Original source · versioned page text
Minor Change Existing Approval 51992 539 04 [As Published]
Please note that the headworks charges will alter in accordance with Price Index variations
or if any amendment is made to Council's policy.
If payment is not proposed to be made prior to the issue of Building Approval, a cash bond
or trading bank guarantee for the required amount is to be lodged, prior to the release of that
Approval. The contribution is then required to be made within fourteen (14) days of the issue
of Building Approval.
The applicant should note Council's policy on Deferred Payment of Headworks effective until
March, 1993.
11. The footpath across the frontage of the site is to be upgraded by the provision of a 1.2 metres
wide concrete footpath and the forming, grassing and topsoiling of the remaining area to the
satisfaction of the Shire Engineer. The footpath is to be generally located 0.9 metres from
the property alignment, though a curvilinear alignment may also be acceptable and desirable.
12. The developer shall bear the cost of alteration of any public utility or other facilities
necessitated by the development of the land or associated construction works external to the
site.
13. Connection to Council's existing sewerage reticulation systems at the developer's expense
to the standards and requirements of the Shire Engineer.
14. The developer shall provide a metered water connection from the water supply system to the
proposed development, in accordance with Council's standards and to the satisfaction of the
Shire Engineer
15. Roof and surface water is to be collected on site and is to be discharged through a single
underground drain line into the canal system to the satisfaction of the Shire Engineer. A
Building Approval shall not be granted until the Shire Engineer has approved of the drainage
scheme.
16. Provision of approved refuse containers in accordance with the requirements of the Refuse
Management Regulations of 1983 for the storage and collection of refuse to the satisfaction
of Council's Environmental Health Officer.
17. Provision of an imperviously paved and drained area to be drained to Council's sewer to
accommodate all refuse containers to the reasonable satisfaction of Council's Environmental
Health Officer. This area is to be aesthetically screened from any road frontage or adjoining
property boundary and is to be setback a distance of two (2) metres from any road frontage.
A suitable hosecock and hoses are to be located in the vicinity of the refuse container area.
18. Any flat or unit intendecl to be let out for fee or reward is to be licensed annually with Council's
Health Department in accordance with the provisions of Chapter 43 of Council's By-Laws
prior to such letting.
19. The swimming pools shall be licensed annually with the Council's Health Department in
accordance with the provisions of Chapter 42 of Council's By-Laws.
20. Four (4) jetties are approved for the site and an application in accordance with Council's
Policy is required to be submitted prior to the construction of the jetties. In this regard the
jetties are to comply with Council's Policy and shall not be more than 10 metres in length.
The jetties as indicated on plan 9220.SKO6 exceed 10 metres in length and are not
approved.
21. Building platforms within the subject site are to be filled to a maximum level of 2.3 m. AHD.
The maximum height of all building is to be 8 metres above this level.
22. Submission of a cash bond or trading bank guarantee to the sum of $300,000, prior
to the issue of Building Approval comprising:-
(a) $250,000 tosecure payment of water supply and sewerage headworks charges;
(b) $50,000 to secure performance of conditions;
Page 3 of 6
Document Set ID: 23305199
Version: 2, Version Date: 17/10/2024
[OCR of page images]
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
Please note that the headworks charges will alter in accordance with Price Index variations
or if any amendment is made to Council's policy.
If payment is not proposed to be made prior to the issue of Building Approval, a cash bond
or trading bank guarantee for the required amount is to be lodged, prior to the release of that
Approval. The contribution is then required to be made within fourteen (14) days of the issue
of Building Approval.
The applicant should note Council's policy on Deferred Payment of Headworks effective until
March, 1993.
The footpath across the frontage of the site is to be upgraded by the provision of a 1.2 metres
wide concrete footpath and the forming, grassing and topsoiling of the remaining area to the
satisfaction of the Shire Engineer. The footpath is to be generally located 0.9 metres from
the property alignment, though a curvilinear alignment may also be acceptable and desirable.
The developer shall bear the cost of alteration of any public utility or other facilities
necessitated by the development of the land or associated construction works external to the
site.
Connection to Council's existing sewerage reticulation systems at the developer's expense
to the standards and requirements of the Shire Engineer.
The developer shall provide a metered water connection from the water supply system to the
proposed development, in accordance with Council's standards and to the satisfaction of the
Shire Engineer
Roof and surface water is to be collected on site and is to be discharged through a single
underground drain line into the canal system to the satisfaction of the Shire Engineer. A
Building Approval shall not be granted until the Shire Engineer has approved of the drainage
scheme.
Provision of approved refuse containers in accordance with the requirements of the Refuse
Management Regulations of 1983 for the storage and collection of refuse to the satisfaction
of Council's Environmental Health Officer.
Provision of an imperviously paved and drained area to be drained to Council's sewer to
accommodate all refuse containers to the reasonable satisfaction of Council's Environmental
Health Officer. This area is to be aesthetically screened from any road frontage or adjoining
property boundary and is to be setback a distance of two (2) metres from any road frontage.
A suitable hosecock and hoses are to be located in the vicinity of the refuse container area.
Any flat or unit intendecl to be let out for fee or reward is to be licensed annually with Council's
Health Department in accordance with the provisions of Chapter 43 of Council's By-Laws
prior to such letting.
The swimming pools shall be licensed annually with the Council's Health Department in
accordance with the provisions of Chapter 42 of Council's By-Laws.
Four (4) jetties are approved for the site and an application in accordance with Council's
Policy is required to be submitted prior to the construction of the jetties. In this regard the
jetties are to comply with Council's Policy and shall not be more than 10 metres in length.
The jetties as indicated on plan 9220.SKO6 exceed 10 metres in length and are not
approved.
Building platforms within the subject site are to be filled to a maximum level of 2.3 m. AHD.
The maximum height of all building is to be 8 metres above this level.
Submission of a cash bond or trading bank guarantee to the sum of $300,000, prior
to the issue of Building Approval comprising:-
(a) $250,000 tosecure payment of water supply and sewerage headworks charges;
(b) $50,000 to secure performance of conditions;
Page 3 of 6
Document Set ID: 23305199
Version: 2, Version Date: 17/10/2024
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Minor Change Existing Approval 51992 539 04 [As Published].pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.