| MAX WATTERSON+ASSOCIATES CONSULTING SURVEYORS & PLANNERS 23" April 2021 Ref: 20/5179 Your Ref: RAL20/0021 The Chief Executive Officer Noosa Shire Council PO Box 141 TEWANTIN QLD 4565 Attention: Kerri Coyle Dear Madam, Re: Development Application for Reconfiguration of a Lot — 1 Lot into 18 Lots Lot 3 on RP113733 2 Pearsons Road, Cooroy Applicant: Vantralia Pty Ltd | refer to the above-mentioned matter, Council’s email of the 17% February 2021 regarding the issue of a mapped waterway outside of the riparian corridor and meetings with Council’s officers at Tewantin and at the site; and | respectfully supply the following information: Amended Plan of Proposed Reconfiguration Please find attached (in Appendix A) the amended Plan of Proposed Reconfiguration (Ref: 5179AN Rev B) of the proposed subdivision. The proposed Lots have been amended by the deletion of the Lots 16 & 17 adjacent to the waterway located on the northern side of the new road. Lot 15 has been altered to reflect the setback from the waterway and the bio basin. As a consequence of the deletion of Lots 16 and 17, the house Lot fronting Pearsons Road has been re-numbered Lot 16. The proposed development is now the Reconfiguration of 1 Lot to create 16 Lots and a Park. Amended Stormwater Management Plan Please find attached the amended Master Layout and Stormwater Management Plan prepared by Callaghan & Toth (in Appendix B). The Plan has been amended by: e The combined bio basin/detention basin has been deleted and replaced by offline bio pods and a separate grassed detention basin. e The pedestrian path has been re-located to suit the new location of the detention basin and a path crossing point added adjacent to where the path crosses the swale. PRINCIPAL 12 Maple Street (PO Box 639) Cooroy Q 4563 ABN 59 847 644 252 Max L. Watterson PH 07 5442 6121 Cadastral Surveyor (QId) FAX 07 5442 5125 B.Surv(UNSW). M.S.S.S.1 EMAIL [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 7 pages
Page 2
« The existing vegetated swale has been formalised as a 5 metre wide vegetated swale along the existing depression. The re-vegetation of the swale will be similar to the treatment of the gully located to the east of the site completed as a part of Stage 3 of the Erindale development. e Three indented car parks have been added to the works plans to compensate for the location of the bio pods in the foot[path. * The location of proposed driveway locations have been shown on the plan to permit the bio pods located along the footpath. It is proposed that the driveways are not constructed as a part of the Works of the development; however a property notation is created for each affected that stipulates the location of the driveway to serve the Lot. The deferral of the construction of the driveway until the construction of a dwelling will enhance the likelihood of the lack of damage of the driveway during dwelling construction and will permit individual owners to stipulate the surface of the driveway to accord with the driveway from the boundary to the house. Kerb adapters have been shown on the plans. ¢ Street tree locations have been added to the Plan. The proposed levels along the road have been amended to suit the drainage to the bio pods. ¢ The finished levels of Lots 14 and 15 have been amended sightly to suit the drainage of the Lots to the bio-basins. ¢ The underground stormwater drainage system has been altered to suit the locations of the bio pods and the outlet to the swale. e The footpath has been altered to run along the frontage of Lots 14 and 15 to’ permit the bio pods being located on the uphill side of the road. Integrated Water Management Plan Please find attached an amended Integrated Water Management Plan of the development prepared by Callaghan & Toth (in Appendix C). The Plan concludes that the proposed development can be treated by a stormwater management train consisting of a Bioretention basin and 4 roadside bio pods. Flood Assessment Report Please find attached an amended Flood Assessment Report of the development prepared by Callaghan & Toth (in Appendix D). The Report concludes that the proposed iots of the development will be adequately flood immune; even with a 20% impost upon the design to allow for the impact of future climate change. The proposed stormwater detention facilities are located outside of the Year 2100 1% AEP flood extent and the detention facilities provide sufficient volume for non- worsening of the peak 1-year discharge to the downstream waterway.
Page 3
Please note that this submission completes our response to the issue of the mapped watercourse at the site and we look forward to the issue of a Decision Notice of the Development Application. | thank you for your consideration in this matter. Yours faithfully MN Max Watterson
Page 4
APPENDIX A Plan of Proposed Reconfiguration of Lot 3 on RP113733 (Ref: 20-5179AN Rev B)
Page 5
b Scale 1:1000 - Lengths are in Metres
ltl | |
10 0 10 20 30 40 50 60 70 80 90 100 110
Denotes 15m x 10m rectangle
within 20° off true north
g
& Pathway
15
RP881300 14
8 |
RP881300 |
‘RP8B1300
13
RP881300 |
12
RP881300
peas
"881300 10
RP8B1300
1165m? )
931m? ex Et
SP305293
SP305293
42
SP305293
SP305293 40
‘SP305293 101
SP291337
Park
SP305203
spStoes
——= 4
tS
i \\\
[F
MAX WATTERSON
+ASSOCIATES
CONSULTING SURVEYORS
& PLANNERS
12 Maple Street
PO Box 639
Cooroy Qid 4563
Ph. (07) 54426121
Fax. (07) 54425125
Email. [email protected]
cient VANTRALIA PTY
LTD.
Project:
PLAN OF PROPOSED
RECONFIGURATION
OF LOT 3 ON
RP113733.
LOCAL GOVT: NOOSA S.C.
LOCALITY: COOROY
Scale: 1:1000 Flan) 20
batum: AMD Date: 18-09-2020
oven Baer | —ReE
Cont.Int: 0.5m 20-51 79AN
Rev. B
NOTE:
This plan has been prepared for application
purposes only and may be subject to change.
Dimensions and areas shown hereon are
approximate only and subject to final survey.
Rev A 10/11/20: Lot layout altered & 15m x
10m rectangles added.
Rev B 23/04/21: Lot layout altered.
Page 6
APPENDIX B Master Layout and Stormwater Management Plan prepared by Callagha’ & Toth (Drawing No. 2035-01, 02, 03 & 04 Rev E) n
Page 7
APPENDIX C Integrated Water Management Plan — Rev 3 prepared by Callaghan & Toth (Drawing No. 2035-01, 02, 03 & 04 Rev E)
Page 8
APPENDIX D Flood Assessment Report — Revision 3 prepared by Callaghan & Toth