GENERAL SAFETY NOTES HAZARDOUS SUBSTANCES SAFETY HAZARDS
GS1 IT IS THE CLIENTS RESPONSIBILITY TO PROVIDE THIS 'SAFETY IN DESIGN REPORT' TO THE HS1 ASBESTOS SH1 FALLING OBJECTS
PRINCIPLE CONTRACTOR / BUILDER IN ACCORDANCE WITH THE WORK HEALTH AND FOR ALTERATIONS OR ADDITIONS TO AN EXISTING BUILDING: CONSTRUCTION, MAINTENANCE OR DEMOLITION WORK ON OR AROUND THIS BUILDING IS
SAFETY ACT 2011 AND REGULATIONS. BELOW LISTS POTENTIAL CONSTRUCTION HAZARDS CONSTRUCTED PRIOR TO 1990 - IT MAY CONTAIN ASBESTOS PRODUCTS. LIKELY TO INVOLVE PERSONS WORKING ABOVE GROUND LEVEL. WHERE THIS OCCURS
ASSOCIATED WITH IMPLEMENTING THE DESIGN AS DOCUMENTED. CONSTRUCTED PRIOR TO 1986 - IT IS LIKELY TO CONTAIN ASBESTOS PRODUCTS. ONE OR MORE OF THE FOLLOWING MEASURES MUST BE UNDERTAKEN TO AVOID
ASBESTOS MAY BE CONTAINED IN CLADDING MATERIALS OR IN INSULATING MATERIALS, OBJECTS FALLING FOR THE WORK AREAS ON TO AREAS BELOW.
GS2 IT IS THE CONTRACTORS RESPONSIBILITY TO BUILD IN ACCORDANCE WITH PROJECT THE CONTRACTOR MUST CHECK AND IF NECESSARY TAKE APPROPRIATE ACTION BEFORE • PREVENT OR RESTRICT ACCESS TO BELOW AREA AS SUITABLE
DOCUMENTATION AND NOT MAKE VARIATIONS TO THE CONSTRUCTION WITH SPECIFIC DEMOLISHING, CUTTING, SANDING, DRILLING OR OTHERWISE DISTURBING THE MATERIAL. • PROVIDE TOE BOARDS AND HOARDING TO SCAFFOLD OR OTHER WORK
WRITTEN APPROVAL. IF THESE DESIGN DRAWINGS ONLY DOCUMENT PART OF THE PLATFORMS.
PROJECT WORKS, THE CONTRACTOR IS TO ENSURE ALL DESIGN DRAWINGS ARE CO- HS2 POWDERED MATERIALS • PROVIDE PROTECTIVE STRUCTURES OVER THE WORK AREA BELOW
ORDINATED BETWEEN ALL CONSULTANTS. MANY MATERIALS USED IN THE CONSTRUCTION OF THIS BUILDING CAN CAUSE HARM IS • ENSURE ALL WORKERS HAVE SUITABLE PERSONAL PROTECTIVE EQUIPMENT
INHALED IN POWDER FORM. PERSONS WORKING ON OR IN THE BUILDING DURING (PPE)
GS3 THE DESIGN HAS BEEN DOCUMENTED IN ACCORDANCE WITH THE NATIONAL CONSTRUCTION, OPERATIONAL MAINTENANCE OR DEMOLITION SHOULD ENSURE GOOD
CONSTRUCTION CODE, RELEVANT AUSTRALIAN STANDARDS, LOCAL AUTHORITY VENTILATION AND WEAR PERSONAL PROTECTIVE EQUIPMENT TO ENSURE PROTECTION SH2 WORKING AT HEIGHTS
REGULATIONS AND STANDARD BUILDING CODES OF PRACTICE UNLESS OTHERWISE AGAINST INHALATION WHILE USING EITHER POWDERED PRODUCT OF WHEN SANDING, DURING CONSTRUCTION: WHEREVER POSSIBLE COMPONENTS FOR THIS BUILDING
NOTED. EACH STAGE OF CONSTRUCTION SHOULD BE STRUCTURALLY COMPLETE AND DRILLING, CUTTING OR OTHERWISE DISTURBING OR CREATING POWDERED MATERIAL. SHOULD BE PREFABRICATED OFF SITE OR AT GROUND LEVEL TO MINIMISE THE RISK OF
INSPECTED BEFORE PROCEEDING TO THE NEXT STAGE TO ENSURE DESIGN COMPLIANCE WORKERS FALLING MORE THAN TWO METERS. WHERE CONSTRUCTION WILL REQUIRE
BY THE CERTIFYING AUTHORITY. THE CONTRACTORIS TO ENSURE THE WORK HS3 VOLATILE ORGANIC COMPOUNDS WORKERS TO ACCESS HEIGHTS WHERE A FALL OF TWO METERS IS POSSIBLE, THE
PROGRAMMED IN A SAFE MANNER AND MUST HIGHLIGHT TO THE DESIGNER ANY ASPECTS MANY TYPES OF GLUE, SOLVENTS, SPRAY PACKS, PAINTS, PROTECTIVE COATINGS AND CONTRACTOR MUST PROVIDE A BARRIER OR SUITABLE SCAFFOLDING TO PREVENT
OF THE WORK THAT MAY REQUIRE FURTHER CLARIFICATION OR ADVICE WITH REGARD TO OR CLEANING PRODUCTS AND DISINFECTANTS CAN HAVE DANGEROUS EMISSIONS. INJURY FROM FALLS.
THE HEALTH AND SAFETY OF THE PROJECT. AREAS WHERE THESE ARE USED SHOULD BE KEPT WELL VENTILATED WHILE THE
MATERIAL IS BEING USED AND FOR A PERIOD AFTER INSTALLATION. PERSONAL DURING CONSTRUCTION, OPERATION AND MAINTENANCE: WHERE ACCESS ABOVE TWO
GS4 THE PLANS SPECIFICALLY DETAIL REQUIREMENTS FOR THE COMPLETED STRUCTURE. PROTECTIVE EQUIPMENT MAY ALSO BE REQUIRED. THE MANUFACTURERS METERS IS REQUIRED, SCAFFOLDING, LADDERS, TRESTLES OR ELEVATED WORK
FURTHER TEMPORARY SUPPORTS, BRACING, CONNECTIONS ETC MAY BE REQUIRED TO RECOMENDATIONS FOR USE MUST BE CAREFULLY CONSIDERED AT ALL TIMES. PLATFORMS SHOULD BE USED ONLY IN ACCORDANCE WITH RELEVANT CODES OF
MAINTAIN THE STABILITY AND SAFETY DURING THE CONSTRUCTION PERIOD. THIS WILL PRACTICE, REGULATIONS AND LEGISLATION. ALL SCAFFOLD AND FORMWORK TO BE
VARY DEPENDING UPON THE CONTRACTORS CONSTRUCTION PROGRAM. ELEMENTS MAY HS4 SYNTHETIC MINERAL FIBRE DESIGNED AND CERTIFIED BY A LICENCED CONTRACTOR TO COMPLY WITH RELEVANT
INCLUDE BUT NOT LIMITED TO FABRICATED TIMBER AND STEELWORK ELEMENTS, FIBREGLASS, ROCKWOOL, CERAMIC AND OTHER MATERIAL USED FOR THERMAL OR AUSTRALIAN STANDARDS AND MAINTAINED IN GOOD WORKING ORDER. ANCHORAGE
UNRESTRAINED WALLS, CONCRETE COLUMNS, BEAMS AND SLABS, PRECAST OR TILT UP SOUND INSULATION MAY CONTAIN SYNTHETIC MINERAL FIBRES WHICH MAY BE HARMFUL POINTS FOR FALL ARREST DEVICE (IF ADOPTED) ARE TO BE INSTALLED, TESTED AND
PANELS, MASONRY WALLS AND PIER ETCS WHICH WILL REQUIRE TEMPORARY SUPPORTS IS INHALED OR IF IT COMES IN CONTACT WITH THE SKIN, EYES OR OTHER PARTS OF THE MAINTAINED BY A SPECIALIST LICENCED COMPANY AND OLY USED BY TRAINED
OR PROPPING TO PREVENT BEING OVER STRESSED, EXCESSIVE DEFLECTIONS OR UNTIL BODY. PERSONAL PROTECTIVE EQUIPMENT INCLUDING PROTECTION AGAINST PERSONNEL FAMILIAR WITH THE SYSTEM.
FINAL STABILITY IS ACHIEVED BY THE COMPLETED STRUCTURE. THE DESIGNER IS TO BE INHALATION OF HARMFUL MATERIAL SHOULD BE USED WHEN INSTALLING, REMOVING OR
CONTACTED IF FURTHER ADVICE IS REQUIRED. WORKING NEAR BULK INSULATION MATERIAL. SH3 SLIPS, TRIPS AND FALLS
THE CONTRACTOR IS TO ENSURE ALL AREAS AND WORK SURFACES ARE CLEAR AND
GS5 IT IS THE CLIENT AND CONTRACTORS RESPONSIBILITY TO NOTIFY THE DESIGNER OF ANY HS5 TIMBER FLOORS FREE OF DEBRIS PROVIDING SAFE ACCESS IN AND AROUND THE WORK SITE INCLUDING
SPECIFIC LOADING THAT THE STRUCTURE MAY BE SUBJECT TO. LOADING APPLIED THIS BUILDING MAY CONTAIN TIMBER FLOORS WHICH HAVE AN APPLIED FINISH. AREAS ADEQUATE STAIRS, SCAFFOLDING, SECURE LADDER ACCESS, SAFE WORKING
DURING DESIGN ARE IN ACCORDANCE WITH THE RELEVANT AUSTRALIAN STANDARDS, WHERE FINISHED ARE APPLIED SHOULD BE KEPT WELL VENTILATED DURING SANDING, PLATFORMS, ACCESS FREE FROM FALLING OBJECTS WITH SUITABLE RAILING AND
UNLESS NOTED OTHERWISE. NO SPECIFIC ALLOWANCE HAS BEEN MADE FOR THE PREPARATION AND FINISHING. PERSONAL PROTECTIVE EQUIPMENT MAY ALSO BE BALUSTRADING, FALL ARREST SAFETY POINTS OR SIMILAR
STACKED MATERIALS, MACHINERY LOADS, LIFTING DEVICES, IMPACT / VIBRATION / CYCLIC REQUIRED. THE MANUFACTURERS RECOMMENDATIONS FOR USE MUST BE CAREFULLY
LOADS ETC. ANY SPECIFIC LOADING FOR ACCESS PLATFORMS, SCAFFOLDING, FURTHER CONSIDERED AND FOLLOWED AT ALL TIMES. SH4 EQUIPMENT
MAINTENANCE HAS NOT BEEN SPECIFICALLY DESIGNED UNLESS NOTED OTHERWISE. CONSTRUCTION, MAINTENANCE AND DEMOLITION OF THIS BUILDING MAY REQUIRE THE
USE OF PORTABLE TOOLS AND EQUIPMENT. THESE SHOULD BE CAREFULLY MAINTAINED
GS6 ALL SUNDRY ITEMS INCLUDING BUT NOT LIMITED TO CLADDING DESIGN AND FIXINGS, IN ACCORDANCE WITH MANUFACTURERES SPECIFICATIONS AND NOT USED IF FAULTY OR
WINDOWS, BALUSTRADES, STAIRS, SUSPENDED CEILINGS, INTERNAL FIT OUTS, AND (FOR ELECTRICAL EQUIPMENT) NOT CARRYING A CURRENY ELECTRICAL SAFETY TAG. ALL
OTHER ELEMENTS NOT DETAILED ON OUR PLANS MUST BE DESIGNED AND INSPECTED MATERIALS HANDLING SAFETY GUARDS OR DEVICES SHOULD BE REGULARLY INSPECTED AND CHECKED TO
WHERE REQUIRED BY THE SUPPLIER OR CERTIFIER. MH1 MANUAL TASKS ENSURE PROPER FUNCTION WITH CORRECT USE OF PERSONAL PROTECTIVE EQUIPMENT
COMPONENTS WITHIN THIS DESIGN WITH A MASS IN EXCESS OF 25kg SHOULD BE LIFTED AT ALL TIMES DURING USE. ALL CONTRACTORS ARE TO ENSURE SUITABLE SPACE AND
GS7 THE CLIENT AND CONTRACTOR MUST INFORM THE DESIGNER OF ANY CHANGE TO BY TWO OR MORE WORKERS OR BY MECHANICAL LIFTING DEVICES, WHERE THIS IS NOT VENTILATION IS AVAILABLE TO UNDERTAKE USE OF THE EQUIPMENT SAFELY.
CONTRACTUAL ARRANGEMENTS WHICH MAY IMPACT ON THE DESIGN AND SAFETY OF THE PRACTICABLE, SUPPLIERS OR FABRICATORS SHOULD LIMIT THE COMPONENT MASS AS
DESIGN. THE CONSTRUCTION MUST BE UNDERTAKEN IN ACCORDANCE WITH DESIGN REQUIRED. SH5 EXCAVATION
DRAWINGS AND PROJECT DOCUMENTATION. IF CONSTRUCTION CEASES AT ANY STAGE, CONSTRUCTION AND SOME MAINTENANCE ACTIVITIES MAY REQUIRE EXCAVATION AND
THE DESIGNER MUST BE NOTIFIED TO ADVISE ON THE SAFETY OF THE PARTIALLY MH2 PRODUCT STORAGE INSTALLATION OF ITEMS WITH EXCAVATIONS. WHERE PRACTICABLE, INSTALLATION
COMPLETED WORKS AT THAT TIME. ALL MATERIAL PACKAGING, BUILDING AND MAINTENANCE COMPONENTS SHOULD SHOULD BE CARRIED OUT USING METHODS THAT DO NOT REQUIRE WORKERS TO ENTER
CLEARLY SHOW THE TOTAL MASS OF PRODUCTS AND WHERE PRACTICAL BE STORED ON THE EXCAVATION. WHERE THIS IS NOT POSSIBLE, ADEQUATE SUPPORT / SHORING
SITE IN A WAY WHICH ALLOWS SAFE LIFTING PRACTICES. ADVICE SHOULD BE PROVIDED SYSTEM FOR THE EXCAVAED AREA SHOULD BE PROVIDED TO PREVENT COLLAPSE.
ON SAFE LIFTING METHODS IN AREAS WHERE LIFTING MAY BE REQUIRED. OTHER METHODS SUCH AS BENCING OR BATTERING IN ACCORDANCE WITH DIRECTION
TRAFFIC MANAGEMENT FROM THE PROJECT GEOTECHNICAL ENGINEER MAY BE ADOPTED. WARNING SIGNS AND
MH3 MECHANICAL LIFTING BARRIERS TO PREVENT ACCIDENTAL OR UNAUTHORISED ACCESS TO ALL EXCAVATIONS
TM1 MAJOR ROADS, NARROW OR STEEP SLOPING ROADS
MECHANICAL LIFTING OF MATERIALS AND COMPONENTS DURING CONSTRUCTION, MUST BE PROVIDED.
PARKING OF VEHICLES, LOADING AND OR UNLOADING VEHICLES ON THIS ROADWAY MAY
CAUSE TRAFFIC HAZARDS. DURING CONSTRUCTION, MAINTENTANCE OR DEMOLITION OF MAINTENANCE OR DEMOLITION PRESENTS A RISK OF FALLING OBJECTS. CONTRACTORS
SHOULD ENSURE ONLY APPROPRIATE LIFTING DEVICES ARE USED BY TRAINED SH6 SMALL ENCLOSED OR CONFINED SPACES
THIS BUILDING DESIGNATED PARKING FOR WORKERS AND LOADING AREAS SHOULD BE
PERSONNEL AND THAT LOADS ARE PROPERLY SECURED WITH THE WORK AREA SUITABLY FOR STRUCTURES WITH ENCLOSED SPACES WHERE MAINTENANCE OR OTHER ACCESS
PROVIDED. TRAINED TRAFFIC MANAGEMENT PERSONNEL SHOULD BE RESPONSIBLE FOR
RESTRICTED TO PREVENT ACCESS BELOW LIFTING OPERATIONS. MAY BE REQUIRED: ENCLOSED SPACES WITH THIS BUILDING MAY PRESENT A RISK TO
THE SUPERVISION AND CONTROL OF THESE AREAS.
PERSONS ENTERING FOR CONSTRUCTION, MAINTENANCE OR ANY OTHER PURPOSE. THE
AREA MUST BE SUITABLY SIGNED AND BARRIERS PROVIDED TO PREVENT UNAUTHORISED
TM2 WHERE ON SITE LOADING / UNLOADING IS RESTRICTED
ACCESS. THESE SHOULD BE MAINTAINED THROUGHOUT THE LIFE OF THE BUILDING.
CONSTUCTION, MAINTENANCE AND DEMOLITION WILL REQUIRE LOADING AND UNLOADING
ACCESS TO THESE AREAS SHOULD ONLY BE BY SUITABLY TRAINED PERSONNEL WITH AIR
OF MATERIALS ON THE ROADWAY (SUBJECT TO APPROVAL BY LOCAL AUTHORITIES).
TESTING AND BREATHING APPARATUS USED WHERE REQUIRED. MANUAL LIFTING AND
DELIVERIES MUST BE WELL PLANNED TO AVOID CONGESTION OF LOADING AREAS WITH
OTHER MANUAL ACTIVITIES SHOULD BE RESTRICTED IN THESE PLACES WHERE
TRAINED TRAFFIC PERSONNEL USED TO SUPERVICE, MANAGE AND CONTROL THE
POSSIBLE.
LOADING AND UNLOADING AREAS.
SH7 PUBLIC ACCESS
TM3 ALL SITES
PUBLIC ACCESS TO CONSTRUCTION, MAINTENANCE AND DEMOLITION AREAS PRESENTS
ALL SITES DURING CONSTRUCTION, MAINTENANCE AND DEMOLITION WILL PRESENT A
RISKS TO WORKERS AND THE PUBLIC. SUITABLE SECURE BARRIERS AND WARNING SIGNS
RISK OF COLLISION WHERE DELIVERIES AND OTHER TRAFFIC ARE MOVING. A TRAFFIC
TO PREVENT UNAUTHORISED ACCESS SHOULD BE PROVIDED. WHERE ELECTRICAL
MANAGEMENT PLAN DEVELOPED, SUPERVISED AND CONTROLLED BY TRAINED TRAFFIC
INSTALLATIONS, EXCAVATIONS, PLANT, LOOSE MATERIALS ETC ARE PRESENT THEY
MANAGEMENT PERSONNEL SHOULD BE ADOPTED FOR THE WORKS WHERE APPLICABLE.
SHOULD BE SECURED WHEN NOT FULLY SUPERVISED.
SH8 TRAINED AND QUALIFIED WORKERS
THE CONTRACTOR IS TO ENSURE THAT THE WORKERS ARE SUITABLY QUALIFIED,
TRAINED AND INSURED FOR THE TASKS BEING PERFORMED ON SITE.
SH9 FALLING OBJECTS
RUPTURE OF SERVICES DURING EXCAVATIONS AND OTHER ACTIVITY CREATES A VARIETY
OF RISKS INCLUDING THE RELEASE OF HAZARDOUS MATERIAL. EXISTING SERVICES MAY
BE LOCATED ON OR AROUND THE SITE. WHERE COUNCIL SERVICES ARE KNOWN AT THE
TIME OF DESIGN THESE ARE SHOWN ON THE PLAN. THE EXACT LOCATION MUST BE
CONFIRMED ON SITE AS THEIR LOCATION MAY VARY. SERVICES SHOULD BE LOCATED
USING AN APPROPRIATE SERVICE (SUCH AS DIAL BEFORE YOU DIG), APPROPRIATE
EXCAVATION PRACTICE SHOULD BE USED AND WHERE NECESSARY, SPECIALIST
CONTRACTORS SHOULD BE USED.
LOCATIONS WITH UNDERGROUND POWER: UNDERGROUND POWER MAY BE LOCATED IN
OR AROUND THIS SITE. ALL UNDERGROUND POWER LINES MUST BE DISCONNECTED OR
CAREFULLY LOCATED AND ADEQUATE WARNING SIGNS USED PRIOR TO ANY
CONSTRUCTION, MAINTENANCE OR DEMOLITION COMMENCING.
LOCATIONS WITH OVERHEAD POWER LINES: OVERHEAD POWER LINES MAY BE NEAR OF
ON THIS SITE. THESE POSE A RISK OF ELECTROCUTION IF STRUCK OR APPROACHED BY
LIFTING DEVICES, OTHER PLANT AND PERSONS WORKING ABOVE GROUND LEVEL. WHERE
THERE IS A DANGER OF THIS OCCURING, POWER LINES SHOULD WHERE PRACTICAL BE
DISCONNECTED AND OR RELOCATED. WHERE THIS IS NOT PRACTICAL, ADEQUATE
WARNINGS WITH PROTECTIVE BARRIERS, BRIGHT COLOURED TAPE AND SIGNAGE ETC
MAY BE SUITABLE.
SH10 OTHER HAZARDS
THE CLIENT AND CONTRACTOR MUST MAKE THE DESIGNER AWARE OF ANY OTHER
INFORMATION RELATING TO HAZARDS AND RISKS WHERE CONSTRUCTION WORKS ARE
CARRIED OUT. THIS INCLUDES BUT NOT LIMITED TO THE LOCATION OF UNDERGROUND
AND ABOVE GROUND SERVICES, IDENTIFICIATION OF CONTAMINATED SOILS AND OTHER
MATERIALS OR THE PRESENCE OF DANGEROUS MATERIALS INCLUDING ASBESTOS. THE
CONTRACTOR MUST PROTECT NEIGHBOURING PROPERTIES AND SERVICES FROM NOISE,
DUST, RADIATION, GROUND VIBRATIONS AND OTHER CONSTRUCTION HAZARDS IN
ACCORDANCE WITH RELEVANT GUIDELINES, CODES OF PRACTICE AND RELEVANT LOCAL
AUTHORITY REQUIREMENTS. CONDITION REPORTS ON NEIGHBOURING PROPERTIES AND
STRUCTURES ARE RECOMMENDED PRIOR TO CONSTRUCTION WHERE APPLICABLE.
SH11 SITE IDENTIFICATION
ALL NEW WORKS MUST BE CONTAINED WITHIN THE ALLOCATED BOUNDARIES. A
LICENCED SURVEYOR SHOULD BE USED TO CONFIRM BOUNDARY LOCATIONS AND
SETOUT AND ANY OTHER FEATURES FOR THE SITE. THE CONTRACTOR IS REQUIRED TO
VERIFY AND IF NECESSARY CONDUCT FURTHER SEARCHES TO LOCATE EASEMENTS,
SERVICES, BOUNDARIES, TRES, EXISTING STRUCTURES AND ANY OTHER OBSTRUCTIONS
PRIOR TO CONSTRUCTION. THE DESIGNER IS TO BE IMMEDIATELY NOTIFIED OF ANY
ELEMENTS NOT SHOWN ON THE APPORVED PLANS AND THE DESIGN AND SAFETY
REPORT MAY REQUIRE AMENDING
SH12 SITE MAINTENANCE
IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE THAT THE SITE IS MAINTAINED IN A
SAFE WORKING MANNER AND THAT ALL SITE PRACTICIES ARE IN ACCORDANCE WITH THE
CURRENT WORK HEALTH AND SAFETY ACT AND REGULATIONS.
INFORMATION
NOT FOR CONSTRUCTION
Client Status Title
MARK BAIN INFORMATION
NOTES SHEET - SHEET 2
Drawn By Designed By Approved By
JAL JM JO
Project No. Discipline Scale
[email protected] 20220173 STRUCTURAL 1:1 (at A1)
Project Name
37 MARY ST NOOSAVILLE, QLD Drawing No. Revision
1 04.11.22 ISSUE FOR INFORMATION JAL JO NOOSA VILLAS
07 5211 1003 S002 1
Rev Date Description By Chk 10 NATASHA AVE & 24 KATHARINA ST, NOOSA HEADS QLD
FULL SIZE ON ORIGINAL 0 10 20 30 40 50 60 70 80 90 100 mm
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Structural Plans 20220173 - 10 Natasha Structural Issue 190123.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.