Approved Plans - RAL23 0021 & OPW23 0177
Plans and drawings: the text below has words only, no drawings.
Very large file (101 MB): may take a few minutes to open.
7.0 Planting 8.0 Maintenance Tasks
Sheet Layout - Landscape Plans, Not to Scale
New Gardens · Maintain whole of landscape works for establishment period of 13 weeks or as in agreement
· See 1.0 Topsoil for cultivation and topsoil requirements. with Owner.
· Spread ameliorated site topsoil or A.S. 4419 imported organic topsoil to a depth of 300mm Irrigation and Watering
H
over prepared garden areas and trim. · Every day for the first two weeks (unless it rains adequately) O 92.4
92.2
· Crown garden beds 100mm H at centres to drain positively. · Every 2-3 days during the balance of the establishment period or as needed if hot and dry 94.6
92.0
· Mulch gardens and tubestock planted areas with LA approved A.S. 4454 imported organic (unless it rains adequately). .8
91 91.6
mulch as specified 100mm deep settled. Leave 20mm between top of mowing edge and · Once a week there after.
planting area mulching. If mulched areas are >1:4 sloped, install open weave pinned jute net Mowing
over mulch once settled. · First Mow - Once after 10 days if there is rapid growth or 14 days after installation.
91.6
92.0
91.8
91.4
92.2
91.2
92.4
91.4
91.6
91.8
91.8
91.6
91.4
92.8
92.6
92.6
93.8
94.4
94.2
94.0
93.6
94
.4
· All supplied topsoil and mulch to comply with current A.S. and free of weeds, seeds
(specifically Nutsedge), pests including fire ants and soil borne viruses and diseases.
· Mowing Thereafter - Once a week during summer, once every two weeks in spring and
autumn, and once a month in winter or as required if there is a lot of growth or as desired.
LP1 LP2
94
94.2
.2
.6
Weed Removal: As required to reduce competition and seeding.
91
.4
.6
91.2
91
.0
91
Tree Planting Plant Replacement: Immediately replace plants that die or fail to thrive, are damaged or stolen, 93
90
.8
.8
· Refer to street tree and tree planting details (as applicable) for information. with plants of the same species and of similar size and quality unless otherwise specified.
94
94.0
.0
· All trees to be certified to A.S. 2303:2018 'Tree stock for landscape use' and comply with this Stakes and Guys: Adjust and/or replace stakes and ties where required. Remove staking and
Church Street
89.4
90.4
specification. guying when instructed by the superintendent. G
89.6
90.6
93
· Landscape contractor to peg street tree positions for approval by superintendent before Re-mulching: As required to maintain a consistent depth, 100mm settled, until plants are
.8
93.6
93.4
93.2 91.0
90.8
93.0
89.8
92.8
excavation. established or Off-maintenance respectively.
· All trees to have a full and even crown. Monitoring: Provide a monthly report on completed tasks.
90.8
.2
91
· Install trees at locations indicated on the plans, per notes and details herein. 91.6
· Mulch tree gardens with minimum 1800mmØ collar of AS4454 organic mulch as specified Warranties
· Warranties or guarantees specified shall name the Owner as warrantee. Register with
Telstra
100mm deep settled. Do not mulch within 50mm of trunk / plant stem.
.35
91
Power
Telstra
HHY
· Edge trees per details. manufacturers as necessary. Retain copies delivered with and components and equipment to
HY Marker
Water
Water
· Install street tree drainage per detail if required by civil engineer or tree pits do not drain after the Owner.
Telstra WM
WM
WM
Power
Tel Water
Power
they are tested for drainage by filling with water prior to planting and backfilling. Landscape · Warranties and/or guarantees to be submitted to the Superintendent to deliver to Owner within 225PVC
Power
Telstra
contractor to furnish tree pit drainage rate per tree. fourteen (14) days after practical completion.
· Install street tree root barrier as specified. Landscape contractor to furnish rate per tree. · Commence Warranty periods at practical completion or at acceptance of installation, if Tel Power
· Tree staking - per details. acceptance is not concurrent with practical completion.
Wa .02
ter
90
· All trees to be located minimum; · If installation is not by manufacturer and product warranty is conditional on the manufacturer's
- 1000mm from back of kerb (or in-between kerb and footpath where applicable (allowing
for service setbacks) or as dimensioned on plans,
approval of the installer, submit the manufacturer's written approval of the installing firm. LP3
.30
94
NBN
MH HHY HY Marker
.55
95
- 1500mm from concrete paths and property connections Certifications
.19
96
- 2m from underground services (confirm locations on-site prior to pit excavation), Furnish LA with the following certifications prior to Practical Completion:
Mat
Mat
.55
horizontally and vertically from sewer lines, · A.S. 2303:2015 Tree Stock for Landscape Use
96
- 3m from adjoining, new, or perpendicular lot boundaries, driveway crossovers, · A.S. 4419 Topsoil
stormwater catch pits, power poles, and fire hydrants · A.S. 4454 Mulch
- 6m from overhead street lighting · Turf
General Planting Sources
· Refer to detail(s) herein respectively. · Survey: Max Waterson + Associates
· Supply and place plants according to plant schedule, plant setout notes and plan locations. · Civil Engineering: BAX Engineering
· Where discrepancies occur advise superintendent prior to planting. · Architecture: All Design and Drafting
· Ensure plants are placed and planted at equal centres, staggered, not in rows unless indicated
on plans.
· Mass and group plantings to be spaced evenly in a triangular pattern in odd numbered groups
to achieve optimum cover related to mature plant size and form.
· Shrubs and spreading groundcovers to be set back a minimum 800mm from roads, kerbs,
garden edges and paths to allow for mature plant form. Confirm with LA which require more
distance.
· All plants must be planted using one 'Agriform' 10g fertiliser tablet (N.P.K. 20-4.3-4.1) at a rate
of 1/140mm, 2/200mm, 3/300, 4/45 litre and above pot sizes, and one 5g tablet for tubestock.
Use phosphorous free tablets for Banksias, Grevilleas, and Callistemons.
· Excavate plant pit, cultivate subgrade to 150mm and scarify plant pit walls.
· Fill plant pit with water, allow to drain before planting. If pit does not drain within 24 hours,
notify superintendent and correct drainage.
· Soak plants thoroughly before removing from container.
· Remove plants from containers / bags / tubes carefully and inspect rootball, remove old matted
and coiled roots to expose young roots. All stock to be free of structural defects above and
below soil line (i.e. no girdled roots).
· Do not mix soil from hole with mulch and do not compact plant pit.
· Install fertiliser tablet(s), install plant, backfill plant with ameliorated site topsoil or imported
A.S. 4419 topsoil.
· Water plant in well and maintain soil moisture levels through E.P.
· Mulch bio-area basin batter areas with 25mmØ+ hoop pine, deleterious material free, 100mm
deep - settled. Install open weave pinned jute net over mulch. Do not mulch within 50mm of
trunk / plant stem and finish 20mm below hard surfaces.
· Mulch bio-area media with sugar cane mulch, uniform finish, free of deleterious materials and
weed seed (i.e. nut sedge), 100mm deep. Install pinned, open weave jute netting over mulch.
Tube Stock Planting
· Remove all weeds from planting areas. Level and trim per engineer's plans.
· Planting areas to be decompacted and cultivated 150mm deep.
· Install topsoil per specifications.
· Install plants per plant schedule densities, specifications, and details.
Tube Stock Planting for Bio-retention Areas and/or Bio-pods
· Remove all weeds from planting areas. Level and trim per engineer's plans.
· Planting areas to be decompacted and cultivated 150mm deep.
· Install topsoil per specifications. Filter media by civil contractor.
New Turfed Areas
· See 1.0 Topsoil for cultivation and topsoil requirements.
· Trim topsoil, fill depressions and provide even falls as indicated on drawings.
· Finished turf grades/contours shall be smooth and undulating, free from deleterious materials,
debris, large clods of soil, stones, and organic matter, positive flowing minimum 2% slopes and
no water holding areas. Co-ordinate on-site with LA and ensure levels are approved prior to
laying turf. Where turf meets hard edges, adjust finish topsoil levels to allow stormwater to flow
unimpeded over laid turf to low area respectively.
NOOSA COUNCIL
· Supply and lay 'A' grade turf per plans and schedules.
· Where turf is installed on slopes >20% pin turf to industry standards. Remove pins once turf is
APPROVED PLAN
well established.
· Water turf in well and apply water to maintain soil moisture until established.
RAL23/0021 & OPW23/0177
16 JAN 2024
Not to Scale
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2391 Proposed Multi-unit Development Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. 11C Church Street, Pomona, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
LD2 Specifications, Sheet Layout E: [email protected]
23.10.23 A For Application BB BB
Sheet Title Sheet 2 of 7 Client: Zaccale Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD North
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.