Original source · versioned page text
Planning-report-12 Figbird Court 1 Dec 2021 Final
Very large file: it may take a few minutes
The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Bushfire management Table 8.2.2.3 - Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Response
Bushfire management
PO12 No acceptable outcome provided PO12
Bushfire management measures are The proposed development is located
adopted based on ecological in a potential impact buffer area.
principles, which:
1. maintain and enhance
biodiversity;
2. minimise threat of fire to the
natural environment, as well as
life and property; and
3. provide for effective use and
maintenance of buildings and
structures.
Editor's note—The performance
outcome applies to properties in Adequate water supply for fire fighting
bushfire hazard areas and only purposes will be provided as part of
where clearing is reasonably this development (existing 90,800
necessary for the control of bushfire litres of water tank storage plus a
risk to a building or proposed plunge pool) and the
development is located in an existing
structure. Bushfire hazard areas are cleared area.
shown on Bushfire Hazard Overlay
maps in Schedule 2.
Scenic amenity Table 8.2.2.3 - Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Response
Scenic amenity
PO13 AO13.1 AO13.1
The scenic amenity and vegetated Vegetation is retained: No vegetation clearing is proposed as
character of the landscape is 1. on and within 30 metres of part of this development.
protected by retaining vegetation: prominent ridgelines and
on sloping sites;
1. along and around watercourses 2. in gullies;
and drainage lines; 3. along watercourses and
2. on steep slopes and ridgelines; drainage lines;
3. along the major road network; 4. within 10 metres of the major
and road network; and
4. that forms coastal vistas to and 5. along the front coastal dune
from beaches. system.
DA forms guide: Planning report template | July 2017 Page 43 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.