Original source · versioned page text
Planning-report-12 Figbird Court 1 Dec 2021 Final
Very large file: it may take a few minutes
The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Appendix 3 Biodiversity, Waterways and Wetlands Overlay
Code Compliance Check
The proposed development is located partly within the riparian buffer area.
Table 5.9.2 Biodiversity, Waterways and Wetlands Overlay requires Code assessment for a Material change of use
where proposed development involves development on that part of premises identified as Riparian buffer area.
Table 8.2.2.3 - Criteria for assessable development
Management of impacts Table 8.2.2.3 - Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Response
Ecologically important areas
PO1 AO1.1 AO1.1
Development is sited and designed to Ecologically important areas are An ecologically important area is
protect the physical and ecological conserved or improved to ensure their defined in the planning scheme as
integrity and biodiversity of ecologically ongoing contribution to the natural meaning any one of 19 described
important areas through protection of: resources and biological diversity of areas. Of these only
Noosa Shire. 12. a riparian zone;
3. existing habitat areas 13. riparian vegetation;
and ecological linkages; and AND 14. an ecological linkage;
4. existing riparian vegetation, are considered as possibly
waterways and wetland habitat applicable to the proposed
values. development.
The term Riparian zone is further
defined in the planning scheme as
meaning:
“…land which adjoins, directly
influences, or is influenced by a
body of water”,
The term Riparian vegetation is
further defined as including:
vegetation in a permanent tidal
watercourse or within 250m from
the top of the bank of a
permanent tidal watercourse;
vegetation in Lake Macdonald or
within 400m of the full level of
DA forms guide: Planning report template | July 2017 Page 33 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.