Construction Management Plan from STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0118

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
OZCARE NOOSA AGED CARE RESIDENCE                                                                             Construction Management Plan


         2.5        Project Organisational Chart

 WOOLLAM CORPORATE SUPPORT
 Managing Director: Craig Percival
 Executive Director: George Bogiatzis
 General Manager: Dan Jebbink
 Area Manager SEQ: Mitch Perry
 Commercial Manager: Carolyn Cox                                   Project Manager        Design Manager              Cost Planner
 Construction Manager: Matt Collyer                                 BRYAN WARD             Troye Gibbs              Robert Marcellus
 HSEQ Manager: Cameron Stewart



                                        Project Administrator   Contracts Administrator      Consultants
                                                 TBA                  BEN LUCK



                                                                     Site Manager
                                                                          TBA




             Site HSEQ Advisor               Site Engineer           Site Foreman         Finishes Foreman      Defect/Commiss. Foreman
                    TBA                           TBA             RICHARD ROBAZZA                TBA                      TBA



                                                                      Apprentice


                                                                       Labourer


                                                                   Contract Partners



Woollam Constructions                                                                                                           Page 5 of 17

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Management Plan from STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.