Original source · versioned page text
Approved Plans - RAL23 0021 & OPW23 0177
Plans and drawings: the text below has words only, no drawings.
Very large file (101 MB): may take a few minutes to open.
11C CHURCH STREET, POMONA Landscape Plan Package Drawing Schedule · Should amended site topsoils be insufficient in quantity, contractor to import A.S. 4419 topsoil Vegetation Retention Area Annual Maintenance Regime 4.0 Revegetation and spread to proposed plan finish levels. Prior to spreading, imported topsoils shall have soils · Assess remaining native vegetation plants / stands once weed management activities have analyses test as per above. Amend Imported soils per test results prior to spreading. Task Frequency Performance Indicator concluded. Confirm areas / spaces to be allowed to regenerate naturally. LD1 Drawing Schedule, Specifications · Civil works to cultivate subgrade 150mm and re-spread ameliorated stockpiled topsoil to plan Brushcutting October - March: Fortnightly Regenerating plants and · Revegetate areas / spaces that are denuded and/or unlikely to regenerate naturally. LD2 Specifications, Sheet Layout prescribed proposed contours and track-in, 300mm deep for gardens and 150mm deep for turf April- September: Montlly revegetation areas free from · Confirm revegetation requirements once weed removal has been completed for quantum of new areas. Landscape contractor to provide unit cost to perform these works in-lieu of civil competition with grass plants required. Adjust planting quantities accordingly. LD3 Finishes and Planting Schedules contractor. · Revegetation species as per designated area Revegetation Planting Schedules respectively. LD4 Details · Clear and remove all non-organic, deleterious and large organic matter such as rocks greater Weeding - Establishment Period - Weekly Minimal regrowth of weeds. No LP1-3 Planting Plans than 40mmØ, tree roots, trunks, limbs, and stumps from all areas to be landscaped. by hand Maintenance Period - Fortnightly competition from unchecked 5.0 Landscape Construction · Ensure smooth, flowing, even grades and positive drainage with no ponding to fall weed and grass regrowth. Specifications percentages shown on plan, 3% (minimum 2%). Finish grades shall blend into existing grades Spraying / October - March: Fortnightly No weeds or grass of greater Levels providing a natural appearance with no abrupt edges. Wick Wiping April - September: Monthly height than plant within · See plan for engineer's plan levels and proposed levels. These landscape plans must be read in conjunction with the appropriate statutory approvals and · Ensure 2% minimum slope away from all structures to pits or swales. 500mm of plants · Verify all levels, conditions, and utility locations in-the-field including all inverts. If a Australian Standards. · Trim topsoils for gardens, revegetation and turfing. discrepancy occurs notify superintendent and/or LA. Re-mulching Allow to carry out at least once during Uniform 100mm deep to · Levels to be confirmed by a qualified/licensed surveyor. See plans for level sources. Maintenance Period, then once per year suppress weed growth and 1.0 General Notes · Grade evenly between prescribed levels and finish surface levels ensuring positive drainage maintain soil moisture 2.0 Ecololgical Rehabilitation, Vegetation Management and Revegetation and no ponding areas. Abbreviations Watering Establishment Period: Every 2 or 3 days Plants exhibit healthy growth · Except where indicated or specified (i.e. allowing for mulching and sheet flow over settled · NC - Noosa Council · A.S. - Australian Standards · There is existing vegetation on-site. In order to maximise the retained ecological values for Maintenance Period: Weekly / as required and no signs of drought stress turf), finish surface levels are to be flush with adjacent surfaces and graded evenly between · DBH - Diameter at breast height (1.4m) · E.P. - Establishment Period this vegetation, nominated existing vegetation requires protection and management. to maintain adequate soil moisture design and finish levels. · LA - Landscape Architect · N/A - Not applicable · O.C. - On centre · Natural vegetation regeneration needs to be encouraged. · Co-ordinate establishment of levels with superintendent. Fertilising As required where and when plants are Plants exhibit healthy growth · MP - Maintenance Period · MRTS - Main Roads Technical Standard · Site weed removal and management is important to allow regeneration and is a NC not responding to slow release fertiliser and no signs of nutrient · m - metre · m² - square metre · m³ - cubic metre condition of the development approval. Drainage applied at planting. Allow to fertilise once element deficiency stress · NATA - National Association of Testing Authorities · typ. - Typical · Vegetation to be protected is plan nominated, predominately native species, in a healthy and · All damaged stormwater pipes are replaced and relocated as necessary. during Maintenance Period. · uPVC- Unplasticised Polyvinyl Chloride · S - Spread safe condition, that are not located so as to interfere with required and approved site works. · Ensure site drainage can occur positively to whole of site, minimum 2% away from any · VPZ - Vegetation Protection Zone · WbD - Water by Design · New Planting / Revegetation works shall be conducted in Vegetation Management areas as Staking As required where plants require support. Plants growing in an buildings and where paths, edges, and gardens etc. may impede drainage; refer to LA before required. Refer to Planting Schedule and Plan for more information. Allow to stake 20% of trees during upright manner continuing works. · The Landscape Plans must be read in conjunction with 28 September 2023 Judgment, · The table below summarizes the Vegetation Management program elements; Establishment Period. Allow to stake · Drainage works to correlate with and not disturb adjacent land. Attachment A pages 1-160 and the Operational Works Landscaping Decision Notice once additional 20% of trees during · See legend for plan symbols and plans for locations. issued. This plan has been developed to comply with the Noosa Plan 2020, Landscape Code Vegetation Management Program Maintenance Period. · Landscape field pits to be 300mm x 300mm x 450mm 'Polycrete' pits with hot dipped in accordance with the following; Storm Damage Following storm event, heavy rainfall or Any damage noted and rectified galvanised surface grate/lid (non-heel slip grates in paved areas). Determine requirements · 9.4.5 Landscaping Code Issue Vegetation Management - Clearing and Protection on-site in addition to those on plans. Inspection high winds · PSP 2 Landscaping · All drainage pits and subsurface drains to be connected to existing stormwater drainage Objective · Identify areas of vegetation and individual trees to be protected and · Table SC6.3.5.1 Pruning To promote healthy plant growth. Plants have desired natural system. Refer engineer's drawings for drains and hydraulic services. retained within the development areas and those to be cleared. Establishment Period: Monthly form and exhibit healthy growth · Stormwater drainage to be 100mmØ minimum uPVC drainage pipe. · Confirm workers understand the requirements of protection and retention. · These plans are not for tender or construction. Maintenance Period: Every 3 months · Subsurface drainage to be 100mm minimum Ag-flow pipe centred in 300mm x 300mm gravel Install protective devices to safeguard against accidental damage. trench. Gravel to be 8-20mmØ No-fines aggregates surrounded by LA approved permeable · Confirm appropriate clearing methods for nominated areas and within Monitoring Establishment Period: Provide a report to Successful establishment and Preliminaries bidim or geotextile fabric. See Detail(s) for more information. vicinity of protected and retained areas. LA on establishment progress at each scheduled maintenance · Refer to plans by others for all services locations, footpath works, levels (other than those progress payment claim. activities completed · Furnish and install 1m³ of 75mm - 150mmØ washed, sound, rounded Mary River · Minimise the time between when clearing occurs and the cleared ground is indicated on these plans) and boundaries. All services and related infrastructure including Maintenance Period: Furnish completed gravel spalls over pinned permeable geo-fabric at all new landscape drainage stabilised to reduce the chances of erosion. street lighting shown on these plans are indicative only. activities list to LA every 3 months daylight points. · Mulch or wood-chip cleared vegetation that is free of designated weed · Call 'Before You Dig Australia 11 00' prior to any excavation. · Where and if additional drainage is required the following applies: species or dispose appropriately and legally. · Before work commences the subcontractor is to organise a pre-start meeting with the LA to 3.0 Weed Management - Allow for seepage interception sub-surface drainage where paths and landscape works establish scope of works management procedures and clarify any issues. · As a condition of development approval, all noxious and environmental weeds are to be impede drainage (to be coordinated on site). Management · This Vegetation Management strategy should be included with civil works · Install tree protection measures as per plans and detail. removed from site and/or managed appropriately prior to sealing of plans. - Allow for 300mm x 300mm gravel trench with socked Ag-line under path, discharge to Strategy documentation. · Prior to commencing construction works, verify dimensions, levels and location of site · Weed control locations shall be confined to retained vegetation areas as nominated on the natural drainage lines. · Potentially obtain a guarantee by the contractor against culpable damage services, refer engineer's drawings generally. approved plans. - Allow for 300mm x 300mm lateral collection trenches extending nominal 1m either side to vegetation to be retained with performance bond under the contract. · Dimensions take precedence over scale. · Weed control is summarised in the table below; of low point. · Contractor to review all schedules herein to confirm their correlation to these plans. Where Weed Management Summary Table Tasks · Superintendent to confirm plan nominated vegetation to be retained and discrepancies occur within landscape documentation refer to LA prior to provision of tender Fencing protected in-the-field and determine if any additional areas of vegetation pricing and/or construction. Task Operation Frequency · Supply and construct fencing per plans, details, and Finishes Schedule. require protection. · Retained vegetation shall be identified, clearly marked and protective 1.0 - Herbaceous Remove entire plant by hand. Alternatively kill plant with Following weed Erosion and Sediment Control Edging devices installed. Protective devices shall maintained in functional and small weed herbicide application using wick wiper or hooded spray identification and · The landscape contractor to implement and maintain for the contract duration, best practice · Supply, install, and maintain edges as specified and shown on the plans and details and condition during works operations and removed in entirely and recycled control nozzle. For herbaceous weeds cut or scrape stem and as required to erosion and sediment control measures in accordance with the manual for erosion and Finishes Schedule, specifically where new gardens are located adjacent to new turf areas. Tie once works have been completed. paint with 1:1 mix of an approved herbicide and water. kill weeds sediment control (Maroon Manual), good environmental practice and the consulting civil off edge ends perpendicularly to paths, kerbs, and path joints wherever possible. · Protection devices shall be monitored daily with a report generated weekly engineer's specification for erosion and sediment control. Penalties and fines for on their success, integrity and repaired as required. 2.0 - Large and Drill and fill or frilling. An approved herbicide is delivered Following weed non-compliance will apply. 5.0 Irrigation - If Intstalled · Vegetation protection fencing (refer Detail) shall be used to protect woody weed into sapwood via drilled holes or frill-cut pockets identification and · Install silt control fencing in accordance with site environmental management plan and local vegetation nominated for retention and protection. control immediately after wound is made. Use 'cut stump' as required to authority regulations. · Liaise with relevant NC authorities and obtain any approval as required. method if accessibility permits. Cut tree 30mm above kill weeds · Comply with government standards and co-ordinate with other trades. · Sediment and erosion control devices to be installed where necessary and as directed on site Performance · Protection device integrity. ground and paint stump with undiluted an approved by superintendent. · Check locations of penetration/conduits and install where required. Indicators · Retained vegetation and trees retained are good health with no earthwork herbicide. Remove waste materials from site. · All sediment and erosion control devices are to be installed in accordance with manufacturer's · Contractor to provide qualifications and insurances before construction. machinery scars. specifications. · Irrigation system is a 'Design + Build' system. 3.0 - Remove or Remove waste materials containing flowers or seeds or As required to · Any irrigation installed shall be for establishment only and shall be removed prior to the · The contractor is responsible for ensuring sediment and erosion control devices are inspected Frequency · Weekly inspection and log by responsible person as nominated civil site manage weed species from site that can shoot from pieces of remove or 'Off-maintenance' inspection. and maintained as follows; construction manager. vegetative waste plant and dispose of at approved facility. Cover waste manage waste a) During construction: Daily during dry weather, prior to predicted storm events, twice materials when removing from site. daily during prolonged rain Responsible · Contractor nominated agent to report to superintendent. b) During establishment period: Weekly during dry weather, prior to predicted storm Person Ecological Assessment Report - Documented Site Weed Species events, twice weekly during prolonged rain · Any declared plants under; · All stockpiles are to be protected with suitable erosion control devices and graded to ensure Reporting · As nominated in the contract and/or monthly and for contract separable · Land Protection Biodiversity Act 2014 and sub-ordinate Regulation 2016 control of runoff. portions reporting to site construction manager. · Planning Scheme Policy 2 Landscaping · Coordinate installation of sediment and erosion control devices with civil contractor to ensure · Biosecurity Plan 2020 pest plants listed in Schedule 1 part 3, Schedule 2 and compatibility and consistency in control measures. Corrective · Make good or replace any damage to trees or vegetation that are Non-scheduled invasive species are required to be removed plus the following weeds · All exposed surfaces, once completed shall be immediately stabilised to prevent erosion. Action designated for protection and retention, and reinstate protective devices as identified on-site; required. Ageratum houstonianum - Blue Billy Goat Weed Site Works Baccharis halimifolia - Groundsel · Remove all unwanted material, deleterious and operational debris from site. Tree Protection Corymbia torelliana - Cadaghi · If provided levels are not functional refer to the site superintendent and/or LA. · Install tree protection measures as per A.S.4970 and Detail as required. Celtis sinensis - Chinese Celtis · Civil engineering designs have provided a positively drained site. If there are drainage issues Cinnamomum camphora - Champhor Laurel refer site superintendent. Vegetation Removal Ipomoea cairica - Mile-a-minute · Refer to 2.0 Landscape Construction - Drainage for more information. · Retain native / endemic old growth tree hollows and suitably relocate and distribute for Ipomoea indica - Morning Glory nesting fauna. Lantana camara - Lantana Topsoil - Harvesting, Stockpiling, Amelioration Re-use and Spreading · Mulch all other native / endemic wood and leaf material, utilise on-site for revegetation Ligustrum lucidum - Tree Privet · Civil engineering earthwork operations will have harvested and stockpiled site topsoils. works where applicable and minimise weed seeds. Dispose of weed seeds, rootballs and Macroptilium atroprupureum - Siratro Landscape contractor to coordinate with civil contractor to ensure topsoil is re-installed per the debris off-site legally. Tidy up disturbed soil as specified herein. Ochna serrulata - Mick Mouse Plant following specifications in respective landscaping areas. · Mulch stockpiles <1000m³ / 2.5m H with 10m between stockpiles. Pinus elliottii - Plantation Pine · Stockpiled topsoil shall not be in any preserved vegetation areas or within three metres of · Where and if practical, translocate existing endemic ground flora affected by project Schefflera actinophylla - Umbrella Tree preserved vegetation driplines. · Topsoil stockpiling shall occur in an area adjacent to the stripped area(s) or area by engineer earthworksto denuded and horticulturally/climatically suited locations within revegetation / Schinus terebinthifolia - Broad Leaf Pepper Tree NOOSA COUNCIL drainage area. Species include; Acacia species, Grevillea robusta - Silky Oak and Senna pendula var. glabrata - Easter Cassia or owner which will not hinder visibility for inspection of the work. · Stockpile topsoil to ensure no ponding of water and positive drainage. Alphitonia excelsa - Red Ash Solanum mauritianum - Wild Tobacco APPROVED PLAN · Stablilise removal works against erosion. Spagneticola trilobata - Singapore Daisy · Install erosion control measures per engineer and above for stockpiled topsoil. · Landscape contractor to conduct soils analyses tests to stockpiled topsoils. Furnish LA with Syagrus romanzoffiana - Cocos Palm RAL23/0021 & OPW23/0177 Fauna Management Syngonium podophyllum - Arrowhead Vine results. Ameliorate site topsoils per recommendations prior to re-spreading. Landscape contractor to allow for pH balancing and nutrient ameliorations. All soil testing to be conducted · Install five permanent artificial nesting boxes in land dedication area (see Plans for proposed Typha latifolia - Cumbungi (confirm on-site variety if found, some Typha located below 16 JAN 2024 locations and Finishes Schedule for more information). site) by a NATA accredited lab. Zantedeschia aethiopica - Arum Lily NOTES: This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736). Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN Any reproduction or unauthorized use without written consent from Job No: 2391 Proposed Multi-unit Development Landscape Architecture, Urban Design, Land Planning Bird Landscape Design is strictly prohibited. 11C Church Street, Pomona, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia Do not scale from PDF plans. M: +614 7705 5222 LD1 Drawing Schedule, Specifications E: [email protected] 23.10.23 A For Application BB BB Sheet Title Sheet 1 of 7 Client: Zaccale Pty Ltd W: birdgolfdesign.com DATE ISSUE DESCRIPTION DRAWN CKD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.