Skip to the record
Accept no substitutions.

Original source · versioned page text

Planning-report-12 Figbird Court 1 Dec 2021 Final

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Appendix 4 Regional Infrastructure Overlay Code Compliance
Check
The proposed development is located partly within the Water resource catchment area and the Water supply buffer area.




Table 5.9.9 Regional Infrastructure Overlay requires Code assessment for a Material change of use in the Water
resource catchment area and the Water supply buffer area except where the material change of use is in an existing
building, and not involving a dwelling house on an existing lot and only if the material change in use involves:
         the establishment, expansion or upgrade of an on-site wastewater treatment system; or
         increasing the number of people living or working on site;

The proposed development is involving a dwelling and will increase the number of people living on the site but the
current on-site 10 EP Fuji Clean Advanced Secondary Wastewater Treatment System is considered adequate as only
two persons currently reside on the site.
Table 8.2.9.3 Criteria for assessable development- Water Resources
 Performance outcomes                 Acceptable outcomes                  Response
 Water catchment
 PO1                                                                       PO1
 Development does not cause           No acceptable outcomes provided      The proposed development is part
 adverse effects on:                                                       located within the Water resource
                                                                           catchment and the Water supply
                                                                           buffer areas.
 4. the quality and quantity of
    water entering Lake
    Macdonald, Cedar Pocket
    Dam or its tributaries, or the
    Mary River drinking water
    intake;
 5. flow regimes, flooding levels or
    flood volumes outside the
    boundaries of the site; and
 6. the environmental values, land
    resources and natural systems
    in these catchments.
                                                                           The proposed development is a
 Editor’s Notes—                                                           modest 146.74 SQM three-bedroom




DA forms guide: Planning report template | July 2017                                                     Page 44 of 48
Log in to download the original file

Planning-report-12 Figbird Court 1 Dec 2021 Final.pdf · 11.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.