Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Minor Change Existing Approval 51992 539 04 [As Published]

of 6

Page text read automatically using OCR, there may be inaccuracies

                      The cash bond or trading bank guarantee will be returned upon payment of the required
                      sums and performance of the conditions of approval.
               23.    The provisions of this approval are to be effected, prior to the commencement of the
                      approved use. Council reserves the right to call upon the bond or guaranteed sum referred
                      to in this approval for the purposes of litigation should the use not be conducted in
                      accordance with this approval.
               24.    The Town Planning Consent Permit may be revoked pursuant to Section 4.14 of the Local
                      Government (Planning and Environment) Act if commencement of erection or works have
                      not been made in accordance with that Permit or the rights conferred by that Permit are not
                      exercised within two (2) years of the date of issue of the Permit.
               25.    The Town Planning Consent Permit lapses where:-
                      a.      the use or erection of a building or other structure associated with the use, has not
                              been commenced within four (4) years of the date of issue of the Town Planning
                              Consent Permit, unless application is made and approved by Council for an extension;
                              or
                      b.      the use of any premises pursuant to the Town Planning Consent Permit ceases for a
                              period of twelve (12) months.
               26.    The developer is advised that the traffic movements at Gibson Road and access to the site
                      are to be left-in/left-out only. Accordingly, the developer will be required to construct
                      intersection improvements which will restrict the traffic movements to the site to left-in/left-
                      out only, such improvements are to include a centre median to Gibson Road and associated
                      road widening. These improvements are to be constructed prior to any works commencing
                      on site. The intersection restrictions are to remain in place until such time as the ultimate four
                      lane carriageway with centre median is constructed.
                      With regard to the intersection improvements, plans prepared by a registered Civil Engineer
                      are to be submitted to and approved by the Shire Engineer, prior to the issue of Building
                      Approval.
               (B)    Advise the applicant that a Town Planning Consent Permit will be issued following the
                      expiry of the applicant's and objector's appeal period and no appeal is instituted.
               (C)    Approve GTS 2779 associated with TPC 2477 subject to the following conditions:-
                      1.      This approval will lapse if a group titles plan has not been submitted for sealing within
                              a period of two years from the date of this decision.
                      2.      The area and number of lots is to generally accord with plans 9220.SKOl.
                      3.      Council will only sign and seal a group titles plan of subdivision following completion of
                              site and building works associated with TPC 2477 and in accordance with Council's
                              Policy on the release of group title plans
               5.     REFERRAL AGENCIES

               Not applicable
               6.     ADVISORY NOTES

               Not applicable.
               7.     PROPERTY NOTES

               Not applicable
               8.     VARIATION APPROVAL DETAILS

               Not applicable




                                                                                                          Page 4 of 6
Document Set ID: 23305199
Version: 2, Version Date: 17/10/2024


[OCR of page images]
23.

24.

25.

26.

(B)

(C)

5.

The cash bond or trading bank guarantee will be returned upon payment of the required
sums and performance of the conditions of approval.

The provisions of this approval are to be effected, prior to the commencement of the
approved use. Council reserves the right to call upon the bond or guaranteed sum referred
to in this approval for the purposes of litigation should the use not be conducted in
accordance with this approval.

The Town Planning Consent Permit may be revoked pursuant to Section 4.14 of the Local
Government (Planning and Environment) Act if commencement of erection or works have
not been made in accordance with that Permit or the rights conferred by that Permit are not
exercised within two (2) years of the date of issue of the Permit.

The Town Planning Consent Permit lapses where:-

a. the use or erection of a building or other structure associated with the use, has not
been commenced within four (4) years of the date of issue of the Town Planning
Consent Permit, unless application is made and approved by Council for an extension;
or

b. — the use of any premises pursuant to the Town Planning Consent Permit ceases for a
period of twelve (12) months.

The developer is advised that the traffic movements at Gibson Road and access to the site
are to be left-in/left-out only. Accordingly, the developer will be required to construct
intersection improvements which will restrict the traffic movements to the site to left-in/left-
out only, such improvements are to include a centre median to Gibson Road and associated
road widening. These improvements are to be constructed prior to any works commencing
on site. The intersection restrictions are to remain in place until such time as the ultimate four
lane carriageway with centre median is constructed.

With regard to the intersection improvements, plans prepared by a registered Civil Engineer
are to be submitted to and approved by the Shire Engineer, prior to the issue of Building
Approval.

Advise the applicant that a Town Planning Consent Permit will be issued following the
expiry of the applicant's and objector's appeal period and no appeal is instituted.

Approve GTS 2779 associated with TPC 2477 subject to the following conditions:-

1. This approval will lapse if a group titles plan has not been submitted for sealing within
a period of two years from the date of this decision.

The area and number of lots is to generally accord with plans 9220.SKOI.

Council will only sign and seal a group titles plan of subdivision following completion of
site and building works associated with TPC 2477 and in accordance with Council's
Policy on the release of group title plans

REFERRAL AGENCIES

Not applicable

6.

ADVISORY NOTES

Not applicable.

7.

PROPERTY NOTES

Not applicable

8.

VARIATION APPROVAL DETAILS

Not applicable

Page 4 of 6

Document Set ID: 23305199
Version: 2, Version Date: 17/10/2024

Log in to download the original (Minor Change Existing Approval 51992 539 04 [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.