Planning-report-12 Figbird Court 1 Dec 2021 Final
Very large file: it may take a few minutes
The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Performance outcomes Acceptable outcomes Response
Water catchment
storage of hazardous chemicals The proposed development does
(including fuelling of vehicles) not involve the management,
within a Water supply buffer, is handling and storage of hazardous
chemicals.
undertaken in secured, climate
controlled, weather proof, level
and bunded enclosures.
PO5 AO5 AO5
Development maintains an Development complies with the The proposed development is
adequate separation distance and separation distances by stream located 90 meters from the nearest
waterway.
avoids areas of potential flood order as specified in Table
inundation to protect waterways or 8.2.9.3A
water supply sources.
Bulk Water Infrastructure
PO6 AO6 AO6
Development is set back from bulk Development is setback in NA
water supply infrastructure to: accordance with Table 8.2.9.3B
‘Recommended separation
1. avoid safety risks to people distances from bulk water supply
and property; infrastructure’.
2. minimise noise and visual
impacts to people and
property; and
3. ensure the physical integrity
and operation, maintenance
and expansion of the
infrastructure is not
compromised.
PO7 AO7 AO7
Vegetation planted near pipelines Planting near pipelines complies NA
does not pose any risk to the with the current Seqwater Network
physical integrity and operation of Consent Guidelines.
the bulkwater pipelines.
PO8 AO8 AO8
Development is located and Development does not NA
designed to maintain restrict access to Bulk water
required access to Bulk water supply infrastructure of any type or
supply infrastructure. size, having regard to:
1. buildings or structures;
2. gates and fences;
3. storage of equipment or
materials;
4. landscaping or earthworks or
stormwater or other
infrastructure.
DA forms guide: Planning report template | July 2017 Page 47 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.