Decision Letter - Change to an Existing Approval - 010.2005.00000698.003 [As Published]

of 7

Page text read automatically using OCR, there may be inaccuracies

                                                                                         2005/698

11.   The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines
      and the approved plan of Development.
12.   The area to be rehabilitated above the proposed car parking spaces for the retirement village
      shall also include a minimum of 50 plants listed in Schedule B, with the works to be pursuant
      to the development approval plans for the retirement village (04/5744).
13.   The finished level of all mulch in banks and batters is to be a minimum of 50mm below the
      level of the adjacent top of kerb or dish drain. All landscaping is to be constructed in
      accordance with Council’s Planning Scheme Policy PSP3 Landscaping Plants and Guidelines.
14.   A site control and/or compliance bond of $2000 is to be submitted to Council prior to the pre-
      start meeting. The pre-start meeting will only be held once Council's Construction Technical
      Officer has confirmation that the bond monies have been received by Council.
      The bond will be refunded less any costs incurred by Council in ensuring compliance with
      these conditions or any additional inspections incurred for substandard work or work
      undertaken not in accordance with this permit.
15.   Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’
      notice of intention to commence works to arrange a “pre start” meeting.
16.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy of
      Council’s signed approved drawings and conditions by the applicant.
17.   Please provide one copy (A3 size) of the approved plans and a copy of the job specifications
      for Council’s Construction Technical Officer.
18.   Council standards shall apply to these works unless otherwise modified herein.
19.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply, sewerage,
      footpaths, kerbing, landscaping, street furniture etc.) are protected against any damage or
      interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify the Manager-Land Development and shall forthwith rectify the damage to that
      property or facility at its cost and to the satisfaction of the Manager-Land Development, prior to
      the commencement of the use or, alternatively, the Applicant may request the Council to carry
      out the rectification work at the Applicant’s cost, such cost being paid by the Applicant to the
      Council prior to the commencement of the use, provided that in the case of emergency the
      Council shall be entitled to rectify such damage at the cost of the Applicant, such cost being
      paid prior to the commencement of the use.
20.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
21.   Construction work and other associated activities are permitted only during the hours of 7.00
      am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
      except where extended hours are approved by the Manager-Land Development or his
      nominee.
22.   All signage, including that for safety during construction shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act.
23.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines
      can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways.


                                                                                       Page 3 of 7


[OCR of page images]
2005/698

 

11.

12.

13.

14.

15.

16.

17.

18.
19.

20.

21.

22.

23.

The site is to be landscaped in accordance with Council's Policy on Landscaping Guidelines
and the approved plan of Development.

The area to be rehabilitated above the proposed car parking spaces for the retirement village
shall also include a minimum of 50 plants listed in Schedule B, with the works to be pursuant
to the development approval plans for the retirement village (04/5744).

The finished level of all mulch in banks and batters is to be a minimum of 50mm below the
level of the adjacent top of kerb or dish drain. All landscaping is to be constructed in
accordance with Council’s Planning Scheme Policy PSP3 Landscaping Plants and Guidelines.

A site control and/or compliance bond of $2000 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction Technical
Officer has confirmation that the bond monies have been received by Council.

The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.

Council's Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting.

Prior to the “pre start” meeting, the principal contractor must be provided with a copy of
Council's signed approved drawings and conditions by the applicant.

Please provide one copy (A3 size) of the approved plans and a copy of the job specifications
for Council's Construction Technical Officer.

Council standards shall apply to these works unless otherwise modified herein.

The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply, sewerage,
footpaths, kerbing, landscaping, street furniture etc.) are protected against any damage or
interference whatsoever.

If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify the Manager-Land Development and shall forthwith rectify the damage to that
property or facility at its cost and to the satisfaction of the Manager-Land Development, prior to
the commencement of the use or, alternatively, the Applicant may request the Council to carry
out the rectification work at the Applicant’s cost, such cost being paid by the Applicant to the
Council prior to the commencement of the use, provided that in the case of emergency the
Council shall be entitled to rectify such damage at the cost of the Applicant, such cost being
paid prior to the commencement of the use.

The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.

Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by the Manager-Land Development or his
nominee.

All signage, including that for safety during construction shall be in accordance with the
Manual of Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act.

Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines
can be issued if sediments from the site are found to enter or have the potential to enter
Council's stormwater system or natural waterways.

Page 3 of 7

Log in to download the original (Decision Letter - Change to an Existing Approval - 010.2005.00000698.003 [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.