Development Application part 2 Report and Plans MCU13/0053

of 131

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (117 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
The proposed facility comprises a 10m x 8 m lease area to be located in the southern
portion of the subject site. It is considered that the facility has been sited appropriately to
minimise detrimental environmental impacts. The location of the facility supports
compliance with the infrastructure code as follows:
      . The     proposed facility has been appropriately sited on the periphery of the
        township and located as far away from residential dwellings as possible while still
         being capable of providing service across the township;
      . The establishment of the monopole on the subject site will not affect the
         agricultural capabilities as it will occupy a relatively small lease area (80m2)of the
         total 106ha of land and is located on the periphery of the site outside the area of
         productive land;
      . the proposed facility is located a sufficient buffer distance from environmentally
         sensitive locations and no vegetation removal will be required; and
      . The proposal will have negligible impact on the environmental quality, ecological
         values or the nature in the region as it is located in a modified rural area


The proposed facility is for a 30 m monopole and associated infrastructure. It is considered
the facility has been located and designed  appropriately to minimise detrimental visual
impacts. Site location and design elements of the proposal that support visual compliance
with this Code are as follows:
     .   The proposed     development has been setback over 1 km from the Soreen Point
         Village;
     .   The facility has been located    on a   site surrounded   by heavily vegetated areas
         which will provide significant screening benefits from all areas of Soreen Point, but
         in particular the residential dwellings to the south east, Lake Cootharaba to the
         east, Lake Flat Road and the Soreen Point township; and
     .   The facility has been designed with the minimal required height and as a slim line
         monopole, which can be colour matched to the surrounding vegetation;

The facility has been      intentionally located within private land for which there is existing
access available. The site       access is considered to be appropriate given the NSN Co

facility will not be a significant generator of traffic and is not anticipated to adversely impact
on the surrounding road network or residential amenity. The proposed facility will also

have restrictions aimed at preventing public access, including a secured compound fence
with a locked gate and warning signs placed around the facility.


It is considered the proposed facility is not inconsistent with the character of the area as it
has been appropriately located in a rural area where similar infrastructure is located, such
as   powerlines, as they provide a necessary service.

For these reasons the proposal is considered to comply with the overall outcomes for the
Infrastructure Uses Code. Further compliance with the Specific Outcomes and Probable
Solutions of the Infrastructure Uses Code is included in           Appendix 4    -
                                                                                     Code Table
Assessment




7.2.3 Earthworks Code


The Overall Outcomes of the Earthworks Code are the following        -




     (a) To ensure that earthworks do not unreasonably impact on the natural environment
         or other properties with regard to -




        (i)     Land stability (including differential settlement or expansion in reactive
                soils);



NBN-4NBZ-4POM-5135    -
                          Boreen Point                                                 Page 40
Log in to download the original file

Development Application part 2 Report and Plans MCU13_0053.pdf · 117 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.