Council archive · source document
Construction Management Plan from STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0118
Plans and drawings: the text below has words only, no drawings.
OZCARE NOOSA AGED CARE RESIDENCE Construction Management Plan
Project Name OZCARE NOOSA AGED CARE RESIDENCE
Document Reference CMP
Effective Date July 2024
Revisions: Amendments are summarised in the tables below.
Review /Approval:
Date Revision Author Reviewed By Authorised By
23/04/24 001 Bryan Ward Insert Name Insert Name
The personnel below confirm they have read the contents of the Construction Management Plan and
appendices and understand their responsibilities and the safe work methods to be adopted on this
project.
Name Position Signature Date
Bryan Ward Project Manager
Ben Luck Contract Administrator
Insert Name Project Administrator
Insert Name Site Manager
Insert Name HSE Co-Ordinator
Insert Name Site Compliance Advisor
Richard Robazza Site Foreman
Dakoda Woollam Apprentice
Insert Name Labourer
Woollam Constructions Page 2 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Management Plan from STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.