OZCARE NOOSA AGED CARE RESIDENCE Construction Management Plan
7 ENVIRONMENTAL ISSUES
Environmental issues for these stages of the project are to be covered specifically in an Environmental
Management Plan (EMP) included in Appendix 4 and shall include but not be limited to:
7.1 Dust and Air Quality Control Management
Air Quality Management, will be in accordance with;
a) EMP in conjunction with
b) Local EPA requirements.
7.2 Noise Control
Noise Control Management, will be in be in accordance with;
a) EMP, and in conjunction with;
b) Local EPA requirements
In order to reduce the noise impact on the surrounding areas Woollam Constructions will implement the
following control measures:
a) The hours for construction work on the site which generates audible noise will be limited to the
working hours of 7:00am to 6:30pm Monday to Saturday. No work is to be undertaken on Sundays
or public holidays without prior Council authority approval.
b) Noise levels to be kept within legislative requirements and monitored as required.
c) Construction equipment shall be properly noise attenuated where possible and maintained in
good working order.
d) All equipment used on site will be operated in an efficient manner and properly maintained.
e) A complaints register will be developed to fully investigate any noise complaints.
f) Respond expeditiously to any public complaints and maintain a complaints’ register
g) Ensure all works are conducted within approved hours.
7.3 Vibration
Vibration Control Management will be in accordance with:
a) EMP, and in conjunction with;
b) Local EPA requirements
7.4 Site Drainage and Water Quality
Site Drainage and Water Quality Management, will be in be in accordance with:
a) EMP, and in conjunction with,
b) Local EPA requirements
c) Erosion & Sediment Control Plans (Appendix 3)
Woollam Constructions Page 8 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Management Plan from STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.