Decision Letter - Change to an Existing Approval - 010.2005.00000698.003 [As Published]

of 7

Page text read automatically using OCR, there may be inaccuracies

                                                                                         2005/698

A.      Extend the currency period until 23 November 2009.
B.      Issue a Change to an Existing Approval.
In relation to your request to extend the currency period for the above development approval,
Council on 25 September 2009 decided to:
A.      Extend the relevant period until 23 January 2012.
B.      Issue a Change to an Existing Approval.

3     RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4     ASSESSMENT MANAGER CONDITIONS

1.    The development shall be carried out in accordance with Consultant drawing No. LGGG 850
      LA01C dated 19/05/06 prepared by Land Graphics or as modified herein.
2.    “This approval is for the landscaping of the mound along the Eenie Creek Road frontage,
      comprising:
      Stage 1 - Landscaping of the area located between the property boundary and the edge of
      Eenie Creek Road (within the Eenie Creek Road Reserve), which shall be completed prior to
      the commencement of any Building Works on site.
      Stage 2 - Landscaping of the area on the northern side of the property boundary (within the
      subject site), which shall be completed prior to commencement of the approved Use on site.
      All stages of landscaping shall be completed within the relevant period for this approval.”
3.    A further development application for Operational Works - Landscaping shall be submitted to
      Council for the Walter Hay Drive frontage of the site. No development permit for Building
      Works shall be issued for the site prior to the issue of the development permit for Operational
      Works - Landscaping for the Walter Hay Drive frontage of the site.
4.    All manholes, inspection pits and grates are to be raised to finish surface level and kept free of
      cover and be visible at all times to ensure prompt access in case of emergency.
5.    The landscape construction is to be implemented in accordance with horticultural industry best
      practices.
6.    All native plant species located in group plantings shall not be subjected to any hedging
      maintenance regimes.
7.    Prior to commencement of use, all areas of weed infestation located within the road reserve of
      Eenie Creek Road shall be removed in accordance with the Rehabilitation Schedule of works
      items 1, 2, 3, 4, 5, 6 and 7 at no cost to Council.
8.    The density of planting must achieve the set out requirements as detailed on the approved
      landscape plan.
9.    The applicant must ensure that all landscaping treatment does not unduly restrict/prevent
      access to service meters within the site.
10.   All trees must be located:
      10.1. a minimum of 1.0 metres from all services to prevent root/service conflict and to provide
            future ease of maintenance requirements
      10.2. a minimum of 2.0 metres from stormwater catchpits
      10.3. a minimum of 4.0 metres from all overhead street lighting


                                                                                       Page 2 of 7


[OCR of page images]
2005/698

 

A. Extend the currency period until 23 November 2009.
B. Issue a Change to an Existing Approval.

In relation to your request to extend the currency period for the above development approval,
Council on 25 September 2009 decided to:

A. Extend the relevant period until 23 January 2012.
B. Issue a Change to an Existing Approval.

3 RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4 ASSESSMENT MANAGER CONDITIONS

1. | The development shall be carried out in accordance with Consultant drawing No. LGGG 850
LA01C dated 19/05/06 prepared by Land Graphics or as modified herein.

2. “This approval is for the landscaping of the mound along the Eenie Creek Road frontage,
comprising:

Stage 1 - Landscaping of the area located between the property boundary and the edge of
Eenie Creek Road (within the Eenie Creek Road Reserve), which shall be completed prior to
the commencement of any Building Works on site.

Stage 2 - Landscaping of the area on the northern side of the property boundary (within the
subject site), which shall be completed prior to commencement of the approved Use on site.

All stages of landscaping shall be completed within the relevant period for this approval.”

3. A further development application for Operational Works - Landscaping shall be submitted to
Council for the Walter Hay Drive frontage of the site. No development permit for Building
Works shall be issued for the site prior to the issue of the development permit for Operational
Works - Landscaping for the Walter Hay Drive frontage of the site.

4. All manholes, inspection pits and grates are to be raised to finish surface level and kept free of
cover and be visible at all times to ensure prompt access in case of emergency.

5. The landscape construction is to be implemented in accordance with horticultural industry best
practices.

6. All native plant species located in group plantings shall not be subjected to any hedging
maintenance regimes.

7. Prior to commencement of use, all areas of weed infestation located within the road reserve of
Eenie Creek Road shall be removed in accordance with the Rehabilitation Schedule of works
items 1, 2, 3, 4, 5, 6 and 7 at no cost to Council.

8. The density of planting must achieve the set out requirements as detailed on the approved
landscape plan.

9. The applicant must ensure that all landscaping treatment does not unduly restrict/prevent
access to service meters within the site.

10. All trees must be located:

10.1. a minimum of 1.0 metres from all services to prevent root/service conflict and to provide
future ease of maintenance requirements

10.2. a minimum of 2.0 metres from stormwater catchpits

10.3. a minimum of 4.0 metres from all overhead street lighting

Page 2 of 7

Log in to download the original (Decision Letter - Change to an Existing Approval - 010.2005.00000698.003 [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.