Development Application part 2 Report and Plans MCU13/0053

of 131

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (117 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
     3.0                SITE SELECTION
     Planning for a new fixed wireless broadband facility is a complex process. NBN                         Co
     conducts a rigorous multi-stage scoping process, as outlined below.


     3.1        Identification of areas requiring Fixed Wireless .coverage

     The NBN Co Fixed Wireless locations will be determined by a number of factors including
     the availability of both the NBN Co Fibre transit network and the availabi,lity of Point of
     Interconnect (POI)facilities to allow for the installation of NBN Co equipment. NBN Co
     uses a     number of methods to identify those parts of Australia.that require Fixed Wireless
     cqverage. When an are          is identified as requiring Fixed Wireless coverage,.investigations
     are undertaken to determine the measures required to provide this coverage.
                                                                                              .




     NBN Co has identified a requfrement to provide a fixed wireless facility in Boreen ’Point.
     The facility will provide Fixed Wireless coverage to dwellings in the Boreen Point area, in
     addition to serving as a key communications link for other N6N Fixed Wireless facilities in
     the wider Sunshine Coast region.


     3.2        Site Selection Param’eters

     NBN Co identifies an area where the requirement for a Fixed Wireless broadband. facility
     would      be   highest" a ’search area.’      .
                                                        A   preliminary investigation of the area    is then
     undertaken, in conjunction with            planning      and   prop’erty consultants;’ tadiofrequency
     engineers and designers in order to identify possible locations to establish.a facility.

     Generally, new sites must be located within, or immediately adjacent to, the identified
     search  area in order to be technically feasible. However, ’while the operational and

     geographical aspects of depl9ying new facilities are primary factors, there are also.’many
     other issues that influence network design, which have to be resolved in parallel.

     Some of the issues that are cOllsidered inch.lde:
           .    visual amenity

.
    :....: ’.
    ....   ..
                potential co-location opportunities                                      .




           . the availability qnd suitability of land as well as a willing site provider
                                                                              ~’-
                                                                                    .




           .    occCJpational health ~nd safety
           .    construction issues (including structural .and loading fe’asibility and           access    for
                                                ,




                maintenance purposes)
           .    topographical constraints affecting network line of site
           .    legislative policy constraints
           .    environmental impacts
           .    cost implications.


     The number, type and height of ’facilities required to comp.lete the Fixed Wireless network
     are   largely determined by the operational, geographical and other factors discussed
     above, which influence final network design. These compounding factors often severely
     restrict the available search area within which a facility can be established to provide
     relia,ble Fixed Wireless broadband to a local community.




     NBN-4NBZ-4POM-5135      -   Boreen Point                                                      Page 9
Log in to download the original file

Development Application part 2 Report and Plans MCU13_0053.pdf · 117 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.