Performance outcomes Acceptable outcomes Response
Water catchment
AO2.4
Carcasses are not buried on-
site except as required in
accordance with any emergency
animal disease directive by a
biosecurity agency.
PO3 AO3.1
Development does not discharge Development does not generate
wastewater unless demonstrated wastewater.
to not compromise the drinking
water supply environmental OR
values. AO3.2
AO3.2 The proposed development will be
Wastewater generated from the connected to the existing 10 EP
development is collected and Advanced secondary effluent HSTP
contained on site, and is: and treated waste water will be
pumped to a new surface irrigation
area outside the Lake Macdonald
1. lawfully disposed to sewer;
catchment.
2. transferred off-site for
treatment/disposal to an
appropriately licensed facility;
3. treated to meet the drinking
water supply environmental
values prior to release; or
4. reused on-site in a closed-
cycle irrigation scheme,
industrial processes,
washing/cleaning or other
purpose.
AO3.3 AO3.3
Treated wastewater will be confined
Where treated wastewater is to a dedicated area on site outside
irrigated to land, it will: the Water resource catchment and
the Water supply buffer areas.
1. be confined to a dedicated
area of land on-site;
2. be suitably located and sized;
and
3. use irrigation practices that will
not harm groundwater and on-
site surface water quality.
Editor's note- Developments
involving the irrigation of
wastewater will need to provide a
MEDLI Modelling Report
demonstrating the nominated land
area for wastewater irrigation is
suitably located and sized to
accommodate design wastewater
loads, storages are suitably sized
to accommodate design
wastewater loads, and proposed
irrigation practices will not damage
water quality. It is recommended
the modelling exercise incorporate
scenarios based on both a 10-year
and 20-year planning horizon and
incorporate a minimum of three
irrigation concepts.
PO4 PO4
Management, handling and No acceptable outcome provided
DA forms guide: Planning report template | July 2017 Page 46 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.