Council archive · source document
Construction Management Plan from STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0118
Plans and drawings: the text below has words only, no drawings.
OZCARE NOOSA AGED CARE RESIDENCE Construction Management Plan
2.5 Project Organisational Chart
WOOLLAM CORPORATE SUPPORT
Managing Director: Craig Percival
Executive Director: George Bogiatzis
General Manager: Dan Jebbink
Area Manager SEQ: Mitch Perry
Commercial Manager: Carolyn Cox Project Manager Design Manager Cost Planner
Construction Manager: Matt Collyer BRYAN WARD Troye Gibbs Robert Marcellus
HSEQ Manager: Cameron Stewart
Project Administrator Contracts Administrator Consultants
TBA BEN LUCK
Site Manager
TBA
Site HSEQ Advisor Site Engineer Site Foreman Finishes Foreman Defect/Commiss. Foreman
TBA TBA RICHARD ROBAZZA TBA TBA
Apprentice
Labourer
Contract Partners
Woollam Constructions Page 5 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Management Plan from STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.