OZCARE NOOSA AGED CARE RESIDENCE Construction Management Plan
Normal Control Measures
a) Install and maintain filter mediums as required. Systems such as, silt sediment fencing, cover
existing stormwater drain inlets with sediment screening and other appropriate bunding as
required.
b) Sediment control screening will be installed to site boundaries where site ground levels are higher
than adjoining footpaths and neighboring land.
c) Stormwater control, collection and treatment devices to be implemented if found to be necessary.
d) Inspect and monitor stormwater manholes and waterways.
e) Daily inspections will be undertaken to monitor and review the need for cleaning of footpath and
roadway. Should the need arise the roads will be swept and cleaned by mechanical sweeping plant.
f) Ensure safe storage of chemicals on site.
g) Store all goods and materials in a manner to avoid contamination of water or areas where water
may drain.
h) Provide and inspect regularly readily accessible spill kits /pollution control equipment.
i) Inspect regularly and remove / replace as required sediment control devices.
j) Provide and maintain paint washout facilities to ensure that residual paint will not flow or be
washed into any street gutters, stormwater drains or natural water ways.
k) Refueling or the maintenance of vehicles or plant will take place in areas from which fuel, oils or
washings will not be discharged into any street gutters, stormwater drains or natural water ways.
8 PEDESTRIAN AND PUBLIC SAFETY ISSUES
Site construction access will be via Cooyar Street. Appropriate traffic control will be provided if required,
to attend to major deliveries, Concrete Pours and Crane Lifting to maintain vehicular and public safety
around the site.
Temporary Fencing / hoarding will be provided on the around the fire trail and works stages for public
safety. The boundaries will be fenced as required.
8.1 Site Main Access
The main site construction pedestrian and vehicle access will be via the facilities Cooyar Street entry, into
the facility and site area.
All visitors entering the construction site must first report to the Project Site Office to sign in. There will
be no Visitor Parking on site. While we do not envisage any requirement for traffic control, it will be
provided if required for any activity identified.
Woollam Constructions Page 9 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Management Plan from STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.