     SUBJECT SITE & SURROUNDS.......................................................14

  4.1      Site Details...........................    ...............................................................................
                                                                                                                                         14

  4.2      Site Surrounds..................................................................................................... 17

5.0     THE PROPOSAL ..............................................................................18

  5.1      Facility and Equipment Details                 ............................................................................
                                                                                                                                         18

  5.2      Site Selection.......................................................................................................21

6.0     CURRENT PLANNING CONTROLS ..................................................22

  6.1      Commonwealth Legislation                 -
                                                         The Telecommunications Act 1997........................22

  6.2      State Legislation       -
                                      Sustainable Planning Act 2009                   ...............................................
                                                                                                                                         22

  6.3      State Legislation       -


                                      Vegetation Management Act 1999......................................... 22

  6.4      State Planning Policy Framework                   ........................................................................
                                                                                                                                         24

  6.5      Draft Coastal Protection State Planning Regulatory Provision.............................. 27

  6.6      Regional Plan....................................................................................................... 27
  6.7      Referral Agencies         ................................................................................................
                                                                                                                                         28

  6.8      Local Government Regulatory Framework ..........................................................28

  6.8.1    Planning Scheme use definition...........................................................................28

7.0      PLANNING CONSIDERATIONS ......................................................33

  7.1 Desired Environmental Outcomes ...........................................................................33

  7.2 Applicable Codes .....................................................................................................36




NBN-4NBZ-4POM-5135         -   Boreen Point                                                                                 Page 2

Page 5

  7.2.1 Boreen Point, Kin Kin & Cootharaba Locality Code ................................................36

  7.2.2 Infrastructure Uses Code ......................................................................................39

  7.2.3 Earthworks Code ..................................................................................................40

  7.2.4 Landscaping Code .................................................................................................41

  7.2.5 Driveways and Carparking Code............................:..........................:....................42

  7.2.6 Biodiversity Overlay Code ..............................................:.........................................43

  7.2.7 Natural Hazards Overlay Code ..............................................................................44

  7.2.8 Natural Resources Overlay Code............................................................................45

8.0     OTHER ENVIRONMENTAL CONSTRAINTS AND OPPORTUNITIES ...46

  8.1     Visual Amenity and Setting.............................................................................:....46

  8.2     Heritage ......................................................................................::.:....................51
  8.3     Electrical Interference and Grounding of the Facility                       ...........................................
                                                                                                                                     51

  8.4     Erosion, Sedimentation Control and Waste Management ...........~.::.................... 51

  8.5     Remnant and Regrowth Vegetation                     ....................................................................
                                                                                                                                     52

  8.6     Flora and Fauna & Endangered Species ................................................................52

  8.7     Social and Economic Impacts............................................................................... 52

  8.8     Public Safety.........................................................................................................52

  8.9     The Public Interest and the Benefits of Telecommunications............................... 53

9.0     CONCLUSION ...............................................................................55




APPENDICES

Appendix 1-Transmission Imagery

Appendix 2 Copy of Title
              -




Appendix 3    -

                  Proposal Plans

Appendix 4    -
                  Code Table Assessment

Appendix 5 Environmental Searches
              -




Appendix 6    -
                  ARPANSA EME Report


Appendix 7    -
                  Communications Plan and Advertising




NBN-4NBZ-4POM-5135        -   Boreen Point                                                                            Page 3

Page 6

EXECUTIVE SUMMARY

                              NBN Co propose to install a new fixed wireless broadband
                              facility at Boreen Point comprised of the following:
                                       30 m monopole;
                                        1 X parabolic dish antenna;
                                       2 X panel antennas;
                                        2 X remote radio units;
                                        2 X 0.65 m2 outdoor cabinets (one future & one
                                        proposed); &
                                        Ancillary equipment associated with operation of
                                        facility, including cable trays, cabling, safe access
                                        methods, bird proofing, earthing, electrical works
                                        and air-conditioning equipment.



                              The proposed facility is necessary to provide NBN Co fixed
                              wireless broadband coverage to the Boreen Point region.



                              Lot & Plan No: Lot 2 RP126723
                              Street Address: 153 Lake Flat Road, Boreen Point QLD
                              4565
                              Property Owner: Graeme Arbuckle

                              Council: Sunshine Coast Regional Council
                              Zones: Boreen Point Kin Kin & Cootharaba Locality         -




                              Rural Zone
                              Overlays: Refer to Section 6.8.3
                              Use Definition: Infrastructures Use, Service & Utility (Type
                              3-T

                              Relevant State, Regional & Local Planning
                              Policies
                                                                                  Complies

                              The Noosa Plan 2009                                 Yes


                              South East Queensland Regional Plan
                                                                                  Yes
                              2009-2031


                              State Planning Policies                             Yes


                              Use and development of the land for the purposes of
                              construction & operation of a Telecommunication Facility
                             (Fixed Wireless Broadband)

                              NBN Co Limited (NBN Co)
                              c/- Aurecon
                              Locked Bag 331
                              Brisbane QLD 4001
                              Contact: Claire Harris
                              Our Ref: Boreen Point- NBN




NBN-4NBZ-4POM-5135   -   Boreen Point                                                       Page 4

Page 7

     1.0 :::: :’: INTRODUCTION

NBN Co has engaged Ericsson as the equipment vendor and project manager to establish
the fixed wireless component of the National Broadband Network (or NBN). Ericsson has
consequently engaged                Aurecon     Australia     to   act   on   its   behalf   in   relation   to   the
establishment of the required fixed wireless network infrastructure.


The NBN is a high speed broadband network that utilises a combination of optical fibre,
fixed     wireless    and       satellite   technology   to    offer     advanced     broadband. services          to
    households and businesses across Australia. As part of the Australia wide progressive roll
out, these improvements to broadband services will ultimately deliver benefits .to various
areas such as business, education, entertainment and                     health.


To enable the fixed wireless component of this network, NBN Co requires a fixed wireless
transmission site to provide high speed wireless broadband coverage to the Boreen Point
area; and also to serve as a                key communications anchor point for other NBN Wireless
facilities in the wider region.


An in-depth site selection process was undertaken in the area prior to confirming the site
as     the   preferred location. This process matched potential candidates against four key
factors, namely:
       .     Town planning considerations (such as zoning, surrounding land uses,
             environmental significance and visual impact);

       .     The ability of the site to provide acceptable coverage levels to the area;

       .     Construction feasibility; and

       .     The ability for NBN Co to secure a lease agreement with the landowner.


This application seeks planning consent for:
.




        .    A 30 m monopole;

        .    Radio transmission equipment; and

        .    Outdoor equipment cabinets.


The facility will be located at 153 lake Flat Road, Boreen Point; legally described as lot 2
on RP126723.



This submission provides an assessment of the relevant planning guidelines applicable to
the project site and proposed land use. This report demonstrates that:

       .     The proposed site is appropriately located within an existing highly modified rural
             area largely used for intensive agricultural cropping land and provides an adequate

             separation distance from environmentally and community sensitive land uses;
       .     The site will achieve the required coverage objectives for the area;

       .     The proposal complies with the Noosa Plan 2009 and the Sustainable Planning Act
             2009;
       .     The proposal operates within the regulatory framework of Commonwealth, State
             and local Government; and

       .     The facility operates within all current and relevant standards and is regulated by
             the Australian Communications and Media Authority.




NBN-4NBZ-4POM-5135          -
                                Boreen Point                                                             Page 5

Page 8

2.0               BACKGROUND
2.1     NBN Co and the National Broadband Network

NBN Co is a Government Business Enterprise and is a wholly Federal Government owned
company established to design, build and operate the National Broadband Network (NBN).

The NBN seeks to deliver high speed broadband to all Australian households, businesses
and   enterprises through a combination of fibre, wireless and satellite technology. The
NBN will service 93% of homes, schools and workplaces with optical fibre connection
(fibre to the premises or "FTTP"), providing superfast broadband services to Australians in
both urban and regional towns. For the remaining 7% of sites located outside the fibre
network boundary, NBN Co will utilise a combination of next generation fixed wireless and
satellite technologies.


2.2     What is Fixed Wireless and how is it different to Mobile
        Broadband?

Fixed Wireless is a network of base station facilities that provide a broadband service via
radio transmissions. These base stations communicate directly with antennas fixed to
individual premises (e.g. dwellings or businesses) to deliver wireless broadband access.


While a mobile network caters to unpredictable numbers of concurrent users at unknown,
transient locations, the Fixed Wireless network communicates to          a   known number of
subscribers in fixed locations.


This design difference means that the Fixed Wireless network can target higher levels of
assurance, quality and speed than mobile broadband services, even in peak times of use.
By quantifying the number of subscribers each facility is designed to service, NBN Co
ensures  that the fixed wireless network has the capacity to deliver high-speed data
transfer.


The Fixed Wireless network is capable of delivering a minimum peak download speed of
12 Mbps, regardless of the distance of the      premises to the facility. This is also an
important distinction to existing ADSL services, where download speeds fall off
significantly the further away a user is from the nearest exchange. The Fixed Wireless
network thereby provides more universal access to reliable, high-speed broadband
services.


Fixed Wireless is not impeded by the variables that affect mobile networks, and as such
can   offer   reliably faster, more universally   accessible broadband   speeds with greater
certainty.

2.3     The Fixed Wireless Network                -
                                                      Interdependencies

Although the Fixed Wireless facilities are submitted to Council as stand-alone
developments from a planning perspective, from a technical perspective, they are highly
interdependent connected to each other to form a daisy chain of facilities that link back
                  -




to the fibre network via a series of radio transmission dishes.


Each    Fixed    Wirelessfacility comprises of two or three panel antennas, which
communicate directly with the premises. The data transmitted to and from these panel
antennas is then relayed via a chain of radio transmission dishes back to the fibre network.




NBN-4NBZ-4POM-5135     -
                           Boreen Point                                             Page 6

Page 9

This is referred to as the "transmission network". The transmission network requires line of
sight from facility to facility until it reaches  Fixed Wireless facility that is physically
connected to the fibre network (referred to as the "Fibre HUB").


The Fixed Wireless network remains unconnected without this transmission network. A
break in this chain of transmission interdependencies can have flow on effects to multiple
communities, cutting them off from access to wireless broadband services.

Each NBN Co Fixed Wireless facility has been designed to heights that allow the panel
antennas to have clear line of sight to the surr                unding premises (radio coverage), and also
ensure that the radio transmission dish has clear line of sight to the adjoining network
facility to link the sites back into the broader network.

The character of the Fixed Wireless network is visually demonstrated through Figure 2.1
below. Additionally, Appendix 1                   pr’vides 3D imagery of the proposed Fixed Wireless
Network transmission links and the                     topographical challenges in the Sunshine Coast
Regional Council region.




                                                               ’Physical connection
                                                               to optica~ fibre. the
                                                                                  -




                                                               fibre spur




                                                                             Fixed wireless facility-
                                                                             the F:lbre Hub




                                                               Trransmission signal
                    Facility ooverage area                     o n   ecting tile faCilities



                                                                             Fixed wireless Ja.ility
                                                                             -wireles:>.Fiub site
       ..


            ..




                                                       /           "
                      lirans     ission signal.        /
                                                                        Trarismission signal
                      oonnecting the:facilities i                     \ connecling;[he faoilities
                                                   I                   ,
                                                  /                      \




                                                                                              Fixed whel~ facility
                                                                                              -
                                                                                                   sinl5:ii end

     Fixed ,,"’reless facility
     ---1Dowiui        gOd
                                                   Faoility ooverage area

                                      Figure 2.1: The fixed wireless network.




NBN-4NBZ-4POM-5135       -
                             Boreen Point                                                                   Page 7

Page 10

Specifically the Boreen Point site connects to the Boreen Point North site which is located
approximately 1.4 km north west and on the same 106 ha property (Lot 2 on RP126723).
Figure 2.2 below, illustrates the proposed location of Boreen Point and Boreen Point North
facilities.




      Figure 2.2: Location of Boreen Point North and Boreen Point Proposed Facilities (Source:Google Earth)


The proposed site has been designed specifically to provide service to the concentrated
residential settlement in Boreen Point, whereas the Boreen Point North                          facility is an
essential wireless hub site for the larger network as it can obtain line of site to the other
wireless facilities located further away where a 30 m monopole in the location of Boreen
Point cannot. Therefore the Boreen Point North    facility (which will be provided in a
separate Development Application) not only provides wireless broadband services to
surrounding premises (specifically the scattered residential dwellings along Lake Flat
Road, Kildeys Road and Cootharaba Road) but is also a critical connection point for other
fixed wireless facilities located further away from the fibre network. In summary Boreen
Point North will enable data from both facilities at Boreen Point North and Boreen Point to
be   relayed back to the fibre network via a chain of transmission dishes, as described
above.




NBN-4NBZ-4POM-5135       -
                             Boreen Point                                                            Page 8

Page 11

     3.0                SITE SELECTION
     Planning for a new fixed wireless broadband facility is a complex process. NBN                         Co
     conducts a rigorous multi-stage scoping process, as outlined below.


     3.1        Identification of areas requiring Fixed Wireless .coverage

     The NBN Co Fixed Wireless locations will be determined by a number of factors including
     the availability of both the NBN Co Fibre transit network and the availabi,lity of Point of
     Interconnect (POI)facilities to allow for the installation of NBN Co equipment. NBN Co
     uses a     number of methods to identify those parts of Australia.that require Fixed Wireless
     cqverage. When an are          is identified as requiring Fixed Wireless coverage,.investigations
     are undertaken to determine the measures required to provide this coverage.
                                                                                              .




     NBN Co has identified a requfrement to provide a fixed wireless facility in Boreen ’Point.
     The facility will provide Fixed Wireless coverage to dwellings in the Boreen Point area, in
     addition to serving as a key communications link for other N6N Fixed Wireless facilities in
     the wider Sunshine Coast region.


     3.2        Site Selection Param’eters

     NBN Co identifies an area where the requirement for a Fixed Wireless broadband. facility
     would      be   highest" a ’search area.’      .
                                                        A   preliminary investigation of the area    is then
     undertaken, in conjunction with            planning      and   prop’erty consultants;’ tadiofrequency
     engineers and designers in order to identify possible locations to establish.a facility.

     Generally, new sites must be located within, or immediately adjacent to, the identified
     search  area in order to be technically feasible. However, ’while the operational and

     geographical aspects of depl9ying new facilities are primary factors, there are also.’many
     other issues that influence network design, which have to be resolved in parallel.

     Some of the issues that are cOllsidered inch.lde:
           .    visual amenity

.
    :....: ’.
    ....   ..
                potential co-location opportunities                                      .




           . the availability qnd suitability of land as well as a willing site provider
                                                                              ~’-
                                                                                    .




           .    occCJpational health ~nd safety
           .    construction issues (including structural .and loading fe’asibility and           access    for
                                                ,




                maintenance purposes)
           .    topographical constraints affecting network line of site
           .    legislative policy constraints
           .    environmental impacts
           .    cost implications.


     The number, type and height of ’facilities required to comp.lete the Fixed Wireless network
     are   largely determined by the operational, geographical and other factors discussed
     above, which influence final network design. These compounding factors often severely
     restrict the available search area within which a facility can be established to provide
     relia,ble Fixed Wireless broadband to a local community.




     NBN-4NBZ-4POM-5135      -   Boreen Point                                                      Page 9

Page 12

3.3     Candidate Sites

Following the identification of the search area for the Soreen Point facility, a number of
candidate sites were examined around the search area. Each candidate was assessed
based   on   the
               ability to meet the coverage objectives and site considerations detailed
above. A total of three (3) candidates were selected for in-depth investigation for the
Soreen Point facility, as per Figure 3.1 below.


NSN Co endeavours to avoid          locating search areas in close proximity to residential
localities and potentially sensitive land uses, where practicable. The Soreen Point site is
comprised predominantly of rural land uses, with scattered residential dwellings. As such,
it is considered that the Soreen Point area provides an appropriate location for a facility,
given the physical separation provided from residential and other sensitive land uses.




                     Figure 3.1: Location of Candidate Sites (Source:Google Earth)

A summary of the proposed candidates is located              below, including a description of the
opportunities and constraints that each site afforded.




NBN-4NBZ-4POM-5135   -
                         Boreen Point                                                   Page 10

Page 13

      Candidate A: Sports Reserve, Lot 300 on SP140491, Louis Sazzo Drive, Soreen Point.


      Candidate A investigated the erection of a 30 m monopole on 6.8ha parcel of land within
      the ’Soreen Point, Kin Kin & Cootharaba Locality     Open Space and Recreation Zone’
                                                              -




      under the Noosa Plan 2009. The      property is owned by the Department of Natural
      Resources and Mines and is currently used as a sporting and recreational reserve.


      A 30 m monopole in the location of Candidate A would provide adequate coverage to the
      targeted localities throughout Soreen Point, however would be located in close proximity to
      multiple residential dwellings and land zoned for ~Detached Housing’. Additionally the
      location of the facility in close proximity to the main residential area of Screen Point has
      the potential to create adverse visual impacts.


      Pursuing this candidate was deemed unnecessary given that Candidate. B provided a
      more appropriate option in terms of achieving NSN’s c verage objectives, as well as

      providiOg more appropriate :visual screening benefits. Furthermore, the land owners were
      unwilling to agree to commercial terms to enable the development. For these reasons
                                                                       .




      Candidate A was discounted.

        Candidate B: Private Property, Lot 2 on RP126723, 153 Lake Flat Road, Soreen Point.


        Candidate B relates to the current proposal and comprises the erection of a :new 30 m
  monopole on land within the. ’Soreen Point, Kin Kin & Cootharaba Locality _:. Rural Zon~’
      under the Noosa Plan 2009. The 106ha property. is predominantly used  as a pine tree

: plantation and also contains an ancillary shed in the centre of the site.




      The    locality surrounding the site is characterised by agricultural land         uses,   heavily
     vegetated     areas     associated rural. dwellings.’ Candidate B has been sited an
                            and
     appropriate separation .distance from env’ironmental and,c mmunity sensitive locations, as
     it is has been setback more than 240 m from the closest .residential dwelling and located,            .




     within proximity to only th’ree (3) residential’dwellings’ within ’a 500 m radius.: .The~e
     setbacks in coojunction with the natural veget tion on site will’ assist with visaally
    :integr.ating the m nopole within its surroundings and reducing the visual’ dominance of the
      structure:


;,.
      This site was determined to be the most appropriate location for the current facility as it is
.




      able’ to achieve NSN Co’s’ cove~age  objectives for the Soreen Point locality, ’whilst
      maximi~ing physical sep~ratiordrom commu~ity and environrn~,ntally sensitive locations.
    ,Thus mi’nimising the potential impacts a$5,9ci ted with the proposal. For these reasons,
    : Candidate B was considered   the most viable option and has b~en se,lected as the prime
    .                                                                              .




      candidate.


        Candidate C: Private Property, Lot2 on RP186787, 25 Lak
                                                                                                      .


                                                                           Flat Road, Soreen Point.
                                                .


                        ,




        Candidate C investigated the erection of a 30 m monopole on a 1.3ha parcel of land within
      the ’S’oreen Point, Kin Kin & Cootharaba Lbtality       -,  Rural Zone’ under the Noosa Plan

,
      2009. The property is he      vily vegetated’ and does not cont in any eXisting structures.
                                                                                         ~




      A 30 m mon     pole in the location of Candidate. C would provide adequate coverage to the
      targeted localities throughout Soreen Point, however would be located in close proximity to
      multiple residental -dwellings and land zoned for ’Detached Housing’. Additionally
      vegetation removal would be required and a facility in this, area adjacent to Lake Flat Road
      and in close proximity to the main residential area of Soreen Point has the potential to
      create adverse visual impacts.




      NBN-4NBZ-4POM-5135     -
                                 Boreen Point                                                 Page 11

Page 14

Pursuing this candidate was deemed unnecessary given that Candidate B provided a
more appropriate option in terms of achieving NBN’s coverage objectives, as well as

providing more appropriate separation from community sensitive locations. Furthermore,
the land owners were unwilling to agree to commercial terms to enable the development.
For these reasons Candidate C was discounted.


Co-location opportunities


The area of Boreen Point did not offer any possible or feasible co-location opportunities.
Figure 3.2 below illustrates the location of existing telecommunication facilities in the wider
area. Within a 10 km radius of the Candidate B (Prime)there is only one existing facility.
As shown the closest existing facility is located approximately 9.5 km south of Candidate B
(Prime)in the suburb of Cooroibah. This facility is outside of the search area for Boreen
Point and would not provide reliable coverage for those residing in the township.




           Figure 3.2: Existing telecommunication facilities in the wider area (Source:Google Earth)




NBN-4NBZ-4POM-5135     -   Boreen Point                                                                Page 12

Page 15

Prime Site Selection Reasons
Considering the factors identified above, Candjdate B was ranked as the preferred location
for the facility as the site is able to meet NBN’s target coverage objectives, whilst
maximising physical separation from surrounding rural-residential properties and
minimising potential visual amenity impacts. In summary, the site is considered to be the
best solution of the three candidates considered because:


       The site is appropriately located within a rural area which is characterised by large
       farming properties, heavily vegetated hinterland areas and large rural-residential
       allotments;
   .   The proposed location provides an adequate separation distance from community
       s,ensitive land uses and is setback more than 240 m from the closest residential
       dwelling and located within proximity to only three (3)residential dwellings within a
       500 m radius;

   .   The   facility has been appropriately located on a highly modified subject site
       predominantly used for forestry and logging purposes and containing similar
       electrical infrastructure such as the energex electricity network which runs from
       north to sduth through the property;

   .   The proposed facility is located a sufficient buffer distance from environmentally
       sensitive locations (approximately 200 m from Lake Cootharaba) an      no   vegetation
       removal will be required;

   .   The location   provides line of sight to other planned sites in the NBN wireless
       network specifically Boreen Point North; and

   .   The  siting of a Telecommunication Facility on this site will meet coverage
       objectives for the area, whilst minimising visual impact given the presence of
       mature vegetation surrounding the site which will assist with visually integrating the
       monopole within its surroundings and reducing the visual dominance of the
       structure.




NBN-4NBZ-4POM-5135    -
                          Boreen Point                                              P ge 13

Page 16

4.0                   SUBJECT SITE & SURROUNDS

4.1     Site Details

The subject site is located at 153 Lake Flat Rd, Soreen Point. The site is legally described
as Lot 2 on       RP126723 and has an approximate land area of 106 ha. The topography of
the site is relatively flat, and the site is situated on relatively low terrain, ranging from 29 m
AHD at its highest point in the north-west to 10m AHD at its lowest point, in the south-
eastern   corner, where         proposed facility will be located. The Local Government
                                the
Authority for the proposal is the Sunshine Coast Regional Council and the site is currently
included in the ’Soreen Point, Kin Kin and Cootharaba locality      Rural Zone’ under the
                                                                                      -




Noosa Plan 2009. Figure 4.1 illustrates the proposed subject site and location of the
facility (indicated in yellow).



                                                                                          j~
                                                                                      ~l
                                                                                      r
                  I




              I
              ,
             I




                                                                     I,

                                                                     II
                                                                      I
                                                                          \
                                                  -




                                                                              \
                                                                              "

                                                                              ...._




 ~
                                                                              .~~                       r~

 Figure 4.1: Proposed subject site and location of facility (Source:http://qspatiaLinformation.qld.gov.auIlQAtlas/)


The site is located approximately 1 km north west of the Soreen Point township, and 9.5
km north of Cooroibah. The subject site borders rural residential allotments to the south,
Lake Flat Rd to the north and east, and large agricultural properties to the west which are
predominantly used for pine tree plantations and conservation land. The subject site is
currently used for farming purposes, predominantly forestry and logging. The site contains
an ancillary shed in the middle of the lot and an energex electricity network which runs

from north to south through the middle of the site. The subject site is heavily vegetated
which will provide for screening benefits. There are three existing residential dwellings




NBN-4NBZ-4POM-5135       -
                             Boreen Point                                                               Page 14

Page 17

within 500 m of the proposed facility, located to the south of the subject property. Figure
4.2 illustrates the site location and characteristics.




                   Figure 4.2   Site Location and Characteristics (Source:GooOgle Earth)
                                -




The location of the    proposed f<;lcility comprises an 8 m x 10m le<;lse area (NBN
compound) situated adjacent to the southern property boundary. The NBN compound will
be setback approximately 6 m from the eastern lot boundary, approximately 1.1 km from
the western lot boundary and approximately 1.1 km from the northern front ge to Lake Flat
Road. The proposed facility will be appropriately setback more 200 m from any
environmentally sensitive areas (e.g. Lake Cootharaba and Remnant Vegetation) and will
not require removal of any vegetation.


Access to the property is currently provided via Lake Flat Road via an existing 1.75 km
internal access track. The location of the existing access way can be seen on the attached
drawings within Appendix 3. It is proposed to utilise this existing access way to access
the proposed facility during construction and operation.


Figure 4.3 and 4.4 shows the proposed location of the facility on the subject site.




NBN-4NBZ-4POM-5135    -   Boreen Point                                                     Page 15

Page 18

                                            ~

                                                             ~~




                      ;’""’
                                 ’L~
                                                     ’,..,
                                                             ...


                                                             (
                                                                    [,.
                                                                    ’;i}
                                                                   ~ (   ,




                                                                             "-’~~:~       ’-::~,._"~:K
                                                                                                               ~

                                                                                                                 ,
                                                                                                                     "
                                                                                                                      ,
                                                ~
                ,_rJ                            "                                                                    ’L"
                                                                                       p
                ~~"
                      ~_.
                              ~.~.,.’-’’’l....,~~.
                                                                                                           .
                                                                                                              ’" ~’
                                                                                                          ’~,., ..~.’
                                                                                                           T    -
                                                                                                                           "
                                                                                                           .

                                                                                                               ’,.         .-




                                                                                                                           ~ .~




                 Figure 4.4            -
                                           Proposed location of the facility (arrowed)looking east




NBN-4NBZ-4POM-5135   -
                         Boreen Point                                                                           Page 16


[OCR of page images]
 

Figure 4.4 — Proposed location of the facility (arrowed) looking east

NBN-4NBZ-4POM-5135 — Boreen Point Page 16

Page 19

                                                   ,   ....




                                                              ...




4.2    Site Surrounds..
The site surrounds     are     characterised   by large farming properties, heavily vegetated
hinterland   areas   and  large    rural-residential allotments. The closest dwelling located
outside of the    property boundary lies approximately 240 m to the sou.th west of the
proposed facility. Two other residential dwellings are located within a 500 m radius of the
facility, and both of these are also south-west of the subject site.

Nearby villages and townships in.the wider locality include Kin Kin (west), Cootharaba
(south west) and Cooroibah (south). The wider locality also contains areas of
environmental and heritage significance, including but not limited to:
   .   Lake Cootharaba.located east
   .   Cooloothin Conservation Park, Noosa River and Lake Cooroiba located south
   .   Lake Cooloola, Lake Como and Great Sandy National Park located north


Figure 4.4 below provides an          aerial view of the            subject site   in the context of the

surrounding area.




NBN-4NBZ-4POM-5135    -
                           Boreen Point                                                        Page 17
                                                                                                           I

Page 20

5.0             THE PROPOSAL
5.1      Facility and Equipment Details

5.1.1    Lease Agreement

NBN Co Limited will enter into two (2)x ten year consecutive leases with the land owner.


In accordance with section 10 of the Sustainable Planning Regulation 2009, the definition
of a Reconfiguration of a Lot includes:
         (d) dividing land into parts by agreement rendering different parts of a lot
         immediately available for separate disposition or separate occupation, other than
         by an agreement that is-
         (i) a lease for a term, including renewal options, not exceeding 10 years

The proposed lease term will not require a Reconfiguration of a Lot application to be
lodged with Council as the terms of the lease will not exceed ten years.

5.1.2    Equipment to be Installed
Approval is sought for the use and development of a Telecommunication Facility,
comprising a 30 m monopole and two (2)x outdoor cabinets (one proposed and one future
with total base area less than 7.5 m2). The outdoor cabinets will be constructed on
elevated steel grillage located at the base of the facility within a secure compound which
measures approximately 80 m2 in area or 10 m x 8 m.



The proposed monopole will feature a circular headframe accommodating two (2)x panel
antennas (1.18m long) mounted at a centreline elevation of 30 m and two (2)x remote
radio units (0.5m long) positioned below the antennas. One (1) parabolic dish antenna
(0.3m diameter) will also be installed at approximately 28 m on the monopole. Please refer
to Appendix 3 Proposal Plans for further details.
                -




5.1.3    Access and Parking Details

Access to the property is currently provided via the existing   crossover on   the northern
property boundary and via Lake Flat Road. The location of the access track can be seen
on    the attacheddrawings within Appendix 3 and in Figures 5.1 and 5.2. NBN Co
proposes to utilise the existing access track to the proposed facility (approximately 1.75
km long) during construction and operation. The existing access track may need minor
upgrades to meet all weather access requirements.

The facility and all ancillary components will be constructed over the one title (Lot 2 on
RP126723). A copy of the title for the subject site is provided as Appendix 2. Plans
indicating the details of the proposal form part of the documentation of this application.
The proposed development plans are provided as Appendix 3.




NBN-4NBZ-4POM-5135   -   Boreen Point                                             Page 18

Page 21

      Figure 5.2 ’Existing access track (arrowed)and ancillary shed IO.oking north towards Lake Flat Road
                -




NBN-4NBZ-4POM-5135    -   Boreen Point                                                             Page 19

Page 22

The site access is considered to be appropriate given the NBN Co facility will not be a
significant generator of traffic. Once operational, the facility will require maintenance visits
approximately once per year, but will remain unattended at all other times. As the facility
generates minimal trips per year, it is considered that traffic interference will be negligible.

During the construction phase, a truck will be used to deliver the equipment and a crane
will be used to lift the equipment into place. Any traffic impacts associated with
construction will be of a short-term duration and are not anticipated to adversely impact on
the surrounding road network. In the unlikely event that road closure will be required; NBN
Co will apply to the relevant authorities for permission.


5.1.4 Installation Details


A total construction period of approximately ten weeks (including Civil works and network
integration    and    equipment commissioning) is anticipated.                Construction    activities will
involve four basic stages:

       .   Stage 1 (Week 1)     -
                                    Site preparation works, including field testing, excavation and
           construction of foundations;

       .
           Stage 2 (Weeks2,3 and 4)           -
                                                   Construction of the tower;

       .
           Stage 3 (Weeks5 and 6)         -
                                              Construction of the outdoor cabinets and fences;

       .
           Stage 4 (Weeks 7     -

                                    10)-
                                           Installation of antennas and radio equipment, as well as
           equipment testing.

Once   operational, the facility will function on a continuously unstaffed basis and will
typically only require maintenance works once a year, for approximately one day per year.

5.1.5      Utility Service Details
Power for the proposed facility will be sourced from an existing network on Lake Flat Road
approximately 1.4 kilometres away. The conditions of supply are subject to further
investigation. Please refer to Drawing C2 of the Proposal Plans attached as Appendix 3
for further details.


5.1.6      Construction and Noise

Noise and vibration emissions associated with the proposed facility will be limited to the
construction phase outlined above. Noise generated during the construction phase will be
of short duration       and    will   be      in   accordance    with   the   standards outlined     in   the
Environmental Protection  Regulation 1998 and Environmental Protection (Noise) Policy
1997. Construction works will only occur between the hours of 7.00am and 6.00pm.


There will be        some   low level noise from the            ongoing operation    of air    conditioning
equipment associated with the equipment shelter, once installed. Noise emanating from
the air conditioning  equipment is at a comparable level to a domestic air conditioning
installation, and will generally accord with the background noise levels prescribed by
Australian Standard AS 1055.




NBN-4NBZ-4POM-5135      -
                            Boreen Point                                                          Page 20

Page 23

5.2    Site Selection:’::
The proposal site was selected as it met the NBN Co coverage objectives. As discussed
in Section 3, a number of candidates were examined within the search area which
resulted in the chosen candidate at 153 Lake Flat Road, Boreen Point. Furthermore, the
reasons for   selecting this site are as follows:
   .   The site is appropriately located within a rural area which is characterised by large
       farming properties, heavily vegetated hinterland areas and large rural-residential
       allotments;

   .   The proposed location provides an adequate separation distance from community
       sensitive land      uses   and is setback more than 240 m from the closest and    only
       three (3)residential dwellings within        500 m radius;

   .   The   facility has been appropriately located on a highly modified subject site
       predominantly used for forestry and logging purposes and containing similar
       electrical infrastructure such as the energex electricity network which runs from
       north to south through the property;

   .   The proposed facility is located a sufficient buffer distance from environmentally
       sensitive locations (approximately 200 m from Lake Cootharaba) and no vegetation
       removal will be required;

   .   The location     provides line of sight to other planned     sites in the NBN wireless
       network specifically -Soreen Point North; and

   .   The Telecommunication Facility on this site has been appropriately located on the
       periphery of the township whilst still being able to meet coverage objectives for the
       area and minimising visual impact given the presence of mature vegetation

       surrounding the site.




NBN-4NBZ-4POM-5135     -   Boreen Point                                             Page 21

Page 24

6.0            CURRENT PLANNING
               CONTROLS
6.1      Commonwealth            Legislation    -
                                                    The Telecommunications Act
1997

The Telecommunications Act 1997 has been operative since 1 July 1997. This legislation
establishes the criteria for ’low impact’ telecommunication facilities.   If a proposed facility
satisfies the requirements of a ’low impact’ facility, the development is exempt from the
planning approval process.

Further clarification of the term ’low impact’ is provided in the Telecommunications Act
1997 and the Telecommunications (Low Impact Facilities) Determination 1997, which was
gazetted subsequent to        the Act.   The   Telecommunications   (Low Impact Facilities)
Determination 1997 establishes certain facilities, which cannot be considered low impact
facilities.


The proposed facility is not considered to be low impact under the definitions contained in
the Commonwealth legislation as it involves the construction of a new tower. It is therefore
subject to the Sustainable Planning Act 2009 and requires development approval under
the provisions of the Noosa Plan 2009.




6.2      State Legislation        -
                                      Sustainable Planning Act 2009
The Sustainable Planning Act 2009 (the SPA) is the legislation that governs planning in
Queensland. The SPA seeks to achieve ecological sustainable outcomes for development
within Queensland by coordinating and integrating planning mechanisms at local, regional
and state levels, managing the effects of development on the environment, and managing
the process by which development takes place.


Where a Telecommunication Facility is not considered a low-impact facility, it is subject to
the provisions of the relevant local government planning provisions.


Therefore, because the proposed facility is not ’low-impact’ as the proposal involves the
installation of a new Telecommunication Facility; the provisions of the Planning Scheme
apply. This development report has been compiled to accompany an Impact Assessable
application to Sunshine Coast Regional Council under the provisions of the Noosa Plan
2009. The provisions of the Planning Scheme are assessed in Section 7.0 below.




6.3      State Legislation        -
                                    Vegetation Management Act 1999
The Vegetation Management Act 1999 (VMA)is the legislation that regulates vegetation
management and the clearing of native vegetation in Queensland. The VMA managed by
the  Department of Natural Resources and Mines (DNRM), controls the rules and
regulations that guide what clearing can be done, and how it must be done to meet the
requirements of the law.

Clearing for some activities are exempt. These include most routine activities like fence
lines, yards, firebreaks and burning off. The clearing of native vegetation (identified on
Regional Ecosystem and Remnant Maps or Regrowth Vegetation Maps and PMAVs)for a
Telecommunication Facility however is not considered an exempt activity.




NBN-4NBZ-4POM-5135   -
                         Boreen Point                                                 Page 22

Page 25

     Therefore clearing of remnant vegetation on a regional ecosystem or remnant map, for a
     Telecommunication Facility can only be carried out if a permit is ’granted by DNRM, who
     assesses the  application against the regional vegetation management codes. No permit is
     required to clear regulated regrowth; however the department must be notified of the
     intended clearing and compliance with the regrowth vegetation code.


     6.3.1         Regrowth Vegetation

     Under the VMA the subject site is mapped as containing a small area of High Value
     Regrowth Vegetation that is classified as containing ’Of Concern regional Ecosystems’
     and two ’Regrowth Watercourses (Stream Order 1)’ (refer to Figure 6.1 below and
     Appendix 5 Environmental Searches). In accordance with the Regrowth Vegetation
                               -




     Code a Regrowth Watercourse classified as Stream Order 1 requires a minimum stream
     protection distance of 10 metres. A portion of the proposed compound (8 x 10m) is
     located within the mapped Regrowth vegetation however, the proposed development will
     not require a permit or notification to the DNRM as it is located in a cleared area, and the
     proposal does not require removal of any vegetation. The proposed development is also
     setback approximately 300 m from the closest regrowth watercourse.


                     "




               ~                                                         C?
                         ~
        I                 \        -’,



       r




..   o;-~_



                          -,




                          ~f
                     /’        $




      Legend:
       IiQW Vegetation ManagementACI E.~:eJ>tlslllejJl’OWIh
               Habitat with example l.~d IIumbllf
                                                                                       ,
       ~ Great Banier Reel Wet..nd Proteclion Area
       c::::J Hi h value regrowth vegetation containillQ
              E’n1Iangered regiorl81 ecosystems                                          ;.’\.
       c::::J High 1IIlue l1!gI’owth vegetlltliln cont’lllnl’ljj
              orCone"," region’" eCOfVGtems
       c::::J High vahle’ regrowth vegetation tNt it.
               l.e8st Concern reQ      al ll.cosY5lelll
       _ Rempen!VejJetation
         IRefer to the Vegetation Mlmagement Acllf!Olonal
               ecosystem anRamnant Map ,Iso ovd.blo fromthe
               Oepsrtmenl 01 Enviroomelll .nd ReaOurc.:M&nllllement
               website tor fwtheJ information on these areasl
       [     ’HorH’emnant




     NBN-4NBZ-4POM-5135                         -
                                                    Boreen Point                       Page 23

Page 26

6.3.2 Remnant Vegetation

Under the VMA, the    subject site is mapped as predominantly ’Plantation Forest’ and
containing small portions of Remnant Vegetation that is an ’of concern’ regional
ecosystem and Remnant Vegetation that is a ’least concern’ regional ecosystem (refer to
Figure 6.2 below). Parts of this vegetation are also identified as being Essential Habitat.
The proposed development will not require a permit or notification to the DNRM as, it is
located in a cleared area, approximately 400 m from the assessable vegetation, and the
proposal does not require removal of any vegetation.


                                                                    /’"-

                                                                            ./
                                                                           /’




   _           Remnant vegetation contailing endangered
               regional ecosystems
   _           Remnant vegetation conta.,lng of concern
               regional ecosystems
   ..Remnant vegetation that is a least concern
               regional ecosystem
   ~ Plantation Forest
   ~ Dam or Reservoir
   c:::::::J Remnant Vegetation
   c:::::::J   PMAV Category X area

   c:::::::J Vegetation Management Act Essential Habitat
                 r further Information on VMA Essential Habhat,

               please see the attached VMA Essential Habitat map.




6.4            State Planning Policy Framework

A State Planning                    Policy (SPP)is a statutory instrument developed by the Queensland
State Government under the Sustainable Planning Act 2009 (or the former Integrated
Planning Act 1997) on matters of State interest. SPPs apply when development is
assessed, land is designated for community infrastructure, and when proposed new
planning schemes are made or amended under the SPA. The state planning policies
(SPP)below are current. State planning policies developed under the Integrated Planning
Act 1997 remain current under the Sustainable Planning Act 2009. There are currently




NBN-4NBZ-4POM-5135                     -   Boreen Point                                     Page 24

Page 27

twelve   (12) active SPPs, one (1) of which applies to the proposed development, as
demonstrated in Table 6.1 below.




SPP 1/92   -

               Development and the         Not Applicable
Conservation of Agricultural Land          This SPP lapsed on the 18 December 2012 and has been
                                           replaced by SPP 1/12 Protection of Queensland’s Strategic
                                           Cropping Land (Referto SPP 1/12 below for an assessment).

                                           Notwithstanding this, the site is identified within the Noosa
                                           Plan    2009  -
                                                             Natural Resources Overlay .as containing
                                           Agricultural Land Conservation Areas (ALCA). However the
                                           proposed fa lity is located approximately 600m to’ the south
                                           east of the mapped ALCA and will not impact on the current
                                           or future use of the land as agricultural land. Furthermore, the

                                           establishment of the proposed facility will occupy a relatively
                                           small lease area (80 m2) of the total 106 ha site area. The
                                           facility is also located on the periphery of the site and on
                                           cleared land to avoid interference. Additionally the proposed
                                           use for a telecommunication facility will        not affect the
                                           agricultural practices on site as the proposal is not for a
                                           habitable or sensitive land use, and if the facility is no longer
                                           operational the site can be easily decommissioned and the
                                           land rehabilitated.
SPP 1/02   -
             Development in the            Not Applicable
Vicinity of Certain Airports and           The subject site is located within an area defined in Annex 1.
Aviation Facilities                        of’the SPP. However, the site is not identified within the
                                           Noosa    Plan     2009     as    being   located      within   the   Joint
                                           Obstruction     Clearance       Surfaces of the Sunshine             Coast
                                           airport. The proposal will not have an impact on the safe
                                                   on of the           facil
SPP 2/02  Planning and Managing
           -




Development Involving Acid Sulfate         The subject site is located within        a   local   government area
Soils                                      listed in Annex 1 of the SPP. The site is identified within the
                                           Noosa Plan 2009       -
                                                                     Natural Hazard Bushfire & Acid Sulphate
                                           Soils Overlay as containing both High (0 5 f\1 AHD)and Low
                                                                                           -




                                           (5 20m AHD) Potential Acid Sulfate Soils. The facility has
                                              -




                                           been sit d within the High Potential Acid Sulfate Soils area.
                                           However, the works do not involve excavating more than 100
                                           m3 of soil or :tilling more than 500 m3 of material as specified
                                           in section 2.3 of the SP




NBN-4NBZ-4POM-5135      -
                            Boreen Point                                                                  Page 25

Page 28

                          ...                                                                   ,,-,                      ’"-~
                                                                                                                                 ~   "

                  ,   ,
                  \   I
                                                                                                                                     \l
                                                                                                                                           ~
                                                                                       ~   .                              ,.<>
                                                                                                                                 ~
                                                                                                                                     ,,’


SPP 1/03   -

               Mitigating the Impacts              Applicable
of Flood, Bushfire and Landslide                   The subject site is in a local government area listed in Annex
                                                   2 of the SPP. The subject site is also identified on the Natural
                                                   Hazard: Landslide & Flooding Overlay as containing a ’Flood
                                                   Hazard Area’ and containing small portions of land ’Subject
                                                   to minimum floor          height.       In addition the Natural Hazard:
                                                   Bushfire & Acid Sulfate Soils Overlay identifies the subject
                                                   site as containing ’Medium Bushfire Hazard Areas’.


                                                   However, the use will not increase the risk or impact of a
                                                   natural hazard since it is already cleared of vegetation, where
                                                   the foundations and earthworks      are to follow engineering

                                                   design standards and will not use equipment that significantly
                                                   increases the risk of fire. Although the land is susceptible to
                                                   some low levels of flooding and drainage problems, the

                                                   proposed Telecommunication Facility, is not for a habitable
                                                   use and has been sited and designed with raised equipment

                                                   cabinets on elevated grillage to minimise the hazards
                                                   associated with flooding. The proposed development is not
                                                   listed in A 1.1 Annex 1 and will not result in an increased risk
                                                   of flood, bushfire        or    landslide for the      area   and therefore
                                                   complies with the SPP.
SPP 1/07   -

               Housing and                         Not Applicable
Residential Development                            This   SPP has no effect in         assessing development
                                                   applications and the proposed use is not for housing and
                                                   residential development.
SPP 2/07   -
               Protection of Extractive            Not Applicable
Resources                                          The site is not located in a Key Resource Area or identified
                                                   within the Noosa Plan 2009     Natural Resources Overlay as
                                                                                           -




                                                   containing Key  Resource  Areas.
SPP 2/10   -
               South East                          Not Applicable
Queensland Koala Conservation                      The subject site is located within a local government area
                                                   listed within Section 2.4 of the SPP and is covered by the
                                                   South East Queensland Koala Protection Area Koala Habitat
                                                   Values         mapping    as     containing    ’low    to     medium   value
                                                   bushland habitat’. However, the SPP does not apply to
                                                   development for a MCU which does not require the removal
                                                   of vegetation, and additionally, the subject lot is not located
                                                   within     a   Koala Assessable         Development Area of the SEQ
                                                   Koala Conservation State                Planning Regulatory Provisions
                                                   (SPRP).
SPP 3/10   -
               Acceleration of                     Not Applicable
Compliance Assessment                              The proposal does not seek compliance assessment for
                                                   Reconfiguration of Lot or Operational Works.
SPP 4/10   -


               Healthy Waterways                   Not Applicable
                                                   The location of the proposed facility is situated on land that is
                                                   in proximity to Lake Cootharaba, however the proposed
                                                   facility will be located approximately 200 m west of the edge
                                                   of the lake and is not likely to have any notable impact on the
                                                   water body given the facility will utilise the existing access
                                                   tracks and works do not involve excavating more than 100 m3
                                                   of soil.

SPP 5/10   -

               Air, Noise and                      Not Applicable
Hazardous Materials                                The subject site is not located within             a   Management Area
                                                   listed under Schedule 5 of the SPP.
SPP 3/11 Coastal Protection                        Not Applicable
                                                   This     SPP     has     been
                                                                            suspended by the Draft Coastal
                                                   Protection State   Planning Regulatory Provision (Refer to
                                                   section 6.5 below).




NBN-4NBZ-4POM-5135              -
                                    Boreen Point                                                                     Page 26

Page 29

SPP 4/11 Protecting wetlands of            NotApp
high ecological significance in            The proposed site is not located within the Great Barrier Reef
Great Barrier Reef catchments              catchment area.
SPP 1/12 Protection of                     Not Applicable
Queensland’s Strategic Cropping            The subject site is located in an area identified as Potential
Land                                       Strategic Cropping Land, however the proposed development
                                           footprint will not be more than 750 m2, and there are no
                                           reconfigurations of a lot proposed. Therefore the SPP does
                                           not                           the dev         ent    ication.
Temporary SPP 2/12 Planning for            Not
Prosperity                                 The  proposed site is currently used for farming purposes.
                                           Notwithstanding this the current and future capabilities of the
                                           site will   not    be      affected   with   the establishment of the
                                           proposed facility as the facility will occupy a relatively small
                                           lease area (80 m2) of the total 106 ha of land; and has been
                                           intentionally located adjacent to the south eastern property
                                           boundary to minimise interference with farming activities. In
                                           addition the proposed facility will provide the ne ssary
                                           infrastructure and fixed wireless services to improve the
                                           economic growth and long term sustainability of the Boreen
                                           Point area. This SPP is otherwise not applicable in assessing
                                           the devel                    ication.




6.5        Draft      Coastal        Protection                   State          Planning        Regulatory
Provision
The Draft Coastal Protection State Planning Regulatory Provision (the draft SPRP) was
released (October 2012) to simplify and streamline planning, assessment and                                approval
processes for development in Queensland’s coastal zone.


The draft SPRP ensures the government manages development in Queensland’s coastal
zone      and grows .the economy, while          balancing environmental and social resources for
present and future generations.

It will   provide certainty for coastal planning while the state government reviews and
undertakes consultation     on the Queensland Coastal Plan including the State Planning

Policy 3/11: Coastal Protection.

The draft SPRP does not apply in              assessing this development application as it is not
identified as any of the prescribed types of development applications set out under Part 2,
Section 2.1 (1), namely;
    .      for   impact assessable development               in   a   coastal      management district by       an

           assessment manager
    .      considered   by the chief executive administering the Coastal Protection and
           Management Act 1995 as assessment manager in accordance with the
           Sustainable Planning R,egulation 2009
    .      for development in a coastal management district by an agency with jurisdiction
           under the Coastal Protection and Management Act 1995
    .      for a master plan application.




6.6        Regional Plan
The proposed development falls within the south-east Queensland region which is covered
under the South East Queensland                  Regional Plan           2009-2031       (Regional Plan). The



NBN-4NBZ-4POM-5135      -   Boreen Point                                                               Page 27

Page 30

Regional Plan covers Noosa in the north, the New South Wales-Queensland border in the
south, and Toowoomba in the west.

The  Regional Plan allocates all land into one of three land use categories; Regional
Landscape and Rural Production Area, Urban Footprint and Rural Living Area. These
categories provide the spatial context for the regulatory provisions of the Regional Plan.
The subject site falls within the Regional Landscape and Rural Production Area under the
Regional Plan and is not within the identified Urban Footprint boundaries.

The   Regional Landscape and Rural Production Area identifies land with regional
landscape, rural production or other non-urban values. It protects this land from
inappropriate development, particularly urban or rural residential development.

The proposed development is identified as an urban activity under the Regional Plan and
is generally consistent with the development outcomes for urban activities outside the
Urban   Footprint. Division 2, Section 2.1, Table 2E of the SEQRP SPRP identifies the
referral assessment criteria for Material Change of Use development outside the Urban
Footprint where:

1. A material change of use for an industrial and commercial purpose having a GFA of no
more than    750 m2 on the premises where       -




(a)any incidental retail activity on the premises is no more than 50 m2; and
(b)any associated outdoor area on the premises is no more than 1500 m2.

The proposed facility is compliant with the provisions of the SPRP because the site:
.    has a total footprint less than 750 m2
.    will not trigger any incidental retail activity; and
.    does not contain any outdoor areas on the premises.


In addition, the facility will provide a service for community benefit without compromising
the productive capacity of the site by supporting economy and employment provisions of
the Sunshine Coast area identified by the Regional Plan as follows:
         ’The small rural hinterland centres and surrounding rural production       areas   will
         continue to play an important role in diversifying the Sunshine Coast’s economy
         and lifestyle. They will also support the long-term sustainability of rural areas. The
         encouragement of home-based businesses and rural enterprises with access to
         high-speed broadband telecommunications provides additional economic and
                                                                         ’

         employment growth opportunities outside the Urban Footprint.


6.7      Referral Agencies
There are no referral agencies applicable to this development.




6.8      Local Government Regulatory Framework

6.8.1    Planning Scheme use definition
The proposed     development is defined within the Noosa Plan 2009 (the Noosa Plan) as
follows:
     .
         Primary Use: ’Infrastructure Uses’
     .   Use Class: ’Service and utility’
     .   Use: ’Type 3 Tower’




NBN-4NBZ-4POM-5135     -
                           Boreen Point                                              Page 28

Page 31

Type 3 Tower is defined as: ’The use of/premises for a tower, antennas or mast and
supporting shelter or equipment, in the provision or supply of electricity or
telecommunications. The use excludes facilities deemed to be "Low Impact Facilities"
under the Telecommunication (Low Impact Facility) Determination Act 1997, and excludes
power poles. The use includes a telecommunication tower, wind turbine, high voltage
transmission lines (110kv or greater).’


6.8.2    Zoning
This site is within the ’Boreen Point, Kin Kin & Cootharaba          -
                                                                         Rural Zone’ of the Noosa
Plan 2009. The propose          Material Change of Use for a ’Type 3 Tower’ will be Impact
Assessable (Inconsistent) within this zone according to Table 4.6 of the Noosa Plan
2009. Figure 6.3 below indicates the zoning of the site.




     Legend:
     DDetached Hous~ng
     DVillage Mbc
     DCommunity Services
     .lndu$tfY
 .
     .Rural Settlement
                           .



     .Rural
     oOp n Space Recreation
     .Open Space Conservation



6.8.3     Overlays
The subject site is identified on four (4)applicable overlays as outlined under the Noosa
                                                                                    .




Plan 2009. The applicable overlays are as follows:
       .
           Biodiversity Overlay   -
                                      the subject site is identified as containing’’Environmental
           Protection Areas’ and ’Watercourses and Drainage Lines’ (Refert         figure 6.4)
       .   Natural Hazard: Landslide & Flooding Overlay       -
                                                                  the subject site is identified as
           containing a ’Flood Hazard Area’ and also contains portions of land ’Subject to
           minimum floor height’. (Referto figure 6.5)




NBN-4NBZ-4POM-5135     -
                           Boreen Point                                                  Page 29

Page 32

       .       Natural Hazard: Bushfire & Acid                           Sulfate Soils    Overlay    -
                                                                                                         the   subject site is
    "’I-

               identified as containing both High and Low Potential Acid Sulfate Areas, as well as
       ~
               ’Medium Bushfire Hazard Areas’. (Refer to figure 6.6)
       .       Natural Resources Overlay        the subject site is identified
                                                                 -
                                                                                                          as   containing   an

               ’Agricultural Land Conservation Area’. (Referto figure 6.7)




                                         Watercourses and
                                         Drainage Lines
 [:~j:;]       Ripa an Buffer Area

 .
 Environmental Protection .Area

 III Environmental Enhancement Area
 ~~.~~J KoaIa H abitatArea
 ’:’;.;A;.:!          .




                                         6.4: Biodiversity Overlay   -
                                                                         Map OM1.1 (Source: Noosa Plan 2009)




                             ’.’;"
                                                            .’




NBN-4NBZ-4POM-5135                   -
                                         Boreen Point                                                               Page 30

Page 33

                                                                                                                    ,-




 Legend:
     Extent,of
  ...
     Flood Map,pJng

 _ Flood Hl.nrct ArfIa
                           t&
rI;~;~l Al:eIl,Sllbject
  .........~
               :

        MJo Floor IHeight
               ,




                                      Landslide & Flooding Overlay   -
                                                                         Map OM1.3 (Source:Noosa’Plan 2~09)




 Legend:
  .
  High Bushflre Hazard Area
  .
  Mediwn Bushfire Hazard Area
 ~ High Potential Acld’SI,Ilfate Area O.5m AHD
 ~ Low Potential Acid Sulfate Area 5-20m AHD

     Figure 6.6: Natural          Bushfire & Acid Sulfate Soils Overlay   -

                                                                              Map OM1.4:(Source: Noosa Plan 2009)




NBN-4NBZ-4POM-5135         -
                               Boreen Point                                                               Page 31

Page 34

                                                         ./

                                                         (
                                                     I
                                                     r
                                                 I
                                                 I
                                             I

                                         I




     legend:
            ,  Coastal Protection
      L.-      Area
            Agricultural land
      II    Conservation Area
            (AlCA)




NBN-4NBZ-4POM-5135    -
                          Boreen Point                        Page 32

Page 35

7.0                PLANNING CONSIDERATIONS
This section of the report assesses the proposal against the relevant provisions of the
Planning Scheme which include the relevant codes.

7.1 Desired Environmental Outcomes

As the proposed       use   is identified as Impact Assessable and     an   inconsistent land   use

within the Rural Zone, assessment against the DEO~s of the Noosa Plan 2009 is required.


There are twelve (12)categories of DEOs within the Noosa Plan 2009, five (5)of which
are    considered to be relevant to this proposal. Demonstration of compliance with the
relevant DEO’s is contained below.




3.1.3 (a)Agric /tura/ Uses                          Complies.
Agricultural industry is maintained by-             The    subject site is currently used for
      (i) conserving land for economically          farming purposes, predominately forestry
            viable and environmentally              and     logging. However, the proposed
            sustainable agricultural purposes;      development will not compromise the
      (H) preventing the fragmentation of           capabilities or practices of the site or
            good quality agricultural land;         surrounding land uses as the establishment
      (iii) facilitating the growth of non-         of the proposed facility will occupy a
            traditional, though high value, crops   relatively small lease area (80m2) of the
            which have minimal impact on the        total 106ha of land and is also located on
            natural environment or adjacent         the periphery of the site on cleared land to
          crops;                                    avoid interference.
      (iv)facilitating the growth of non-
          traditional animal husbandry              The introduction of fixed wireless coverage
          practices such as aquaculture where       will enhance the     community’s potential in
          it does not alienate good quality         regard to economic wellbeing and social
          agricultural land or have a               growth. Fixed wireless in Soreen Point
          detrimental impact upon the               which is identified as a ’Village Centre’ on
          environment;                              the Noosa Plan Strategy Map will aid
      (v) protecting agricultural pursuits from     economic       and     social   growth     and
           incompatible uses;                       diversification within the agricultural sectors
      (vi)facilitating the growth of farm           of the shire, and create an opportunity for
           forestry practices;                      supplementary incomes and business
      (vH)value adding to farm produce to           pursuits.
           enhance economic viability; and
      (viii)       adopting water and energy        Therefore the    proposal is consistent with
           efficient practices.                     DEO 3.1.3 (a).


3.1.3 (c)Community Uses and facilities          Complies.
An adequate range of community services             The
                                                     proposed development is considered
and facilities supporting the physical, safety, an    essential   community     service   for
                                                                                                      ,
                                                                                                          ,

artistic and social needs of the community residents within the Soreen Point locality.
are equitably distributed having regard to

the-                                            The proposed facility will provide improved
    (i) Location and density of housing         network access to remote locations within
    (H)  Location of transport infrastructure   the region to help service current and future
    (Hi) Location of business  centres          residents needs by providing access to
         Social economic and                        efficient and reliable broadband services.




NBN-4NBZ-4POM-5135     -   Boreen Point                                                 Page 33

Page 36

                  patterns of Noosa; and                   The use has been appropriately located on
           (v) Functions of towns and villages             the   periphery of the Soreen Point ’Village
                                                           Centre’   as    identified   on   the Noosa Plan
                                                           Strategy Map          andadjacent to other
                                                           community services, including significant
                                                           transport and electricity infrastructure and is
                                                           well removed from community sensitive
                                                           locations.


                                                           For     these     reasons     the    proposal       is
                                                           consistent with OEO 3.1.3 (c).
        3.1.3 (d)Heritage                                  Complies.
        The indigenous and non-indigenous history,         The proposed      development will be located
,
    i

        culture and traditions    are   reflected in the   on    freehold land for which there          are    no
        built and natural heritage of Noosa and are        heritage items identified.
        preserved for future generations.
                                                           Therefore the      proposal is consistent with
                                                           OEO 3.1.3Jdl
        3.1.3 (g) Open space, environment and              Complies.
        conservation functions                             The subject site is not identified as being
        Networks    of   open     space    and   natural   located in an open space corridor and the
        habitat, vegetated lands, and riparian zones       specific location of the facility is not within
        along watercourses-                                existing native vegetation as outlined on
            (i) Are    sensitively    managed     and      Map 4 Open Space Networks. The proposal
                    protected   from    any   adverse      is appropriately located within a low density
                    impacts, including cumulative          rural area used for agricultural purposes
                    impacts,       resulting     from      and will not require vegetation removal. In
                    development;                           addition the proposed facility has been
            (ii) Set Noosa apart from other coastal        setback from environmentally          sensitive
                    parts of south-east Queensland         areas (e.g. 400m      away    from    identified
                    by strongly protecting the natural     Remnant Vegetation and 200m from Lake
                   environment                             Cootharaba) to avoid areas of significant
           (iii) Support the economy through the           natural resources and minimise potential
                    tourism industry                       environmental impacts associated with the
           (iv) Define the boundaries to or of each        development.
                   of the distinct localities of Noosa;
           (v) Protect   water   quality, landscape Additionally, the subject site is heavily
                  stability and biodiversity          vegetated by a combination of the pine
           (vi)Provide     passive,     nature-based plantation and existing mature vegetation
                  recreational    and     educational which borders the subject site and road
                  opportunities;                      network. Onsite and nearby vegetation will
           (vii)Enhance  visual amenity; and          provide significant screening benefits and
           (viii) Provide       linkages      beyond  the facility has been designed as a slim line
                  Noosa’s boundaries.                 monopole, which can be colour matched to
                                                      the surrounding vegetation.


                                                           The introduction of fixed wireless coverage
                                                           will enhance thecommunity’s potential in
                                                           regard to economic wellbeing and social
                                                           growth of the wider Noosa area. Fixed
                                                           wireless in the Soreen Point area will aid
                                                           economic        and     social      growth         and
                                                           diversification within the tourism sectors of
                                                           the shire.




        NBN-4NBZ-4POM-5135   -
                                 Boreen Point                                                      Page 34

Page 37

                                                             The   proposal         does       not     involve     the
                                                             implementation       of.   .
                                                                                            passive   nature-based
                                                             recreational and educational opportunities,
                                                             however not withstanding this the proposed
                                                             facility is set back on a private property and
                                                             will   not adversely      impact or remove
                                                             opportunities   for recreational or educational

                                                             facilities to occur.


                                                             There are no other significant conservation
                                                  present within the subject site.
                                                             areas

                                                             For
                                                          reasons     the
                                                                     these  proposal is
                                          consistent with DEO    3.1.3 (g).
"3.1.3 (I) Infrastructure and services    Complies.
 (i) The efficient provision and use of The proposed use for a telecommunications
 services such as water, sewerage, power, facility is identified as an infrastructure
 telecommunications and waste disposal, service as per DEO 3.1.3 (I).
caters   for the     needs     of residents           and
visitors, relative   to    their location           within   The   locality    of Boreen        Point    has     been
Noosa                                                        identified for development of a new facility
(ii)   the   ongoing       viability     of   existing       to provide broadband services to residents,
infrastructure     uses      and       facilities     are    visitors and businesses within the area. The
protected    from    the     impacts        of      future   facility will serve as a key link in the NBN
development.                                                 network, shooting information to Boreen
                                                             Point North.
                                                                                                                           ,-


                                                             To mini mise       amenity      impacts, the       facility
                                                             has   been       appropriately      co-located       with
                                                             existing     infrastructural
                                                                                       uses        the     in
                                                             surrounding area including powerlines and
                                                             poles.

                                                             The   siting of this facility’ has been a
                                                             strategic and      comprehensive process
                                                             undertaken to provide an efficient and high
                                                             quality service to the community, whilst
                                                             mlnlmising    potential impacts on the
                                                             environment.


                                                             Existing infrastructure uses within the area
                                                             will not be  impacted by the development.
                                                             Instead the proposed facility will provide
                                                             telecommunications                services            and
                                                             infrastructure and thus           an.   opportunity for
                                                             other mobile       phone       carriers to collocate
                                                             which will increase the efficient provision of
                                                             telecommunications services in the Boreen
                                                             Point Area.


                                                             For     these     reasons,        the     proposal      is
                                                             considered to comply with the intent of OED
                                                             3.1.3 (I).




NBN-4NBZ-4POM-5135     -
                           Boreen Point                                                                   Page 35

Page 38

7.2 Applicable Codes

This section contains the applicable codes for the proposed development. The Noosa Plan
2009 sets out the Codes and those of which are applicable to this application are outlined
hereunder;
           .   Boreen Point, Kin Kin & Cootharaba Locality Code
           .   Infrastructure Uses Code
           .   Earthworks Code
           .   Landscaping Code
           .
               Driveways and Carparking Code
           .   Biodiversity Overlay the subject site is identified as containing ’Environmental
                                       -




               Protection Areas’ and ’Water courses and Drainage Lines’ (Refer to figure 6.4)
           .   Natural Hazard Overlay: Landslide & Flooding Overlay          the subject site is
                                                                             -




               identified as containing a ’Flood Hazard Area’ and also contains portions of
               land ’Subject to minimum floor height’ and the Bushfire & Acid Sulfate Soils
               Overlay    -
                           the subject site is identified as containing both High and Low
               Potential Acid     Sulfate Areas, as well    as   ’Medium Bushfire Hazard Areas’.
               (Refer to figure 6.5 and 6.6)
           .   Natural Resources       Overlay the subject site is identified as containing an
                                                 -




               ’Agricultural Land Conservation Area’. (Refer to figure 6.7)


7.2.1 Boreen Point, Kin Kin & Cootharaba Locality Code

A ’Tower’ in the Boreen          Point, Kin Kin & Cootharaba Locality is assessable against the
Boreen Point, Kin Kin & Cootharaba Locality Code. The Overall Outcomes for the Boreen
Point, Kin Kin & Cootharaba Locality which            are   relevant to the current   proposal are
addressed below.


a) New uses and works are located, designed and managed to-
   i. be compatible with other uses and works;
  ii. maintain the safety ofpeople and works;
 iii. avoid significant adverse impacts on the amenity enjoyed by users of other
      premises, including impacts on acoustic and visual qualities; and
 iv.  avoid significant adverse effects on the natural environment, including native
      habitat removal, fragmentation and attrition;


b) The remote setting, small scale village focus, agricultural and natural environmental
    values of the locality are maintained and enhanced;


c) The rural and bushland character and lifestyle enjoyed by residents and visitors is
   retained;

d) Rural lands are protected and made available for sustainable Agricultural Uses;

e) Agricultural Uses provide for appropriate value adding on site, where amenity impacts
        can be avoided;



f) The natural environmental and cultural heritage values of the locality are well conserved
and well managed, including-


  i.       Cooloola section of Great Sandy National Park, Cooloothin Conservation Park, Mill
           Point, Borg Park, the Kin Kin Junction Arboretum and Wahpunga School Park;
  ii.      the riparian zones of the Noosa River, Cooloothin Creek, Kin Kin Creek, its many
           tributaries and other watercourses;




NBN-4NBZ-4POM-5135        -
                              Boreen Point                                               Page 36

Page 39

 Hi.     Lake Cootharaba and its riparian zones;iv Woondum, Toolara and Ringtail State
         Forests;
 iv.     the Kin Kin Memorial School ofArts, Country Life Hotel, St Luke’s Church, Kin Kin
         Junction Uniting Church, Kin Kin State School, Kin Kin Masonic Lodge, Former Kin
         Kin Post Office, Kin Kin General Store, Former Kin Kin Junction State School
         (sportsground clubhouse), Former ES & A Bank and Residence, ’Bangunyah’
         Private Residence, and Former WD. Francis House amongst others;


g)Areas used or suitable for rural or extractive uses are protected from land uses which
would impact on the utilisation of the extract ve resources;


h) Residential development, including short stay visitor accommodation in the form of bed
and breakfast accommodatjon, is of a scale consistent with its natural and rural setting and
is focused on the rural villages of Kin Kin and Boreen Point;


i) Pomona Kin Kin Gympie Road, Sister Tree Creek Road, Cootharaba Road, Dr
            -         -




Pages Road, Junction Road, Kinmond Creek Road, Main Street, Lake Flat Road,
McKinnon Drive, Neusavale Road, Laguna Street and Louis Bazzo Drive, are protected as
part of th(3 major road network.

j) The function, safety and visual amenity of the major road network are protected and
enhanced;

k) Open space networks are protected and enhanced to provide recreational,
environmental and aesthetic amenity opportunities across the localy;


I) Kin Kin village and Boreen Point village are the urban focal points, supporting the only
urban settlement in the locality, and consolidated through the provision of an appropriate
level of service to residents of the locality;


t) For the Rural Zone-rural land is protected and appropriately managed such that the
scenic and environmental values, the distinct rural amenity and -agricultural productivity of
the locality are preserved and are not adversely impacted as a consequence of
development on or adjacent to that land;

Compliance
Development for a ’Tower’ is recognised as an Inconsistent land use within the Soreen
Point; Kin Kin & Cootharaba Locality Rural Zone. However, the proposed subject site is
                                         -




considered appropriate to accommodate the proposed facility whilst. minimising potential
visual and amenity impacts. In order to achieve this, a comprehensive site selection
process was undertaken prior to identifying a preferred site for the development of a new
facility. This process involved consideration to not only meeting the coverage objectives,
but also minimising visual and amenity impacts to the surrounding area.


The facility is considered to be appropriately located with other compatible uses and works
as the subject site is predominantly used for pine tree harvesting and logging and contains
existing infrastructure including the existing energex network which runs from north to
south through the centre of the subject site. Fixed wireless coverage in the Soreen Point
area will also aid economic development through potentially increasing business growth

and education potential within the township identified as a identified as a ’Village Centre’
on the Noosa Plan Strategy Map.



Significant areas of mature vegetation on site and within the surrounding area which will
provide screening benefits in all directions from the adjacent properties, transport routes




NBN-4NBZ-4POM-5135    -
                          Boreen Point                                              Page 37

Page 40

and recreational users of Lake Cootharaba. Existing vegetation in the surrounding area
will mitigate views from multiple views as follows:
    .    It is anticipated that the headframe of the facility will only be seen above the
         existing tree canopy when viewed by recreational users of Lake Cootharaba, as
         there is a 200m buffer of dense vegetation (where the tallest tree is 25m high)
         separating the facility from edge of Lake Cootharaba;
    .    When viewed from Lake Flat Road the facility will only become intermittently
         visible at a few minor clearings in the vegetation which aligns the road network;
         and
   .     The  existing vegetation buffer aligning the southern lot boundary which will
         separate and screen the facility from the closest residential dwellings situated
         south west of the facility.


The current site is considered to demonstrate an appropriate balance of the above overall
outcomes whereby the facility has been        appropriately located within an area which        is
characterised by a predominantly low density rural area and will provide improved network
access   to remote locations within the region. In conjunction with the natural vegetation
screening, the proposed location also provides an adequate separation distance from
community sensitive land uses and residential dwellings to assist in minimise the v.isual
obtrusiveness of the facility as follows:
   .   Sited on the periphery of the township approximately 1 km from Boreen Point
       Village;
   .   Setback more than 240m from the closest and only three (3)residential dwellings
         within a 500m radius; and
   .     Setback from all public open space areas including but not limited to;
               o    More than 200 m from the edge of Lake Cootharaba
               o    More than 700 m from Coates Park (Coates Drive)
               o    More than 1 km from Boreen Field Park
               o    More than 1 km from Berg Park (Mango Lane)
               o    More than 1.2 km from Boreen Point Foreshore Park


While it is acknowledged that the proposed facility will be an addition to the locality; it will
not obstruct any significant views or landmarks in the community. This is because the
location of the facility and wider vicinity of the area is not identified as containing any
significant areas, viewpoints or movement corridors in the Planning Scheme maps, namely
as follows;

         .    The subject site is not identified on the Strategy Plan, Noosa Trail Network Map
              Transport Map as being located adjacent to or within vicinity to a Major Road
               or

           Network;
         . The subject site is not identified on the Noosa       Trail Network Map as being
           located adjacent to or within vicinity to any Existing or Future Trail Network;
         . The subject site is not identified on the Pathways and Trunk Network
           Infrastructure Map as being located within proximity of any pathways or
           bikepaths; and
         . The subject site   is not identified on the Heritage Overlay as being located
           within proximity to any heritage sites or character areas.


In addition, visual impacts will be further mitigated by the slimline monopole design and
be colour matched         to the
                             surroundings (if requested by Council). Therefore it is
considered that the proposed facility will be effectively screened from nearby residential
dwellings and other scenic vistas and views from the surrounding area. Refer to Section
8.1 for further visual assessment.


The proposed facility has been appropriately located within a low density rural area and
will not adversely impact the rural zone as the facility has been      intentionally located on



NBN-4NBZ-4POM-5135       -
                             Boreen Point                                             Page 38

Page 41

private rural land to avoid areas of significant natural resources and minimise potential
environmental impacts associated with the development. The subject site is not identified
as  being located in an open space corridor and the specific location of th!3 facility is not
within  existing native vegetation as outlined on Map 4 Open Space Networks. The
establishment of the monopole on the subject site will not affect the farming capabilities of
the site as it will occupy a relatively small lease area (80m2)of the total 106ha of land and
is located on the periphery outside the area of productive land. It is also located a
sufficient buffer distance from environmentally sensitive locations and no vegetation
removal is required.


For these reasons the proposal is considered to comply with the Overall Outcomes of the
Soreen Point, Kin Kin & Cootharaba Locality. Further compliance with the Specific
Outcomes and Probable Solutions is included in Appendix 4 Code Table Assessment.
                                                                        -




7.2.2 Infrastructure Uses Code
A ’Tower’ is considered         as an   Infrastructure Use within the Noosa Plan 2009 and is
therefore assessable against the Infrastructure Uses Code. The overall outcomes for the
Infrastructure Uses Code are contained below.


14.37.2
     a) Residents and visitors have access to adequate levels of infrastructure to meet
                                  .




        their needs;

     b) Infrastructure Uses do not detract from the visual amenity of the major road
        network nor on the rural or residential amenity enjoyed by residents of and visitors
          to Noosa;


     c) Facilities are co-located where appropriate and practical;

     d) Infrastructure uses are energy efficient;

     e) Infrastructure Uses do not pose a threat to public safety;

     f)   The natural character and environmental values of Noosa                 are   protected from
          adverse ifTJpacts associated with Infrastructure Uses; and


     g) Convenient,      comfortable       and   safe   access   is   provided   with   the   design    of
          infrastru.cture U$es.

Compliance
The propos d telecommunications facility is considered to be appropriately located in
order to provide the Soreen Point locality with essential communication services, whilst
mitigating potential visual and amenity impacts.

The introduction of fixed wireless coverage will enhance the community’s potential in
regard to economic and social growth by providing equitable high speed and reliable
internet and communications, not currently prOVided throughout rural areas. Fixed wireless
in the Soreen Point area will aid economic development through                   potentially increasing
business growth, increased education potential and opportunities for residents/farmers to
pursue supplementary incomes through alternative business’pursuits; ultimately improving
the long term sustainability of Soreen Point. Additionally, the introduction of a
Telecommunication Facility will create an ~pportunity for other carriers to co-locate.




NBN-4NBZ-4POM-5135      -
                            Boreen Point                                                      Page 39

Page 42

The proposed facility comprises a 10m x 8 m lease area to be located in the southern
portion of the subject site. It is considered that the facility has been sited appropriately to
minimise detrimental environmental impacts. The location of the facility supports
compliance with the infrastructure code as follows:
      . The     proposed facility has been appropriately sited on the periphery of the
        township and located as far away from residential dwellings as possible while still
         being capable of providing service across the township;
      . The establishment of the monopole on the subject site will not affect the
         agricultural capabilities as it will occupy a relatively small lease area (80m2)of the
         total 106ha of land and is located on the periphery of the site outside the area of
         productive land;
      . the proposed facility is located a sufficient buffer distance from environmentally
         sensitive locations and no vegetation removal will be required; and
      . The proposal will have negligible impact on the environmental quality, ecological
         values or the nature in the region as it is located in a modified rural area


The proposed facility is for a 30 m monopole and associated infrastructure. It is considered
the facility has been located and designed  appropriately to minimise detrimental visual
impacts. Site location and design elements of the proposal that support visual compliance
with this Code are as follows:
     .   The proposed     development has been setback over 1 km from the Soreen Point
         Village;
     .   The facility has been located    on a   site surrounded   by heavily vegetated areas
         which will provide significant screening benefits from all areas of Soreen Point, but
         in particular the residential dwellings to the south east, Lake Cootharaba to the
         east, Lake Flat Road and the Soreen Point township; and
     .   The facility has been designed with the minimal required height and as a slim line
         monopole, which can be colour matched to the surrounding vegetation;

The facility has been      intentionally located within private land for which there is existing
access available. The site       access is considered to be appropriate given the NSN Co

facility will not be a significant generator of traffic and is not anticipated to adversely impact
on the surrounding road network or residential amenity. The proposed facility will also

have restrictions aimed at preventing public access, including a secured compound fence
with a locked gate and warning signs placed around the facility.


It is considered the proposed facility is not inconsistent with the character of the area as it
has been appropriately located in a rural area where similar infrastructure is located, such
as   powerlines, as they provide a necessary service.

For these reasons the proposal is considered to comply with the overall outcomes for the
Infrastructure Uses Code. Further compliance with the Specific Outcomes and Probable
Solutions of the Infrastructure Uses Code is included in           Appendix 4    -
                                                                                     Code Table
Assessment




7.2.3 Earthworks Code


The Overall Outcomes of the Earthworks Code are the following        -




     (a) To ensure that earthworks do not unreasonably impact on the natural environment
         or other properties with regard to -




        (i)     Land stability (including differential settlement or expansion in reactive
                soils);



NBN-4NBZ-4POM-5135    -
                          Boreen Point                                                 Page 40

Page 43

        (H)    Contamination of land;
        (Hi)   Flooding and drainage;
        (iv)   Groundwater, watercourses and wetlands;
        (v)    Loss of native remnant or regrowth vegetation; and

   (b) Earthworks are designed and constructed to be structurally sound.

Compliance
The   proposed facility    will   be   located   within   a   lease   area    of   approximately 80m2.
Earthworks required to construct the facility will be minimal, limited to the extent required
                                                                                                           I   ,


to establish appropriate foundations for the monopole and will not result in any adverse
impacts on land stability, drainage, soil disturbance or existing amenity.

The proposed development will not impact on land stability as the facility has been sited
                                                                                                           \
outside of areas identified as ’Landslide Hazard Area’ on the Natural Hazard: Landslide &                      ,




Flooding Overlay.

Although the land is susceptible to periodic flooding and drainage issues, the proposed
Telecommunication Facility is not for a habitable use and has been sited and designed to
minimise the hazards associated with flooding as follows;
   .    The foundations and earthworks are to follow engineering design standards and
        stormwater dissipation is provided through the proposed gravel compound finish;
   .    The proposed facility will include an elevated steel grillage to raise the equipment
        shelters;
   .    Any discharge points will not affect downstream, upstream or underground streams
        on  any adjoining properties as the facility has been located away from
        watercourses and does not produce effluent run off.


The facility is not located within proximity to any wetlands and no native remnant or
regrowth vegetation clearing is required. In addition the proposal for a Telecommunication
Facility is not a habitable use, does not generate effluent run off and has been setback
approximately 200 m from the edge of Lake Cootharaba and over 300 m from the closest
Regrowth Watercourse.

For these reasons, the propqsed development is considered to comply with the intent and
overall outcomes of the Earthworks Code, and further assessment is not required.


7.2.4 Landscaphlg Code

The Code for Landscaping is required to be assessed                   as   part of this application. The
Overall Outcomes of th s code state the following:


   a) retains, reinforces and enhances the natural landscape character of the site,
      streetscape and locality;
   b) retains existing vegetation and other natural features for their ecological, aesthetic
        and cultural values;
   c) ensures the revegetation and rehabilitation of native wildlife habitat and riparian
      zones to protect and enhance ecological and biodiversity values;

   d) facilitates water management including on-site detention and the efficient infiltration
        of stormwater;
   e)   enables the establishment of appropriate plantings that are of a scale and density
      commensurate with building height, bulk and scale to buffer development and
      conflicting land uses;
   f) enhances privacy between dwelling units and accommodation units;
   g) accommodates the outdoor recreation needs of dwelling occupants; and\
   h) provides adequate vegetation treatment to steep slopes and unstable landforms.



NBN-4NBZ-4POM-5135   -
                         Boreen Point                                                         Page 41

Page 44

                Compliance

                The current development does not propose the establishment of additional landscaping.
                Although     the   subject site predominately   contains   pines   trees for timber   harvesting,
                corridors and areas of existing mature remnant and regrowth vegetation existing around
                the proposed facility which are unlikely to be removed. The proposed facility in an area
                which is bordered by this existing mature vegetation will help reduce visual dominance.
                Additionally, the facility only requires a small footprint area (80m2)and does not require
    ,       \
                the removal of vegetation. Additional landscaping to screen the facility is not considered
                necessary.



                Therefore, the proposal is considered to have a minimal impact on the natural landscape
                or built environment as the existing mature vegetation will be maintained and will act as a

                buffer.


                7.2.5 Driveways and Carparking Code

                The Code for         Driveways and Carparking   is   required to be assessed    as    part of this
                application. The Overall Outcomes of this code are:

                     a) Safe and reasonable access to and from vehicle accommodation and standing
                        areas within a property and from the public road is provided;

                     b) The safety ofpedestrians and cyclists is protected;
                     c) Development reduces the reliance on private vehicles and promotes public and
                        nonmotorised transport options;
                     d) Carparking spaces and the associated manoeuvring areas provided are designed
                        to be safe and functional and meet the reasonable requirements of the particular
                          land use;
                     e) Adequate provision is made for the standing, parking, loading and unloading,
                        access and manoeuvring of service vehicles within the development site;

                     f) Development does not adversely impact on existing public parking;
II                   g) Adequate monetary contributions are made in circumstances where Council
                        considers the provision of external parking will fulfill the parking demand generated
                        by the development and will not have an adverse impact on existing public parking;
                          and
                     h)   Vehicular access does not impact adversely upon existing landscaping or native
                          vegetation. Settling

                Compliance

                The car parking requirements in the Code for Driveways and Carparking does not provide
                a   parking requirement for an ’Infrastructure Use’. However, the points below demonstrate
                a   general compliance with the intent of the code:

I       I            .    Access to theproperty is currently provided via the existing crossover on the
                                 property boundary and via Lake Flat Road and intemal access track
                          northern
                       (approximately 17km long);
                     . This access track is considered to provide safe and convenient access to meet the
                       needs of the maintenance vehicles which will infrequently access the site;
                     . Adequate provision has been allocated for service vehicles to access the site and


                       park whilst undertaking maintenance works;
                     . The proposed development will not increase the number of people living or working


                       in the area and does not require the provision of any formal parking; and

I
I               NBN-4NBZ-4POM-5135      -
                                            Boreen Point                                                Page 42

Page 45

     .  The site access is considered to be appropriate given the NBN Co facility will not
        be a significant generator of traffic and is not anticipated to adversely impact on the
        surrounding road network or residential amenity.

For these reasons, the development is considered to comply with the           Driveways and
Carparking Code.


7.2.6 Biodiversity Overlay Code
                                                                                                  I
The   subject lot   is identified   ascontaining ’Watercourses and Drainage Lines’ and                ;I
’Environmental Protection Areas’ within the Biodiversity Overlay. The Overall Outcomes
relevant to the subject site are as follows:

a) The natural resources of the former Noosa Shire are conserved including-                           "

    (i) land which is of scenic, cultural, historical, educational, recreational, scientific,
          ecological, biodiversity, economic, social or aesthetic value;
    (ii) soil or landforms such as watercourses, drainage lines, foreshores, dunes and
          steep slopes;
    (iii) the ecosystem health and quality of the water, land and other natural resources;
        and
     (iv) the extent and condition of native and remnant vegetation, including wetlands and
          areas of significant regrowth of local origin;



b) The biological diversity of native flora and fauna and their habitats is maintained;

c) Wildlife corridors, vegetation links and riparian vegetation are conserved, managed and
rehabilitate,d to ensure the long term ecological viability and sustainability of native flora
and fauna species;


d) Activities that may impact upon vegetation are managed so as to minimise the impact
upon Noosa’s natural resources, including-
    (i) the ecological values of water catchment areas;
    (ii) that part of the natural environment that may be environmentally harmed by
         vermin, pests, noxious plants or threats such as fire, development and
        inappropriate land management; and
     (iii) vistas and scenic amenity of the landscape;

f)   The replanting or rehabilitation of degraded ecosystems and habitat is achieved;


f) In the case of urban areas, urban amenity, quality of life and ecosystem health is
maintained and enhanced.


Compliance
The proposed facility has been located within a private rural property which is currently
used for farming purposes and outside of areas mapped as ’Riparian Buffer Area’, ’Koala
Habitat Area’ and ’Environmental Enhancement Area’ on the Biodiversity Overlay.


Although the subject site is mapped as containing ’Watercourses and Drainage Lines’ and
’Environmental Protection Areas’, the location of the facility is well removed from these
identified natural areas and within a highly modified rural environment. Additionally, the
development will occupy a small footprint within the site (80 m2) and will involve only minor
excavation works during construction of the facility. As such, the development will not
impact on existing ecological processes or natural drainage systems within the site as it is
setback over 300 m from the closest regrowth watercourse and will not involve the
removal of any vegetation.




NBN-4NBZ-4POM-5135    -   Boreen Point                                               Page 43

Page 46

        For these reasons, the proposed is considered to comply with the Overall Outcomes of the
        Biodiversity Overlay Code, and further assessment is not required.


        7.2.7 Natural Hazards Overlay Code

        The subject site is identified as containing ’Flood Hazard Area’ and ’Subject to minimum
        floor height’ within the Landslide & Flooding         Overlay (refer to Figure 6.5) as well as
        ’Medium Bushfire Hazard Area’ and’ High         -
                                                            Low Potential Acid Sulfate Areas’ within the
        Bushfire & Acid Sulfate Soils Overlay (refer to Figure 6.6). The Overall Outcomes relevant
        to the subject site are as follows:


            a) development in areas at risk from natural hazards is compatible with the nature of
                 the natural hazard;
            b)   the risk to people, property and the natural environment from natural hazards is
                 minimised;
            c) development does not result in a material increase in the extent or severity of
                 natural hazards; and
            d) for acid sulfate areas-the generation or release of acid and associated metal
                 contaminants into the environment is avoided


        Compliance
        Although the proposed facility is located within a Medium Bushfire Hazard area, the
        proposed use will not increase the risk or impact of this natural hazard since it is already
        cleared of vegetation where the foundations and earthworks are to follow engineering
        design standards and will not use equipment that significantly increases the risk of fire. In
        addition   no   buildings are proposed and the proposed development for a
        Telecommunication Facility is not considered to be a habitable use and will not result in an
        additional increase in the number of people living, working or congregating in the Bushfire
        Hazard Area.


        The facility is also identified as containing ’High Potential Acid Sulfate Soils’ between 0 m-
        5 m AHD. The proposal is for a 30 m monopole to be located at approximately 11 m AHD
        natural ground level. The proposed development complies with the overall outcomes of the
        Natural Hazards Overlay Code as it is not anticipated to involve excavation of more than
        100 m3 or filling of more than 500 m3 nor is excavation expected to be undertaken below 5
        m   AHD natural ground level. As such, the proposed          development will not result in the
        disturbance of acid sulfate soils and reflects the State Planning Policy 2/02 Planning and
        Managing Development involving Acid Sulfate Soils.

        The proposed facility will also be located outside of ’Landslide Hazard Areas’ as identified
        on the Natural Hazard: Landslide &       Flooding Overlay. Therefore the proposed use will not
        increase the risk or impact of this natural hazard       as it will   be constructed on level land
        which does not     slope    and is not considered to be unstable. Earthworks           required    to
        construct the facility will be minimal and will not result in any adverse impacts on land
    ,
I       stability.

        The   proposed facility is located within a ’Flood Hazard Area’ and on land ’Subject to
        minimum floor height’ as identified on the Natural Hazard: Landslide & Flooding Overlay.
        However the proposed telecommunication facility is not for a habitable use and has been
        sited and designed with raised equipment cabinets on elevated grillage to minimise the
        hazards associated with flooding. The proposed will not result in an increased risk of flood,
        bushfire or landslide for the area and reflects the State Planning Policy 1/03 Mitigating the
        Impacts of Flood, Bushfire and Landslide.




        NBN-4NBZ-4POM-5135    -
                                  Boreen Point                                                   Page 44

Page 47

For these reasons, the proposed development is considered to comply with the Natural
Hazards Area Code and further assessment is not considered necessary.




7.2.8 Natural Resources Overlay Code

The subject site is id~ntified as containing ’Agricultural Land Conservation Areas’ within
the Natural Resources Overlay (refer to Figure 6.7).The Overall Outcomes relevant to the
subject site are as follows:

a) for agricultural land conservation areas-
  I.     the use of good quality agricultural land for agriculture is not adversely affected by
         other forms of development; and
 II.     uses that are able to be located elsewhere do not locate within agricultural land

          conservation areas;


Compliance
The site is identified on the Natural Resources Overlay as containing Agricultural Land
Conservation Areas (ALCA)however the proposed facility is located approximately 600 m
to the south east of the ALCA and            not located within   a   Coastal Protection Area.
Furthermore, the establishment of the proposed facility will occupy a relatively small lease
area (80 m2) of the total 106ha site area and has been 10Gated on the periphery of the site

to avoid interference. The proposed use for a telecommunication facility will not affect the
current   or   future   agricultural practices site as the proposal is not for a habitable or
sensitive land use, and if the facility is no longer operational the site can be easily
decommissioned and the land rehabilitated. As such, the proposed development will not
result in the disturbance of agricultural land conservation       areas   and reflects the State
Planning Policy 1/12 Protection of Queensland’s Strategic Cropping Land.




                                                                                                   ,   ’




NBN-4NBZ-4POM-5135       -
                             Boreen Point                                             Page 45

Page 48

             8.0            OTHER
                            ENVIRONMENTAL
             CONSTRAINTS AND OPPORTUNITIES
             8.1     Visual Amenity and Setting
             NSN has endeavoured to strike a balance between providing services and minimising any
             visual impact on the community and local environment. Telecommunication facilities need
             to be located in or near the area for which    they are designated to provide or improve
             coverage. This particular location was partly chosen as it provides a significant element of
             separation from nearby sensitive land uses whilst meeting the required radio frequency
             (RF)coverage for the Soreen Point area. The height of the proposed tower is the minimum
             required to achieve NSN RF objectives.

             The wider area of Soreen Point is characterised      by large farming properties, heavily
             vegetated areas and large rural-residential allotments. The subject site is located
             approximately 1 km north west of the Soreen Point township. The subject property is
    ~.       currently used for farming purposes, predominately forestry and logging. The proposed
             facility will comprise an 8 m x 10m lease area to be located adjacent to the south eastern
             lot boundary of the site. Figure 8.1 below demonstrates the characteristics of the subject
             site.




         ’
I




             Although the subject site predominantly contains pine trees for timber harvesting, there are
             also corridors and areas of exiting mature remnant and regrowth vegetation which will
             never be removed. Figure 8.2 provides an aerial photograph demonstrating the existence

I        ’   of existing mature vegetation in the surrounding area which will provide screening benefits




             NBN-4NBZ-4POM-5135   -
                                      Boreen Point                                             Page 46

Page 49

in all directions from the adjacent properties, transport routes and recreational users of
Lake Cootharaba.




                                                                                                         I
                                                                                                         -,’




 Figure 8.2: Subject-site nd surrounds d m nstrating existing-mature vegetation ili the wider vicinity
   which will provide for visual screening benefits (Source: http://maps.sunshinecoast.qld.gov.au)


As indicated in Figure 8.2 existing mature vegetation aligns Lake Flat Road and provides
a  buffer from Lake Cootharaba which is located approxi_mately 200 m east of the
proposed facility. This separation distance in conjunction with the mature vegetation
corridor where the tallest trees are approximately 25 m in height will, screen the majority
of the facility from recreational users on Lake Cootharaba who will only see the
hea’dframe of the facility above the existing tree canopy. Additionally when viewing the
facility from Lake Flat Road, the facility will only become intermittently visible at a few
minor clearings in the vegetation along the road. These views are not anticipated to be
visually obtrusive as Lake Flat Road is travelled by motor vehicles only at a constant
speed and does not provide any opportunities for vehicles to become stationary.

Figure 8.3 and 8.4 below illustrates the current appearance of the site when viewed from
Lake Flat Road and the existence of trees which align the road network.
                                                                                                               ,   ,




NBN-4NBZ-4POM-5135     -
                           Boreen Point                                                     Page 47

Page 50

,
    \




         Figure 8.3: View looking north-west towards proposed location of the facility (arrowed)from lake Flat Road




                               ng nort          towards proposed location of the facility (arrowed)from lake Flat Road
                                         and driveway to closest residential dwellings




        NBN-4NBZ-4POM-5135     -
                                   Boreen Point                                                             Page 48

Page 51

The previous figure 8.2 also illustrates the exi~ting vegetation buffer aligning the southern
lot boundary which will screen the facility.from the closest residential dwellings situated
south west of the facility. Again the existing vegetation in association with the adequate
setbacks of over 240 m from the closest dwellings will provide a degree of screening and
assist in minimising the visual dominance of the structure when viewed from the.closest
residential dwellings.


Figure 8.5 illustrates a view looking west demonstrating the buffer of mature vegetation on
the southern property boundary which will s         parate the proposed facility from the closest
residential dwellings~ When viewed from the nearby residential dwellings it is anticipated
                                                                                                           I    I

that only the top of the facility will be. visible. Furthermore these views are not anticipated
to be visually pbtrusive or detract from the natu~allandscape and character of the area.




                                                                                                           .1




     ,
            8.5:       ng                            .southern            boundary (arrowed)and other
     existing ’mature,vegetation on’the property which will provide for visual screening benefits to.the
          .




                                    adjoining prop~rti’es (looking west)
                                              "



In conjunction with the natural v~getation screening, the proposed location also provides
an  adequate separation distance and setbacks from community sensitive locations which
will also assist in mir;Jimisi’rig the’visual obtrusiveness of the facility as follows:
      . The    proposed facility is’ apprqpriately sited on the periphery of the township
        (approximately 1 km fn;>m Boreen Point Vi,lIage);
      .   The proposed location is setback more than 240 m from the closest and only three
          (3)residential dwellings ’within a 500 m radius; and.
      .   Setback from li public open space areas including but not limited to;
             o   More than 200 m"from the edg.e. f lake Cootharaba
                  .




             o   More than 700 !11 fr.om Coate~ Park (Coates Drive
              o       More than 1 km from Boreen Field Park
              o       More than 1.2 km from Boreen Point Foreshore Park




NBN-4NBZ-4POM-5135         -
                               Boreen Point                                                     Page 49

Page 52

             Figure 8.6 below illustrates the view looking north (taken from the ancillary shed) towards
             the existing energex network which runs from north to south through the subject site. The
             existing power corridor can also be seen in previous Figure 8.2 and demonstrates the
             facility has been appropriately located on a site that contains existing infrastructure.
                                               ,

                                                   ,’,                           .
                                                                                                   .
                                                                                                            ,;"~~r----

                                               ~,J                 :"’                -:                                                 "
                                                                                                                                             ,




             [I"",
                                                        "




                                                             ~Ii           U
                                                                                     !_i’
                                                                                                I~
                                                                                                     li;;tl.W        ’.d        ~:      i""~
                                                                                                                                                 .




                                                                                                                                                      I   .

                                                                                                         l!"                            .                     ’}
                                                                                                                                                          "



                   :    l..   ~
                                                             t"~1
                                                                   ~.
                                                                                 ~
                                                                                     ,."
                                                                                                                           ..

                                                                                                                                !I:’_             ,       r~
                                                                                                                                                          .




                                                                           ...




                    "                                                                                           ,.                       r   ~   n:

                                                             :11                           ’-
             t"
                                                        "’
                                                             ~;’ ,.~’1-
                                                                       r        .~                                   oJ
                                                                                                         ’>,q

                                                                   "
                                                                           _.
                                                                                 .
                                                                                      t’         ,




                                                       A.l ; ;~~~: .~                                            .~-~..~. ~:.;
                                                                                                ,,",.’
                                                                                       ...




                                                        .
                                                        .      .




             Ii




    J.




~        I




I




I


                  Figure 8.6: View looking north (taken from the ancillary shed)towards the existing energex network
                                        which runs from north to south through the subject site.


             While it is acknowledged that proposed facility will be an addition to the locality; it will not
             obstruct any significant views or landmarks in the community. This is because the location
    "        of the facility and wider vicinity of the area is not identified as containing any significant
             areas,               viewpoints or movement corridors in the Planning Scheme maps, namely as
             follows;
                                  .   The subject site is not identified on the Strategy Plan, Noosa Trail Network Map
                                      or   Transport Map as being located adjacent to or within vicinity to a Major Road
                                      Network;
                                  .   The    subject site is not identified on the Noosa Trail Network Map as being
                                      located adjacent to or within vicinity to any Existing or Future Trail Network;
                                  .   The    subject           site                          is          not              identified                          on     the    Pathways and Trunk Network
                                      Infrastructure               Map                           as             being located                                      within   proximity of any pathways or
                                      bikepaths; and
                                  .   The subject site is not identified                                                                         on            the Heritage      Overlay as being   located
                                      within proximity to any heritage sites or character areas.


             It is therefore considered the facility has been located and                                                                                                        designed appropriately to
             minimise detrimental visual and environmental impacts. Once established the monopole
             will not adversely impact upon the environment or scenic amenity as:




             NBN-4NBZ-4POM-5135                    -
                                                       Boreen Point                                                                                                                              Page 50

Page 53

                                                                                                            ,
                                                                                                                  !
                                                                                                                      I
    .    The proposed facility is appropriately located in a rural area that is not void of
         man-made structures such as power lines and sealed roads. In this context, the
         proposed facility is a typical form of urban infrastructuJe used to support improved
         telecommunication coverage in urban and rural areas:
     .   The proposed facility is located a sufficient buffer distance from environmentally
         sensitive locations and no vegetation removal will be required;
    .    The facility has been located    on a   site surrounded   by heavily vegetated areas
         which will provide significant screening benefits from all areas of Boreen Point, but
         in. particular the residential dwellings to the south east, Lake Cootharaba to the
         east, Lake Flat Road and the Boreen Point township;
    .    The proposed facility is setback over 700 m from all public open spaces within the
         wider area, specifically 1 km from the. Boreen Point Sorts and Recreational Park
                                                                                                        .

                                                                                                            I.
          nd Centre and 1.2 km from Boreen Point Foreshore Park;
    .    The monopole was selected .for the proposal due to its slim line appearance and
         minimal visual obtrusiveness when viewed from a distance; and
    .. The monopole design is deemed to be more appropriate than a lattice tower as it

         can   be painteq a colour that will provide for visual integration and camouflage the
    ..




         facility with the surrounding landscape and vegetation
                                                                                                                ’,-


The proposed facility has been appropriately sited on the periphery of the.township and
located as far aw~y from residential dwellings as p0~sible whilst still        being capabl        of
prQviding service across the township and having minimal effect on the scenic amenity of
the area.: While it is acknowledged that the proposed facility will be an addition ’to the
locality, communication facilities are now ar acceptable part of the landscape (much like
powerlines) as they provide a necessary service and essentially contribute to the well eing
to the Boreen Point area.


8.2      Heritage
In order to determine any possible natural or cultural values of stpte or national
significance- associated with the site, a search was conducted through the’ relevant
Heritage’ Registers (refer to Appendix 5). There are no known items of cultural, historical
or environmental h’eritage significance located in the vicinity of the proposal site.



8.3      Electricallnte erehce and Grounding of the Facility
The NBN fixed wireless broadband network is licensed by the Australian Communications
and Media Authority (ACMA)for the exclusive use of the OFDMA2400 frequency band. As
NBN Cd is.the exclusive licensee of this sub-band, emissions from NBN Co equipment
within the frequency band will not cau,se interference:

Filters also ensure, that each facility meets’the ACMA specifications for emission of
spurious signals outside the NBN Co frequency allocations. NBN Co will promptly
investigate any interference issues that a~e reported.

The facility is also grounded to the relevant Australian Standards    -
                                                                          that is, the facility will
be ’earthed’.


8.4      Erosion, Sedimentation Control and Waste Management
All erosion and sediment confro mitigation measures will be detailed in construction plans
and will comply with the Building Code of Australia and local Coundl standards. In
addition, contractors must comply with the ’NBN Construction Specification’ that requires
contractors to undertake the necessary erosion and sediment control measures in order to
’protect the surrounding environment. On completion of the installation, the site will be




NBN-4NBZ-4POM-5135     -   Boreen Point                                                  Page 51

Page 54

    restored and reinstated to an appropriate standard. No waste which requires collection or
    disposal will be generated by the operation of the facility.

    8.5       Remnant and Regrowth Vegetation
    In order to determine any existing remnant and regrowth vegetation on site, a search was
    conducted through the relevant environmental searches (refer to Appendix 5). Under the
    VMA the subject site is mapped         containing both Regrowth and Remnant Regional
                                               as

    Ecosystems. The   proposed development will not require a permit or notification to the
    DNRM as it will be located in a cleared area and appropriately set back from the identified
    Remnant Vegetation.


    8.6       Flora and Fauna & Endangered Species

    In order to determine any possible Endangered Species associated with the site an EPBC
    report was obtained (refer to Appendix 5). The EPBC Act Protected Matters Report
    illustrates that some endangered species are present within the 1 km radius search ring;
    however the proposal for a Telecommunication Facility is not considered an activity that
    will have a significant impact on any threatened or migratory species in the area.


    8.7       Social and Economic Impacts

    High quality broadband internet access is a necessary service in modern society. Initially,
    small to medium business customers accounted for a significant part of the demand for
    broadband technology, but broadband services have now been embraced by the general
    public. Usage of broadband services continues to widen as new technologies become
    progressively more affordable and accessible for the wider community.

    The proposed      development will provide significantly enhanced fixed wireless broadband
    coverage to the locality of Boreen Point. This will be of particular benefit to existing rural
    businesses and dwellings in the locality.


    The new National Broadband Network will provide the community with far greater access
    to high   quality broadband services. Reliable broadband internet is important to facilitate
    the economic growth of communities, and the facility is likely to have significant social and
    economic benefits for the local community.


    8.8       Public Safety

    8.8.1 Radiofrequency Emissions

    In relation to public safety and specifically Electromagnetic Emissions (EME)and public
    health, NBN       Cooperates within the operational standards set by the Australian
    Communication and Media      Authority (ACMA)and Australian Radiation Protection and
    Nuclear Safety Agency (ARPANSA). ARPANSA is a Federal Government agency
    incorporated under the Health and Ageing portfolio and is charged with the responsibility
    for protecting the health and safety of both people and the environment from the harmful
    effects of radiation (ionising and non-ionising).


    All   NBN   Co    installations   are     designed   and   certified   by qualified professionals    in
    accordance with all relevant Australian Standards. This ensures that the NBN Co facility
    does not result in any increase in the level of risk to the public. This facility is to be
    operated in compliance with the mandatory standard for human exposure to EME                         -




    currently   the   Radio    communications       (Electromagnetic       Radiation   Human   Exposure)
    Standard 2003. The EME Report associated with this site is included in Appendix 6. The
    report shows that the maximum predicted EME level will equate to 0.052% or greater than
\




    NBN-4NBZ-4POM-5135     -
                               Boreen Point                                                    Page 52

Page 55

                                                                                                           II

4,760 times below the maximum exposure limit. This is substantially less than 1 % of the
maximum allowable exposure limit (where 100% of the limit is still considered to be safe).


Moreover, all NBN Co equipment has the following features, all of which mini mise the
amounts of energy used and emitted:

   .    Dynamic/Adaptive Power Control is a network feature that automatically adjusts              (’""

        the power and hence minimises EME from the facility.

   .    Varying the facility’s transmit power to the minimal required level, minimising EME
        from the network, and

   .    Discontinuous       transmission,   a   feature   that   reduces   EME   emissions   by
        automatically switching the transmitter off when no data is being sent.

8.8.2 Access

The ProP9sed facility will have restrictions aimed at preventing public access, including a
secured compound fence with a locked gate and warning signs placed around the facility.



8.9     The Public Interest and the Benefits of Telecommunications                                  .-’-

The proposed NBN Co facility will have significant benefit for residents in the Soreen Point
area. NBN     Co believe that the public interest would be served by approval of the proposal,
providing benefits for enhanced broadband coverage in the area.
                                                                       "




8.9.1 Other Benefits of Reliable Broadband Services

There are numerous other benefits of telecommunications connectivity, as follows:                 ".1


   .    There are many educational benefits justifying the implementation of the National
        Broadband Network. Curriculum and data sharing, increased availability and
        accessibility of research materials, and virtual classroom environments are good
        examples. Such elements are particularly beneficial within a tertiary education
        context.

   .    Businesses can, through internet usage, increase efficiency through time, resource
        and  monetary savings. Improved broadband services may effectively             remove

        physical distance and travel time as a barrier to business.
   .
        Imp,rovements to broadband services may also be of benefit for local employees,
        by "enabling telecommuting and home business. The telecommuting trend is
   ""


        heavily reliant on access to high quality internet services, and is anticipated to
        continually increase in popularity.

The public benefits of access to high quality broadband have been widely acknowledged
for many years. Reliable internet access is now more than ever an integral component, so
much so that its absence is considered a social disadvantage.


8.9.2 Consultation


NBN Co is adopting a proactive, whole-of LGA approach to consultation for the Fixed
Wireless Network in the Sunshine Coast region. Following discussions with Council, NSN
Co have    designed a Communications Plan which outlines the communications and
consultation approach supporting the rollout of the NBN Fixed Wireless network in the
Sunshine Coast LGA.


                                                                                                    ,
                                                                                                           I
NBN-4NBZ-4POM-5135     -
                           Boreen Point                                              Page 53

Page 56

         Prior to lodgement of the Development Application to Sunshine Coast Regional Council,
         NBN Co and Aurecon held an Information Session for those residents that will receive the
         NBN Co services. This involved a high level discussion of the proposed locations, facility
         designs and topographical characteristics and constraints of the area.

         Please refer to   Appendix        7 for NBN   Co’s Communications Plan and all material
         advertised to date.




,...._




-’.




         NBN-4NBZ-4POM-5135    -
                                   Boreen Point                                          Page 54

Page 57

9.0              CONCLUSION"::;

The   proposed   NBN Co facility, compnslng     a   30 metre   high monopole with   attached
antennas and outdoor cabinets has been sited in the most appropriate location whilst
ensuring adequate coverage is achieved.

The facility has been     strategically sited and designed to mini mise visibility within the
surrounding environment as much as practicable. In this regard the proposal satisfies the
requirements of the Telecommunications Act 1997, whilst also addressing coverage
deficiencies within the local area.
                                                                                                J’o.



The proposal is also broadly consistent with the stated objectives of the Noosa Plan 2009.
It is considered that the proposal will provide an important community benefit to Boreen
Point by providing coordinated and open access shared communication infrastructure, and
therefore greatly improved fixed wireless broadband coverage within the local area.




NBN-4NBZ-4POM-5135   -
                         Boreen Point                                               Page 55

Page 58

       Appendix 1
       Transmission Imagery




,..,




       NBN-4NBZ-4POM-5135   -
                                Boreen Point   Page 56


[OCR of page images]
Appendix 1

Transmission Imagery

NBN-4NBZ-4POM-5135 — Boreen Point Page 56

Page 59

NBN Co Fixed Wireless Network   -
                                    Sunshine Coast Regional Council

             Pomona FAN (looking east from Boreen Point)

Page 60

Appendix 2
Copy of Title




NBN-4NBZ-4POM-5135   -
                         Boreen Point   Page 57


[OCR of page images]
Appendix 2
Copy of Title

NBN-4NBZ-4POM-5135 — Boreen Point Page 57

Page 61

                                 CURRENT TITLE           SEARCH

                       DEPT OF NATURAL            RESOURCES AND      MINES, QUEENSLAND
   Request    No:    14374006

  Search Date:        02/08/2012 16:17                                       Title Reference:       14511243

                                                                                  Date   Created:   02/11/1970


  Previous Title:        11860161
                         11901011



  REGISTERED    OWNER



  Dealing No:        702814939     29/07/1998


  GRAEME BERESFORD ARBUCKLE



  ESTATE AND    LAND



   Estate     in Fee    Simple

   LOT   2           REGISTERED    PLAN      126723

                     County of MARCH                            Parish of NOOSA
                     Local Government:           SUNSHINE COAST



  EASEMENTS, ENCUMBRANCES AND                INTERESTS



         1.   Rights    and    interests reserved to the Crown               by
              Deed    of Grant No.      11211183         (POR 147)
                       (POR 279)
              Deed    of Grant No.      11901011         (POR 73)


  ADMINISTRATIVE       ADVICES     -
                                       NIL

  UNREGISTERED        DEALINGS     -
                                       NIL




  CERTIFICATE        OF TITLE    ISSUED      -
                                                 No


                                  **   End       of   Current   Title   Search    **




  COPYRIGHT     THE    STATE    OF QUEENSLAND           (DEPT OF   NATURAL   RESOURCES AND     MINES)   [2012]
  Requested By:        D APPLICATIONS            SAI GLOBAL




                                                                                                      Page 1/1




Printed by Espreon 02/08/201216:17 PM AEST                         For: LH   Ref: N-4NBZ-4POM-5136-BOREEN P Page 1/1

Page 62

Appendix 3
Proposal Plans




NBN-4NBZ-4POM-5135   -   Boreen Point   Page 58


[OCR of page images]
Appendix 3

Proposal Plans

NBN-4NBZ-4POM-5135 — Boreen Point Page 58

Page 63

                                                                                                                                                                                 Client:




     DATE OF ISSUE

     DRAWING PACKAGE VERSION
                                                                                                 I ~I ~I I I I I
                                                                                                     1       2
                                                                                                 I       I       I
                                                                                                                                                                                   NBNCo
     GENERAL
                                                                                                                                                                                                             Limited
     4POM-51-35-BRP-T1 [ COVER SHEET                                                                 01 [ 02 [
                                                                                                 I
     4POM-51-35-BRP-Cl [ SITE SPECIFIC NOTES AND ANTENNA TABLE
                                                                                                 I
                                                                                                     01 [ 02 [
                                                                                                                     SITE No: 4POM-51-35-BRP                                     Client:




    4POM-51-35-BRP-C2 [ OVERALL SITE PLAN
    4POM-51-35-BRP-O I SITE SETOUT PLAN
                                                                                                 I
                                                                                                     01 [ 02 [

                                                                                                 [ 01 [ 02 I
                                                                                                                                                                                                      :II
    4POM-51-35-BRP-C4 I SITE ELEVATION AND DET AILS
                                                                                                 [ 01 [ 02 [                                                                                           ;iii
                                                                                                                     BOREEN POINT                                                           ERICSSON
     STRUCTURAL

                                                                                                                                                                                 Client:




                                                                                                                     153 LAKE FLAT ROAD,

     ELECTRICAL
                                                                                                                     SOREEN POINT,
                                                                                                                     QLD 4565
                                                                                                                                                                                 Project


                                                                                                                                                                                 NATIONAL BROADBAND
                                                                                                                                                                                                   NETWORK
                                                                                                                                                                                 SITE No: 4POM-51-35-BRP
    EME EXCLUSION ZONES                                                                                                                                                               BOREEN POINT
                                                                                                                                                                                       153 LAKE FLAT ROAD,
                                                                                                                                                                                            BOREEN POINT,
                                                                                                                                                                                                     OLD 4565


     REFERENCE DOCUMENTS
                                                                                                                                                                                             PRELIMINARY




                                                                                                                                                                                 02    22.01.13 TX l RF REVISED
                                                                                                                                                                                 01    14.01.13   PRELIMINARY ISSUE
                                                                                                                                                                                 Rev   Date       Revision Detais




                                                                                                                                                                                 .

                                                                                                                                                                                 aurecon
                                                                                                                                                                                 Aurecon Australia Pty Ltd     ABN 54 005 139 873




                                                                                                                                                                                  DESIGNER:                         MR
                                                                                                                     PROJECT SUMMARY                                              CHECKED:                          JR
                                                                                                                     PROPOSED NBN GREENFIELD 30m MONOPOLE                         APPROVED:                         JI
                                                                                                                     PROPOSED NBN OUTDOOR CABINETS ON ELEVA TED STEEL GRILLAGE    Drawing TItle:
    DISTRIBUTION
                                                                                                                                                                                  COVER SHEET
    ERICSSON                              ROB GUY                                                            1
                                                                                                         [
    AURECON                               JAMES IRWIN


                                                                                                                                                                                  Drawing No.

                                                                                                                                                                                  4POM-51-35-BRP-T1                         02
COPYRIGHT@ NBN Co LIMITED ABN 86 136 533 741   ALL RIGHTS RESERVED. VERSION 10
                                               .
                                                                                 -
                                                                                     SEPT 2011

Page 64

                                                                                                                                                                                                                                                                                                Client:

                                                                                                                           NBN ANTENNA CONFIGURA TION
                                                                                                                                                                                                                                                                                                                                   ~;
                                                                             ANTENNA DETAIL                                                                                   MAIN FEEDER DETAIL                          RRU DETAIL                                RF TAIL
                                                                                                                                                                                                                                                                                                                                   -
      SECTOR     SYMBOL
                                                              DIMENSION                              AZIMUTH                                    QUANTITY                      HYBRID   CANISTER CANISTER TO
                                        TYPE                     HxWxD         C/L HEIGHT             (TN)     MECH TILT      DESTINA TION        RAU           TYPE          LENGTH    HEIGHT     RRU LENGTH   TYPE              LOCATION                   TYPE                LENGTH
                                                                                                                                                                                                                                                                                                  NBNCo
          1
                                                                                                                                                                                                                                                                                                                             Limited
          2          c?       ARGUS-LLPX411F-6-V1            1180x300x115                30m           900        o              N/A              NIA                                                  2m       RRUS61         BELOW ANTENNA               H&S 112"               1.5m          Client:

                                                                                                                                                            H&S HYBRID 19nm    40m        28m                                                         BIRD-PROOFED
          3
                    ~         ARGUS-LLPX411F-6-V1            1180x300x115                30m          190.        o              NIA              N/A                                                  2m       RRUS61         BELOW ANTENNA              LlSCA CABLE             1.5m
                                                                                                                                                                                                                                                                                                                      :=;
          4                                                                                                                                                                                                                                                                                                           ;ii
         5                                                                                                                                                                                                                                                                                                 ERICSSON

          6

                                                                                                                                                                                                                                                                                                Client:
                                                                                                                                                              ERICSSON
         A          ~               PARABOLIC                    <300                    28m          330.       N/A       BOREEN POINT NORTH
                                                                                                                                                                7.6mm
                                                                                                                                                                                35m


         B


          C


         D


         E
                                                                                                                                                                                                                                                                                                 Project
                                                                                                                                                              ERICSSON
        GPS                       KRE 1012082/1                 <69x96                   25m          N/A        N/A              N/A             N/A                           10m                                                                           -                        -




                                                                                                                                                                7.6mm                                                                                                                           NATIONAL BROADBAND
                                                                                                                                                                                                                                                                                                                  NETWORK
I
I’
                                                                                                                                                                                                                                                                                                SITE No: 4POM-51-35-BRP
               SITE INFORMA TION:
I                                                                                                                                                                                                                                                                                                    BOREEN POINT
                                                                                                                                                                                                                                                                                                      153 LAKE FLAT ROAD,
                                                                                                                                                                                                                                                                                                                                                         .




              1. SITE ADDRESS
              LOT 2 ON RP126723, 153 LAKE FLAT ROAD, BOREEN POINT, QLD 4565


              2. GENERAL
                                                                                                                                    8. EXISTING SITE HAZARDS
                                                                                                                                    THE FOLLOWING HAZARDS ARE PRESENT ON THIS SITE:
                                                                                                                                    -




                                                                                                                                    -
                                                                                                                                        PERIODIC FLOODING
                                                                                                                                        COMMERCIAL FORESTRY PLANTATION
                                                                                                                                                                                                                A
                                                                                                                                                                                                                                                                  @                                        BOREEN POINT,
                                                                                                                                                                                                                                                                                                                    QLD 4565

                                                                                                                                                                                                                                                                                                            PRELIMINARY
                                                                                                                                                                                                                                        Jll
              THE CONTRACTOR SHALL COMPLY WITH ALL RELEVANT NBN CONSTRUCTION STANDARDS,
              CURRENT AUSTRALIAN STANDARDS AND SPECIFICATIONS.                                                                      9. ELECTRICAL SUPPLY
                                                                                                                                    UPGRADE OF ENERGEX NETWORK TO BE CONFIRMED
              3. SITE ACCESS                                                                                                                                                                                                        o   0
                                                                                                                                                                                                                                            0


              SITE ACCESS VIA EXISTING 1.75km TRACK FROM LAKE FLAT ROAD (NORTHERN LOT                                               10. TRANSMISSION LINK                                                                 o



              BOUNDARY), MINOR UPGRADE REQUIRED.                                                                                    REFER TO TABLE ABOVE.                                                            00        ~..               ooo (W                                         02    22.01.13   TX & RF REVISED

                                                                                                                                                                                                            ~
                                                                                                                                                                                                                                                                                 ~              01    14.01.13   PRELIMINARY ISSUE




                                                                                                                                                                                                                ~\ :.0.:0:                                  ~                                   Rev    Dale      Revision Delais

              4. EQUIPMENT                                                                                                          11. ADDITIONAL INFORMATION                                                                                                                   ~
              PROPOSED NBN OUTDOOR CABINETS TO BE INST ALLED ON ELEVA TED STEEL GRILLAGE                                            NO RET AINING WALLS ARE PROPOSED.
              WITHIN NBN LEASE AREA.                                                                                                NO LANDSCAPING IS PROPOSED                                                                o........~ 00                                                     .
                                                                                                                                    (REFER TO PLANNING REPORT).
                                                                                                                                                                                                                                  i1l


                                                                                                                                                                                                                                  -.
                                                                                                                                                                                                                                         ~’
                                                                                                                                                                                                                                                                                                aurecon
              5. STRUCTURE
              PROPOSED NBN 30m MONOPOLE.
                                                                                                                                    NO STORMWATER DETENTION IS REQUIRED.
                                                                                                                                    NO VEGETATION CLEARING IS REQUIRED.
                                                                                                                                                                                                                              "j                                                                Aurecon Auslralia Ply Lid     ABN 54 005 139873




                                                                                                                                    PAINTING/WARNING LIGHTS TO COMPLY WITH STATUTORY                                                        ’Y


              6. ANTENNA ACCESS                                                                                                     AUTHORITY REQUIREMENTS.                                                                                                                                      DESIGNER:                         MR
              ANTENNAS ARE PROPOSED TO BE ACCESSED USING LADDER AND LAD-SAF BY RIGGER
                                                                                                                                                                                                                                                                                                 CHECKED:                          JR
              QUALIFIED PERSONNEL ONL Y.
                                                                                                                                                                                                                                                                                                 APPROVED:                         JI
                                                                                                                                                                                                                 3                                                                               Drawing T1tIe:
              7. EXISTING SERVICES
              THE CONTRACTOR SHALL IDENTIFY AND CONFIRM THE LOCA TlON OF ALL RELEVANT EXISTING                                                                                                                                                                                                   SITE SPECIFIC NOTES
              SERVICES AS REQUIRED PRIOR TO COMMENCEMENT OF WORKS.                                                                                                                                                                                                                               AND ANTENNA TABLE
                                                                                                                                                                                                         ANTENNA SETOUT PLAN
                                                                                                                                                                                                                                 SCALE 1:50                                                      Drawing No.                                  Revision


                                                                                                                                                                                                                                                                                                 4POM-51-35-BRp.C1 02
     COPYRIGHT@ NBN Co LIMITED ABN 86136 533 741   ALL RIGHTS RESERVED. VERSION 10
                                                   .
                                                                                     -
                                                                                         SEPT 2011                                                                                                                                                                20
                                                                                                                                                                                                                                                                       "   ,’?    01       ,~        10          20         30
                                                                                                                                                                                                                                                                                                                                        4.0    50~m ~

Page 65

                                                                                                                                                                                                                                                                          Cllenl:

                                                        SITE LOCATION
 ~JL
                                                                                                                                                                  @
  ---....__,,_-~   ...__

                   ~---..__~


                                                                                                                                             @                                                                                                                             NBNCo
                                                                                                                                                                                                                                                                                                      Limited
                                                                                                                                                                                                                                                                          Client:




                                                                                                                                                                                                                                                                                               :II
                                                                                                                                                                                                r/I-/                                                                                          ;i
                                                                                                                                                                                                           -




                                                                      c::_
                                                                                                                                                                                            "-
                                                                                                                                                                                                 I
                                                                                                                                                                                                                 / -
                                                                                                                                                                                                                           }-~FJ-~OAD    / -
                                                                                                                                                                                                                                                                                    ERICSSON

                                                                                                                                                                                            I                                               /



                                                                                                                      ’\
                                                                                                                                                                                        "-
                                                                                                                                                                                                 (,
                                                                                                                                                                                                  ~
                                                                                                                                                                                                           EXISTING ACCESS
                                                                                                                                                                                                    (APPROX 1.75kml
                                                                                                                                                                                                                                                                          Client:


                                                                                                          .......~._:            ........,                                              I        ’\

       i(                                                                                    ’I’
                                                                                                             na
                                                                                                          ._~_
                                                                                                                  ,




                                                                                                                 ""-....
                                                                                                                      ~~
                                                                                                                           t>PQ’nt



                                                                                                                            j
                                                                                                                             t
                                                                                                                             ~
                                                                                                                                    ""-
                                                                                                                                       J
                                                                                                                                         \
                                                                                                                                         1
                                                                                                                                                                                    "-




                                                                                                                                                                                    I
                                                                                                                                                                                                      \
                                                                                                                                                                                                      \              \           LOT 2                         LOT 313
                                                                                                                                                                                                          -==-       y

 COPYRIGHT @ OPENSTREETMAP CONTRIBUTORS, CC BY-SA                                                                                                                                                                ~    ’"     RP126723                         MCH3020
 http://www.openstreetmap.org
 http://creatlvecommons.orqllicenceslby-sal2.01
 Use of this Image Is subject to the terms and condldons of the Creatlve Commons AttrlbuUon-ShareAJlke 2.0
                                                                                                                                                                                I                                  ,~
 licence, the full licence of which can be accessed at http://creatlvecommons.orgllcenseslbv=sal2.0I1egalcode
                                                                                                                                                                               "-


                                                                                                                                                                                                                     \ "’,V~NETWORK
                                                                                                                                                                                                                                      EXISTING ENERGEX                    Project

                                                                                                                                                                               I                                         ~                                               NATIONAL BROADBAND
                                                                                                                                                                           "-                                                                            __

                                                                                                                                                                                                                                                                                           NETWORK
                                                                                                                                                                                                                             \~
                                        SITE CO-ORDINATES                                                                                                                  I                                                 ~    ,                      \~              SITE No: 4POM-51-35-BRP
                                                                                                                                                                       "-
                                                                                                                                                                                                                                                         ~                    BOREEN POINT
                                                     MONOPOLE LOCATION                                                                                                 I                                                     \ \\                         \~                   153 LAKE FLAT ROAD,
                                                                                                                                                                                                                                                                                    BOREEN POINT,
                                                                                                                                                                                                                                                          __o
                                     DA TUM: MGA (GDA94)                                  I ZONE:                56
                                                                                                                                                                    "-


                                                                                                                                                                                                                              ~J                              \~
                                                                                                                                                                                                                                                                                             OLD 4565

                                     LATITUDE                                                                -26.277200                                       P                                                                  ~                                                   PRELIMINARY
                                     LONGITUDE                                                                  152.987630
                                                                                                                                                                                                                                 II
                                     EASTING                                                                          498 765
                                     NORTHING                                                                    7 093 617

                                                                                                                                                                                                                                                                         02    22.01.13 TX & RF REVISED
                                                                                                                                                                                                                                                                         01    14.01.13   PRELIMINARY ISSUE

                                                                                                                                                                                                                                                                         Rev    Date      Revision Details




                                                                                                                                                                                                                                                                         .
                                                                                                                                                                               LOT 1
                                                                                                                                                                       SP109944                                                                                          aurecon
                                                                                                                                                                                                                                                                         Aurecon Australia Ply Lid      ABN 54 005 139 873
          LEGEND

          -
                    A E    -
                               A E    -
                                                  EXISTING ELECTRICAL OVERHEAD
                                                                                                                                                                                                                                                                          DESIGNER:                          MR
          -
                   NUE     -
                               NUE    -
                                                  NBN UNDERGROUND ELECTRICAL LINES                                                                                                                                                                                        CHECKED:                           JR
                                                                                                                                                                                                                                                                          APPROVED:                          JI
                                                  PROPERTY BOUNDARY
                                                                                                                                 NOTES                                                                                                                                    Drawing TItle:

                                                                                                                                 NO RETAINING WALLS ARE PROPOSED.                                                                                                         OVERALL
                                                                                                                                 NO LANDSCAPING IS PROPOSED (REFER TO PLANNING REPORT).
                                                                                                                                                                                                                                                                          SITE PLAN
                                                                                                                                 NO STORMWA TER DETENTION IS REQUIRED.
                                                                                                                                                                                                                     OVERALL SITE PLAN
                                                                                                                                 NO VEGETATION CLEARING IS REQUIRED.
                                                                                                                                 PAINTING/WARNING LIGHTS TO COMPLY WITH STATUTORY                                                SCALE 1:8000
                                                                                                                                                                                                                                                                          Drawing No.
                                                                                                                                 AUTHORITY REQUIREMENTS.
                                                                                                                                                                                                                                                                          4POM-51-35-BRP-C2 02
COPYRIGHT@NBNCoLlMITED ABN 86136 533 741.ALL RIGHTS RESERVED. VERSION 10                                         -
                                                                                                                      SEPT 2011

Page 66

                                                                                                                                                                                                                     Client:




                                                                                                                                                                                                                                                            QtI
     @
                                                                                                                                                                          ~                                            NBNCo
                                                                                                                                       y                        EXISTING TREES TO 25m ITYPI                                                          Limited

                                                                                                                                             \_ /,
                                                                                                                                                                                                                     Client:
   PROPOSED NBN UNDERGROUND
   SUBMAIN IN HDPVC ELECTRICAL                                                        LOT 2                                                       L~NDARY
   CONDUIT (APPROX.250m LONG)
                                                                                     RP126723
                                                                                                                                               v-.                                                                                             :II
                                                                                                                                                                                                                                               ;iii
                                                -NUE
                                                       -NUt                                                                                                                                                                         ERICSSON
   EXISTING 4WD ACCESS 1.75km

                                                      -
                                                       -                                                                                                                                                             Client:




                                                                                                                                                                    (’"
                                                                                                                                                                    ~
                                                                                                                                                                      (’f\
                                                                                                                                                                          1-
                                                                                                                                                               \          ~
                                                  -
                                                   -                                                                                        PROPOSED GRAVEL OVER NBN         -:g
                                                                                                                                            COMPOUND                           ~
                                                                                                                                                                                                                      Project

                                                                                                                                            PROPOSED NBN 2.4m HIGH CHAINWIRE SECURITY
                                                                                                                        I _______                                                                                    NATIONAL BROADBAND
                                                                                                                        ~         FENCE WITH 3.0m WIDE ACCESS GATE
                                                                                                                    ’"                                                                                                                     NETWORK
                                                                                                                                            PROPOSED NBN POWER                                                       SITE No: 4POM-51-35-BRP
  PROPOSED NBN 30m MONOPOLE WITH
                                                                                                                                            DISTRIBUTION BOARD/METER PANEL
   CIRCULAR HEADFRAME                                                                                                                                                                                                     SOREEN POINT
                                                                                                                                            ON PLATFORM HANDRAIL

                                                                                                                                            PROPOSED NBN OUTDOOR CABINET
                                                                                                                                                                                   \                                       153 LAKE FLAT ROAD,
  PROPOSED NBN 2x LLPX411F-6- V1 PANEL                                                                                                                                                                                              BOREEN POINT,
                                                                                                                                            SSC-02 (FUTURE LOCATION)
  ANTENNAS WITH NBN REMOTE RADIO UNITS TO                                                                                                                                                                                                      OLD 4565
  BE FIXED BELOW THE PANEL ANTENNA
                                                                                                                                            FINAL ELECTRICAL CIRCUITS IN CONDUITS.     \_                                            PRELIMINARY
                                                                                                                                            INST ALL AS PER AS/NZS 3000


                                                                                                                                            PROPOSED NBN OUTDOOR CABINET SSC-02
                                                                                                                                                                                        \
  PROPOSED NBN MONOPOLE FOOTING
                                                                                                                         I-I                ON ELEVATED STEEL PLATFORM
  INDICATIVE ONLY.                                                                                                               -I
                                                                                                                                        -I-I
                                                                                                                                                        -1-                                                          02        22.01.13   TX & RF REVISED
  PROPOSED NBN GPS UNIT (1-0FF)                                                                                                                                                                                      01        14.01.1J   PRELIMINARY ISSUE
                                                                                                                                            EXISTING FENCE                                                           Rev        Date      Revision Detals



  PROPOSED NBN 300 WIDE CABLE LADDER
  WITH 1-0FF CABLE LADDER SUPPORT POST                                                                         LOT 31
                                                                                                                                                                                                         \
                                                                                                              SP149578                                                                                                             urecon
                                                                                                                                                                                                                     Aurecon Australia Ply LId           ABN 54 005 139 873



                                                                                                DETAIL

      LEGEND
                                                                                                SCALE 1:100
                                                                                                                                                                  \__              EXISTING TREES
                                                                                                                                                                                                                      DESIGNER:

                                                                                                                                                                                                                      CHECKED:
                                                                                                                                                                                                                                                            MR

                                                                                                                                                                                                                                                            JR
                                                                                                                              NOTE:                                                                                   APPROVED:                             JI
      -
           HUE   -
                    HUE   -
                                NBN UNDERGROUND ELECTRICAL LINES
                                                                                                                                                                                                                      Drawing TIlle:
                                                                                                                              THE NBN CONSUMERS MAIN ROUTE SHOWN ON THE DRAWINGS IS INDICATIVE
      -
            ec   -
                     ec   -
                                FINAL ELECTRICAL CIRCUITS IN 2xSO           HDPVC
                                                                                                                                                                                                                      SITE SETOUT
                                                                                                                              ONL Y. ELECTRICAL CONTRACTOR TO DETERMINE EXACT ROUTE. ELECTRICAL
                                UNDERGROUND ELECTRICAL CONDUIT
                                                                                                                              CONTRACTOR TO LOCATE AND IDENTIFY EXISTING U/G SERVICES PRIOR TO                        PLAN
      -
            /   -
                      /   -
                                NBN COMPOUND FENCE                                                                            COMMENCEMENT OF WORK.

                                                                                                                                                                                                                      Drawing No.
                                PROPERTY BOUNDARY
                                                                                                                                                                                                                      4POM-51-35-BRP-C3 02
COPYRIGHT@NBNCoLlMITED ABN 86136 533 741.ALL RIGHTS RESERVED. VERSION 10 SEPT 2011
                                                                        -
                                                                                                                                                                                            20        10         0        10              20         30          40
                                                                                                                                                                                             l’I!.I,,!,IIIIII!!,,1         I               I         I           I

Page 67

                                                                                                                                                                                             Client:




                                                                                                                                                                                               NBNCo
                                                                                                                                                                                                                          Limited
                                                                                                                                                                                             Client:




                                                                                                                                                                                                                   :=;
                                                                                                                                                                                                                   ;iii
                                                                          EL 30,Om                                                            EL 30,Om
                                                                      y                                                                  y                                                               ERICSSON
                                                                          TOP OF MONOPOLE                                                     ClL 2x 1180H PROPOSED NBN PANEL ANTENNAS
                                                                                                                                                  2x SOOH REMOTE RADIO UNITS MOUNTED
                                                                          EL 28,Om
                                                                      y                                                                           BELOW ANTENNAS
                                                                          ClL 1x PROPOSED NBN CANISTER                           ~
                                                                                                                                                                                              Client:
                                                                                                                                  ~
                                                                                                                                              ClL 1x    300 PROPOSED NBN PARABOLIC ANTENNA
                                                                          EL 25.0m (APPROX)
                                                                      y                                                                            IT   BOREEN POINT NORTH)
                                                                          EXISTING TREES (BEHIND)




                                                                          PROPOSED NBN FEEDER CABLES TO BE
                                                                                                                                 D
                                                                          RUN VERTICALLY INSIDE MONOPOLE


                                                                                                                                              PROPOSED NBN GPS UNIT (1-0FF)
                                                                                                                                                                                              Project:
                                                                          PROPOSED NBN 30m MONOPOLE
                                                                          WITH CIRCULAR HEADFRAME                                                                                            NATIONAL BROADBAND
                                                                                                                                              PROPOSED NBN 300 WIDE CABLE LADDER
                                                                                                                                              WITH 1-0FF CABLE LADDER SUPPORT POST                             NETWORK
                                                                                                                                                                                             SITE No: 4POM-51-35-BRP
                                                                                                                                              PROPOSED NBN OUTDOOR CABINET                        SOREEN POINT
                                                                                                                                              SSC-02 ON ELEVA TED STEEL GRILLAGE
                                                                                                                                                                                                   153 LAKE FLAT ROAD,
                                                                                                                                                                                                         BOREEN POINT,
                                                                                                                                              v


                                                                                                                                              PROPOSED NBN OUTDOOR CABINET                                        QLD 4565
                                                                                                                                              SSC-02 (FUTURE LOCATION)
                                                                                                                                     c:::,.
                                                                                                                                              ,                                                          PRELIMINARY
                                                                                                                                              PROPOSED NBN POWER DISTRIBUTION

                                                                          PROPOSED NBN 2,4m HIGH CHAINWIRE                                    BOARD/METER PANEL ON PLATFORM HANDRAIL
                                                                                                                                                       "J
                                                                          FENCE WITH 3,Om WIDE ACCESS GATE                                        oD f6

                                                                                                                                              EXISTING STOCK FENCE
                                                                          EXISTING STOCK FENCE                                                                                               02    now        lX ~ RF REVISED




                                                                                                                                                        \\I
                                                                                                                                              EL 1.50m (TBC)
                                                                                                                                                                                             01

                                                                                                                                                                                             Rev
                                                                                                                                                                                                   14.01.13
                                                                                                                                                                                                   Dale
                                                                                                                                                                                                              PRELIMINARY ISSUE

                                                                                                                                                                                                              Revision Delais




                                                                                                                                         y                                                   .                .




                                                                     y
                                                                          EL O,Om
                                                                                                                                                                                             aurecon
                                                                          GROUND LEVEL                                                                                                       Aurecon Australia Pty Ltd     ABN 54 005 139873

                                                                          PROPOSED NBN MONOPOLE FOOTING
                                                                          (INDICATIVE)
                                                                                                                                                                                              DESIGNER:                         MR
                                                                                                                                                                                              CHECKED:                          JR

                                                                                                                                                                                              APPROVED:                         JI
                                                                                                             SOUTH ELEV A TION                                                                Drawing TlIIe:

                                                                                                                  SCALE 1:200                                                                 SITE ELEVATION
                                                                                                                                                                                              AND DETAILS

                                                                                                                                                                                              Drawing No.                                 Revision


                                                                                                                                                                                              4POM-51-35-BRP-C4 02
COPYRIGHT@NBNCoLlMITED ABN 86136 533 741.ALL RIGHTS RESERVED. VERSION 10- SEPT 2011                                                                                                                           20        30           40    SOmm      A3

Page 68

Appendix 4
Code Table Assessment
Compliance with the Boreen Point, Kin Kin & Cootharaba Locality Code
                -
                      _               -_                                ~   v    _


                                                           ._                                                 ~_)"..
                                                                        .
                                                                    ,


                                                  (   ,

                                                      i\    \   l




4.9 Effects of use


Amenity                            No solution provided.                        01   -
                                                                                      Complies.
01 Uses are located,                                                            The   proposed development will
designed and operated to                                                        not result in any impacts to
avoid significant adverse                                                       lighting, air quality, noise or
changes to the light, air                                                       accessibility conditions within the
quality, noise, accessibility or                                                surrounding area.
other conditions enjoyed by
users of associated, adjoining                                                  Furthermore, potential visual and
or nearby uses.                                                                 amenity   impacts have      been
                                                                                considered      through       the
                                                                                comprehensive    site   selection
                                                                                process. An appropriate site has
                                                                                been     identified which       is able to
                                                                                meet       the       target      coverage
                                                                                objectives, as well as minimising
                                                                                visual impacts to the surrounding
                                                                                area associated with the proposed

                                                                                development.

                                                                                The   subject site is considered
                                                                                appropriately located given its
                                                                                adequate separation distance from
                                                                                community sensitive land uses.
                                                                                Within a 500m radius of the facility
                                                                                there is only three (3) existing
                                                                                residential  dwellings, with the
                                                                                remainder of the surrounding area
                                                                                characterised by large farming
                                                                                properties,   heavily   vegetated
                                                                                hinterland areas and large rural-
                                                                                residential   allotments        which   are

                                                                                well removed from the subject site.


                                                                                The presence of large areas of
                                                                                mature vegetation within on the
                                                                                property         and      within        the
                                                                                surrounding area, particularly to
                                                                                the north, south and east, will act
                                                                                to   mitigate potential visual
                                                                                impacts and help to provide
                                                                                screening to the surrounding
                                                                                residential        dwellings,      Boreen
                                                                                Point    Village    and   scenic vistas
                                                                                such as Lake Cootharaba.


                                                                                For these reasons, the subject site
                                                                                is considered       appropriate for the

Page 69

                                                                 establishment               of        a        new

                                                                 telecommunications’              facility and
                                                                 will       result    in    minimal     amenity
                                                                 impacts.

Major Road Network              No solution provided.            02     -
                                                                            Complies.
02The function of, and visual                                    The  subject site is not located
amenity and character                                            adjacent to a Major Road Network.
surrounding, the majorroad                                       However the proposed facility is
network, including Pomona-                                       located adjacent’to Lake Flat Road
Kin Kin-Wo,lvi Road,                                             to the east. Views towards the
Cootharaba Road, Dr Pages                                        facility from this road corridor are
Road and Sister Tree Creek                                       considered to be limited given the
Road is protected and                                            extent of matur vegetation which
enhanced.                                                        exists    along the eastern lot
                                                                 boundary of the property. At 30 m
                                                                 in height, the majority of the
                                                                 proposed facility will be screened
                                                                 from view by this vegetation.
                                                                 Additionally, views from passing
                                                                 motorists           will    be     of      limited
                                                                 duration.           The    facility       is   well
                                                                 removed         from       other      significant
                                                                 transport routes.

                                                                 Therefore the proposal                complies
                                                                 with 02.

4.10 Built Fonn


Density                         53.1 For the Village Mix         03     -   Not applicable.
03The density of                Zone-residential density does The      proposed facility is not a
development within the site     not exceed a rate of 1 dwellng   residential development. and is
area-                           unit per non-residential use.    also not located within the Village
                                                                                       .




a) is compatible with                                            Mix Zone.
surrounding development;
b) has a low site impact to                                      However,        the    development
enhance the opportunity to                                       footprint comprising an area of 80
maintain natural site                                            m,2    is   relatively minor     and
characteristics, including                                       consistent with the scale of existing
native vegetation and natural                                    infrastructure in the surrounding
landforms.                                                       area (e.g. power stanchions and

                                                                 light poles).

                                                                 The slimiine monopole design    (as
                                                                 opposed to a lattice type structure)
                                                                 will reduce the visual dominance
                                                                 the structure when viewed from a
                                                                 distan e      including     adjacent
                                                                 properties,    roads    and
                                                                 surrounding areas. Additionally, the
                                                                 facility may be colour matched to
                                                                 its surroundings (at the request of
                                                                 council) to further reduce its visual
                                                                 appearance.


                                                                 Existing vegetation on site will be
                                                                 retained and used to help screen
                                                                 the proposed facility.

Page 70

Height                            S4.1 Buildings and other        04   -
                                                                           Complies.
04 Buildings and other            structures have a maximum       The       proposed development           is
structures-                       building height of-             located within the Rural Zone and
a) are low rise and present a     a) if in the Rural or Rural     comprises a monopole structure of
building height consistent with Settlement                        30 m in height and therefore does
structures on adjoining and     Zone-8m, or 9m where the          not comply with the maximum
surrounding premises;           pitched                           building height specified in S4.1
b) have a maximum building      roof but no other part of the     (a). However the use is considered
height of 2 storeys;            building or structure exceeds     to    be  compatible     with  the
c) do not visually dominate the 8m; or                            surrounding area and          thus
street, surrounding spaces or   b) if in the Industry Zone-10m    complies with 04 for the following
the existing skyline;           c) in all other zones- 8m.        reasons:

d) preserve the amenity of                                         .       the   development     has been
surrounding premises                                                       located within an area which
including privacy, views and                                               generally comprises of low
access to sunlight;                                                        density        rural-residential
e) respect the scale of the                                                development and is well
surrounding vegetation; and                                                removed from neighbouring
f) respond to the topography                                               residential   dwellings and
of the site and minimises                                                  Boreen Point Village;
                                                                   .
                                                                           existing infrastructure uses in
                                                                           the area (such as powerlines
                                                                           and poles) will ensure the
                                                                           facility is of a scale and
                                                                           height consistent with the
                                                                           surrounding environment;
                                                                   .
                                                                           existing vegetation within the
                                                                           property    and      the     wider
                                                                           surrounding   area   will   screen

                                                                           the lower margins of the
                                                                        facility; and
                                                                   .    the proposed height is the
                                                                        minimum required to achieve
                                                                        the       required  coverage
                                                                        objectives.
                                                                  (refer to Section 8.1 for additional
                                                                  visual assessment)


                                                                  For these reasons, the          height of
                                                                  the facility is considered to comply
                                                                  with 04.

Setbacks                          S5.1 Buildings and structures   05   -
                                                                           Complies.
05 Buildings and other            comply with the setbacks        Table 1.1       of Schedule 1 of the
structures are appropriately      identified in Schedule 1-       Noosa       Plan    2009   specifies     a

designed and sited to-            Minimum Boundary Setbacks.      minimum         frontage      and      side
a) provide amenity for users of                                   setback in the Rural Zone of 10m.
the premises, as well as
preserve the visual and                                           The proposed facility is setback
acoustic privacy of adjoining                                     approximately 400m from the
and nearby land uses;                                             western    lot   boundary     and
b) preserve existing                                              approximately   1 km   from    the
vegetation that will buffer                                       northern frontage to Lake Flat
the proposed building from                                        Road which is compliant with S5.1.
adjoining uses;                                                   The proposed facility is sited on
c) allow for landscaping to be                                    the southern boundary and located
provided between buildings;                                       approximately 6m away from the
d) maintain the visual                                            eastern boundary which is not

Page 71

continuity and pattern of                                         consistent with S5.1. However, the
buildings and landscape                                           location of the facility has been
elements within the street; and                                   selected in an attempt to minimise
e) help protect the natural                                       visual and amenity impacts, whilst
character and visual menity                                       also   avoiding  the    loss   or

of the Noosa River system.                                        fragmentation of productive rural
                                                                  land. Therefore in this instance the
                                                                  reduced  boundary setbacks are
                                                                  considered  appropriate. These
                                                                  setbacks are also compliant with
                                                                  05 as the location will maintain the
                                                                  visual amenity for those travelling
                                                                  along the Lake Fl t Road and the
                                                                  residential   dwellirigs to the south
                                                                  west.


                                                                  The   proposed facility is also
                                                                  compliant with 05 as it is:
                                                                  . well removed from community


                                                                      sensitive locations, significant
                                                                      areas of mature vegetation

                                                                        exist   on   site and within the
                                                                        surrounding area whiqh will
                                                                        help to mitigate potential
                                                                        visual impacts associated with
                                                                        the development,
                                                                  .     is consistent with the visual
                                                                        continuity of the surrounding
                                                                        area as it has been co-located

                                                                        with    existing   infrastructure
                                                                        qses in the area (such as
                                                                        power stanchions and light
                                                                        poles)
                                                                  .     no  landscaping or vegetation
                                                                        removal is proposed as part
                                                                        of this development and will
                                                                        not impact on the Noosa
                                                                        River system

Site cover                                No solution provided.   06~ Not Applicable.
06 The site cover of buildings                                    The    proposed facility is not a
and other roofed structures-                                      building    or    roofed    structure.
a) is of a .scale that is                                         However,        the     development
compatible with surrounding                                       footprint comprising an area of 80
development;                                                      m2     is   relatively   minor    and
b)for a class 1 or cI.as$ 10a                                     consistent with the scale of existing
structure with the Detached                                       infrastructure in the surrounding
Housing Zone, does not                                            area (e.g. power stanchions arid

exceed-                                                           light poles).
   i.    for a single storey
         building   -
                        50%; or                                   The slimline monopole design (as
  ii.    for a building of 2 or                                   opposed to a lattice type structure)
         more storeys       -
                                50%   .



                                                                  will reduce the visual dominance of
         on the   ground floor                                    the structure when viewed from a
         and 30% for the upper:                                   distance     including     adjacent
         storey(s), or 40% for                                    properties,   roads    and    other
         all storeys for a                                        surrounding areas. Additionally, the
         building of 2 or more                                    facility may be colour matched to

Page 72

                ..,--                          ~   .. -   -
                                                              -~"’
                                                              ,      ,"   ~




          storeys;                                                        its surroundings (at the request of
c)for other classes within the                                            council) to further reduce its visual
Detached Housing Zone         -

                                                                          appearance.
40%;
d) does not present an                                                    Existing vegetation on site will be
appearance of bulk to                                                     retained and used to help screen
adjacent properties, roads or                                             the proposed facility (refer to
other areas in the vicinity of                                            Section     8.1 for additional visual
the site;                                                                 assessment).
e)maximises the retention of
existing vegetation and allows                                            Therefore       the         proposal         is
for additional soft landscaping                                           consistent with 06.
between buildings;
f) allows for adequate area at
ground level for outdoor
recreation, entertainment,
clothes drying and other site
facilities; and
g)facilitates onsite stormwater
management and vehicular
access.


Flooding and drainage           S7.1 For new buildings or                 57.1 Not Applicable.
07Buildings and other works     structures or additions of more           The       development          is    not    for
are designed and sited to-      than 50m2gross floor area to              habitable use
a) provide flood free access to an existing building or
premises and flood free         structure, floor levels for               57.2 Not Applicable.
habitable areas;                    habitable rooms are-                  No       Council      Infrastructure         is
b) allow only minor, short term     a)for areas where minimum             available for use.
and infrequent flooding of non- floor levels are available-not
habitable areas;                    less than the specified level;        57.3 Not Applicable.
c) ensure carparking areas          b) for areas where flood              No car parking is proposed as part
can be adequately drained;          modelling is                          of this development.
d) ensure drainage does not         available-a minimum of
adversely impact upon other         500mm                                 57.4 Not Applicable.
premises; and                       above the modelled flood level; No basements                are    proposed       as

e) ensure filling or excavation     and                                   part of this development.
does not adversely impact           c)for areas where flood
upon other premises by-             modelling is not available, a         57.5 Not Applicable.
   i.   causing ponding of          minimum of 500mm above the            No basements          are    proposed       as

            water on the site or    highest known flood level;            part of this development.
            nearby land;
   ii.      increasing flooding,    AND                                   07   -
                                                                                   Complies.
            which adversely                                               The proposed facility is located on
            affects the safety or   S7.2 Where Council                    the Natural Hazard: Landslide &
            use of any land         infrastructure is                     Flooding Overlay      -
                                                                                                    as   containing a
            upstream and            available-                            ’Flood     Hazard     Area’         and    land
            downstream; and         a) any drainage (from buildings ’Subject to minimum floor height’.
  iii.      adversely affecting     and land)flows to that          (Refer to figure 6.6). However, the
            the flow of water in    infrastructure; and             proposed       Telecommunications
            any overland flow       b) the infrastructure has the   Facility is not for a habitable use
            path.                   capacity to accept any          and has been sited and designed
                                    additional loading;             to     minimlse     the     hazards
                                                                    associated with flooding.
                                    AND
                                                                          Notwithstanding              this           the
                                    S7.3 Car parking and                  foundations and earthworks are to
                                    maneuvering areas are                 follow       engineering              design
                                    constructed at a level that           standards          and          stormwater

Page 73

                                  permits the parking area to       dissipation is provided through the
                                  drain from the site by gravity    proposed gravel compound finish.
                                  means, without the need for       The proposed facility will include
                                  mechanical                        an elevated steel grillage to raise

                                  pumping; or                       the   equipment shelters. Any
                                                                    discharge points will not affect
                                  S7.4 Basements for residential    downstream,          upstream      or

                                  uses have flood   immunity        underground streams        on     any
                                  above the Q100 where              adjoining properties.
                                  alternative means to
                                  mechanical pumping are used
                                  to achieve such immunity; or


                                  S7.5 Basements for non-
                                  residential uses have flood
                                  immunity above the Q100 that
                                  may be achieved by means of
                                  mechanical pumping where the
                                  mechanical feature is
                                  installed with adequate holding
                                  tanks and an alternative back
                                  up power source.


Sense of arrival to Kin Kin       No solution provided.             08   -   Not Applicable.
08 Uses, buildings, structures                                      The proposed facility is not located
and other works do not have                                         within the township of Kin Kin.
an adverse effect on the visual

amenity of the entry points to
Kin Kin village, including the
sense of arrival to the village

provided by-
a)the rural landscape
immediately prior to the
township;.
b) the avenue of pine trees
along Pomona-Kin Kin Road;
c)the Main Street/Pomona-
Kin Kin Road junction; and
d) Sister Tree Creek Road.
Visual amenity in Boreen          No solution provided.             09   -
                                                                             Complies.
Point village
                                                                    The subject site is located outside
09 Uses, buildings, structures
                                                                    of open space corridors and the
and other works do not have
                                                                    specific location of the facility is
an adverse   impact upon-
                                                                    not     within    existing     native
a)views to Lake Cootharaba
and beyond from roads and
                                                                    vegetation as outlined on Map 4
                                                                    Open         Space         Networks.
public open spaces; and
                                                                    Additionally the subject site is not
b) the visual amenity from                                          located on the. Heritage Overlay as
Louis Bazzo Drive, including
the sense of arrival in the
                                                                    being located within proximity to
                                                                    any heritage sites or character
village provided by-
                                                                    areas.
the rural landscape
immediately prior to the
                                                                    The proposed facility has been
village; and the vegetation on
lots at the western end of
                                                                    appropriately located to minimise
                                                                    visual and amenity impacts to
Laguna Street;
                                                                    residential dwellings, Boreen Point
                                                                    Village and scenic vistas within the

Page 74

,   "       -"   -   .                                    ~    -        v
                                                                                 ’’’’’’1’




        -                -                                                          ,-...




                     wider area by:
                     .       The         corridor             of     mature
                             vegetation which separates
                             the facility from the edge of
                             the lake in conjunction with
                             the       200m              setback              will
                             mitigate              potential            visual
                             impacts           from           recreational
                             users of Lake Cootharaba.

                     .       Although              the
                                              facility has
                             been sited adjacent to Lake
                             Flat Road (not identified as a
                             Major Road Network on the
                             Noosa Plan Strategy Map) a
                             sense        of       arrival         into       the
                             Boreen Point village will be
                             maintained as the facility will
                             only      become             intermittently
                             visible       at        a        few           minor
                             clearings         in    the       vegetation
                             aligning the                road.       These
                             views are not anticipated to
                             be visually obtrusive as Lake
                             Flat    Road           is    travelled              by
                             motor        vehicles            only          at     a

                             constant speed and does not
                             provide any opportunities for
                             vehicles                to             become
                             stationary        .




                     .   At    30 m      in height, the
                         majority of the proposed
                         facility will be screened from
                         view by this vegetation, of
                         which the tallest tree is 25 m.
                     .       Visual impacts will be further
                             mitigated by the slimline
                             monopole design and be
                             colour        matched                 to         the
                         surroundings (if requested
                         by Council).
                     .   The    proposed facility has
                         been appropriately sited on
                         the periphery of the township
                         (approximately 1 km) which
                         will essentially help mitigate
                             any views from Louis Bazzo
                             Drive.
                     .       It     is     also               located              an

                         appropriate                     setback             from
                         community                   sensitive                   land
                             uses and          residential dwellings
                         (setback              more           than          240m
                         from            the       closest         and           only
                         three (3) residential dwellings
                         within a 500m radius).
                     .   The             proposed              facility           is
                         setback               over           1 km          from
                             public       open        spaces within

Page 75

                                                                                the wider area, specifically 1
                                                                                km from the Boreen            Point
                                                                                Sorts and Recreational Park
                                                                                and Centre and 1.2 km from
                                                                                Boreen Point Campground

                                                                          (refer to Section 8.1 for additional
                                                                          visual’ assessment)

010 Uses, buildings,                                                      010    -
                                                                                  Complies.
structures and other works                                                The    proposed facility will be
are   designed and sited to                                               approximately 5m above the
maintain the visual                                                       existing tree canopy where the
dominance of the tree canopy                                              tallest tree is approximately 25 m
and other natural features                                                high.     The    proposed    height
along the water’s edge of                                                 however is essential to allow the
Lake Cootharaba;                                                          panel antennas to have clear line
                                                                          of sight above the tree canopy to
                                                                          the surrounding premises (radio
                                                                          coverage), and also ensure that
                                                                          the radio transmission           dish    has
                                                                          clear line of sight to the adjoining
                                                                          network      facility to link    the sites
                                                                          back into the broader network.

011 Uses, buildings,                                                      011    -   Not applicable.
structures and other works on                                             The proposed facility is not located
Boreen Parade and Urunga                                                  adjacent to Boreen              Parade    or

Parade maintain or improve                                                Urunga Parade.
the visual amenity of this
esplanade.
Materials and finishes           512.1 Buildings and structures           012    -
                                                                                     Complies.
012 Buildings and other          incorporate a mix of textured            NBN Co proposes to construct a
structures use materials and     external building materials,             new Telecommunication Facility
finishes that complement the     such as timber cladding and              consisting of a 30 metre slim line
rural heritage character and     corrugated iron roofs.                   mon_opole with three (3) panel
integrate with the surrounding                                            antennas (1180mm x 300mm x
natural landscape.                                                        115mm) which will be mounted to
                                                                          a     circular     headfr   me      at    a
                                                       .   ....




                                                   .   ..
                                                                  .   .   centreline elevation of 30 metres.
                                                                          Additionally one (1)parabolic dish
                                                                          antenna is proposed. Two (2)
                                                                          outdoor      cabinets founded       on    a

                                                                          concrete slab at the base of the
                                                                          monopole are also proposed.

                                                                          The    monopole was selected for
                                                                          the   proposal due to its slim line
                                                                          appearance and minimal visual
                                                                          obtrusiveness when viewed from a
                                                                          distance.


                                                                          The   monopole design is deemed
                                                                          to    be more appropriate than a

                                                                          lattice tower as it can be painted

                                                                          a colour (At Council’s request) that

                                                                          will provide for visual integration
                                                                          and camouflage the facility with
                                                                          the surrounding landscape and

Page 76

               .-       .   v   <
                                                                                                                  , (~




     -   ...   ~    -                                                                                           . -~,   -




                                                                        vegetation
Roof form                           513.1 With the exception of         013 Not applicable.
                                                                               -




013 Roof forms-                     industrial                          The    proposed development does
a) contribute positively to the     buildings the main roof of the      not involve a building.
local skyline;                      building has a roof pitch no
b) complement the low rise          less than 12 degrees and has
character of the locality;          minimum 600mm eaves to at
c) use simple traditional roof      least 75% of
designs, such as hipped,            the perimeter of the building;
gabled and skill ion; and
d) do not create opportunities      AND
for residents to overlook the
private open space areas of         513.2 Building and structures
neighbouring properties.            do not include rooftop terraces.

510ping sites                       514.1 Buildings are of split        014    -   Not applicable.
014 On sloping sites,               level design that step down the The        proposed facility will be
buildings and structures are        slope   or have   suspended floor   developed on flat land for which
designed to maximise the use        construction; (See Figure 4-1       minimal earthworks are required
of natural slope and minimise       below)                              (refer    to   compliance     with
the need for cut and fill.                                              Earthworks Code at Section 7.2.3).
                                    AND


                                    514.2 Cut or fill is less than 2m
                                    in depth relative to natural
                                    ground surface;

                                    AND


                                    514.3 The distance between
                                    the ground and the lowest part
                                    of the floor of the building does
                                    not exceed 3m to avoid large
                                    under building areas.


                                    Figure 8.1-Design for
                                    sloping sites (suspended
                                    floor)
                                    I
                                                 _,,;:-~.


                                    (7(r.r~-:.~’~
                                    ;  ;;:’~,--1f
                                        , ..




4.11 Environment, Conservation and Recreation


Environment & cultural              No solution provided.               015    -
                                                                                   Complies.
heritage values                                                         The        proposal is          appropriately
015 There are no significant                                            located within          a   low density rural
adverse effects on                                                      area       used   for
                                                                                       farming purposes
the biodiversity, natural                                               and    will   require vegetation
                                                                                       not
vegetation, native wildlife,                                            removal. The proposed facility has
habitats, landscape quality,                                            been       located      outside    of   areas

water quality or cultural                                               mapped as ’Riparian Buffer Area’,
heritage values, including                                              ’Koala         Habitat          Area’     and
those related to-                                                       ’Environmental                 Enhancement
a) changes to natural                                                   Area’ on the Biodiversity Overlay.

Page 77

drainage;                         In addition       the   proposed facility
b) disturbance to any of the      has       been          setback            from
wetland systems;                  environmentally sensitive areas
c) management of landslide        (e.g. 400m away from identified
and fire risk;                    Remnant Vegetation and 200m
d) erosion and the transport of   from     the    edge    of   Lake
sediments off site;               Cootharaba) to avoid areas of
e) unmanaged public access;       significant natural resources and
f) effluent disposal              minimise potential environmental
g) changes to fauna habitat       impacts associated      with   the
and behaviour; and                development.
h) disturbance of buildings
and features, including natural   The     proposed        facility    will    be
features, of cultural heritage    located     away         from           wetland
significance.                     systems and will unlikely impact on
                                  the    natural     drainage        or    cause

                                  erosion of the land. Furthermore,
                                  the foundations and             earthworks
                                  are    to follow    engineering. design
                                  standards          and         stormwater
                                  dissipation is provided through the
                                  proposed gravel compound finish.
                                  In  addition  no  buildings are
                                  proposed          and           a

                      ..

                   ....
                                  Telecommunication Facility is not
                                  a     habitable    use,    therefore         no

                                  effluent run off will occur.


                                  The proposed facility will also have
                                  restrictions aimed at preventing
                                  public access, including a secured
                                  compound fence with a locked
                                  gate and warning signs placed
                                  around the facility.


                                  Disturbance        of   cultural    heritage
                                  will not occur as the subject site is
                                  not   located  on   the  Heritage
                                  Overlay as being located within
                                  proximity to any heritage sites or
                                  character areas.


                                  Therefore the proposal is
                                  consistent with 015.

Page 78

  ~~   I,’      ~   ~
                                                                                                             ~-
                                                             ~~",.,                          ,,,-

                                        ~~~I""’:’~ -~.,..-


       .                                .   .




Noosa Trail Network             No solution provided.                           016 and 017         -
                                                                                                        Not applicable.
016A comprehensive                                                              The subject site is not identified on
network of bridle trails and                                                    the Noosa Trail Network Map as
pedestrian and bicycle                                                          being located adjacent or within
linkages is established,                                                        proximity to a current or future
enhanced and protected                                                          identified trail network.
incorporating road reserves,
State forests, Council owned
land and private lands
consistent with the lifestyle
and outdoor recreation needs
of Noosa’s residents and
visitors;

AND


017 Existing and future         S17.1 Development includes
pedestrian, bridle trail        linkages to or between existing
and bicycle linkages are        or future   components of the
retained as part of an          Noosa Trail Network, as
expansive trail network.        indicated in Schedule 5               -


                                                                          Map
                                3;

                                AND


                                S17.2 Development does not
                                have an adverse impact on the
                                access functions of the Noosa

                                Trail Network, including
                                severing of existing or future
                                linkages; or

                                S17.3 Alternative linkages to
                                those indicated in Schedule 5               -




                                Map 3 are provided;
                                AND


                                S17.4 Linkages to the Noosa
                                Trails Network are designed
                                and constructed in accordance
                                with-
                                a) Australian Standard 2156.1
                                Walking Tracks Part 1:
                                Classification and Signage to a
                                minimum of a Class 4
                                Standard; and
                                b) Australian Standard 2156.2
                                Walking Tracks Part 2:
                                Infrastructure Design.

Open space network                                                              018   -
                                                                                          Not applicable.
018An integrated open space                                                     The subject site is located outside
network is established,                                                         of open space corridors and the
enhanced and protected                                                          specific location of the facility is
throughout the locality to-                                                     not     within    existing     native
a) provide for both passive                                                     vegetation   as outlined  on  Map 4
and active recreational                                                         Open         Space         Networks.
pursuits;                                                                       Additionally the subject site is not
b) provide connectivity for                                                     located on the Heritage Overlay as

Page 79

                         pedestrians, cyclists, and                                     being located within proximity to
                         horse riders;                                                  any heritage sites or character
                         c) provide habitat connectivity                                areas. Additionally  the subject
                         for wildlife;                                                  site       is   not      identified   on
                                                                                                                              .

                                                                                                                                        the
                         d) protect watercourses and                                    Pathways           and      Trunk     Network
                         drainage lines;                                                Infrastructure   Map     as    being
                         e) protect vegetation on steep                                 located         within
                                                                                                          proximity of any
                         slopes; and                                                    pathways         or       bikepaths.
                         f)form a scenic backdrop for                                   Notwithstanding this the proposed
                         residential development.                                       facility will be setback behind
                                                                                        mature     vegetation which will
                                                                                        screen and separate the facility

                                                                                        from Lake Cootharaba, Lake Flat
                                                                                        Road     and    nearby residential
                                                                                        dwellings.




 ...




                         063The following defined          No solution provided         063        -     Not     applicable
                         uses and use classes are                                       comment below).                                       .   .




                         consistent uses and are
                                                                                                                                                        ..



                                                                                                                                                        _.



....

                         located in the Rural Zone-                                                                                                     ...




.   ..




                         a) All Agricultural Uses;
                         b) Commercial business
                                                                                                                 ....



                                                                                                                  ...



                                                                                                                   ..



                                                                                                                   ..




                         Type 3;
                         c) Home-based business;
                         d) Industrial business Type
                         3’
                          ,




     ..     -
                         e) Retail business Type 1 if a                     .   .   .




                         roadside stall;
                         f) Retail business Type 3;                                                                                           .   ...




                         g) Emergency service Type                                                                 ..




                         2-
                          ,
.   .0.                                                                                                                                                 -    -




    ..                   h) Open space Type 2;
                         i) Detached house;.
                         j) Community residence;
    .   -   .   -
                    ..



                    -
                         k) Ancillary dwelling unit;
                         I) Multiple housing Type 1;
                         and
                         m)Visitor accommodation
                         Types 1,2 or 3.
                         4.31 Inconsistent Uses


                         064 The following defined         No solution provided         064 Does not comply.
                                                                                               -




                         uses and use classes are                                       The        proposed         development          is
                         inconsistent uses and are not                                  identified as an Infrastructural
                         located in the Rural Zone-                                     -Type 3 ’Tower under the
                         a) Commercial business                                         Plan 2009 and is an i
                         Types 1 or2;                                                   use within the Rural Zone.

                         b) Entertainment and dining
                         business;                                                      However,          the     subject
                         c) Industrial business Type                                    considered               appropriate
                         1-
                          ,
                                                                                        accommodate              the    use       for
                         d) Retail business Type 1                                      following       reasons:

                         and a roadside stall   .
                                                                                        NBN Co have identified the need
                         e) Retail business Types 2,                                    for    a        new      telecomm unication

The text continues on page 80.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗