Council archive · source document
Request for Further Information - 010.2008.00000176.001 [As Published] · 132008.176
-4-
All future Landscaping Drawings submitted for approval shall clearly demonstrate
compliance with this requirement.
Environmental Health
31. Demonstrate that vehicles associated with the collection of waste/recyclables can
enter and leave the site in a forward direction to access any off-street refuse-loading
areas.
32. A Waste Management Proposal Plan generally in accordance with Planning Scheme
Policy No. 9 “Waste Management - Multi-Dwellings and Commercial and Industrial
Premises” for the day-to-day operation of the development. It is critical that waste
areas are properly planned. A copy of Planning Scheme Policy No. 9 explaining
exactly how to predict waste quantities and design waste areas is available from
Council and the web. The Plan shall include the following information: -
32.1. The types of waste that will be generated from the activities approved within
the development.
32.2. Estimated volumes or tonnage of both recyclables and waste generated.
32.3. Methods to be used for dealing with garden waste.
32.4. Initiatives to minimize waste either by waste prevention, reduction, re-use or
recycling.
32.5. Description of procedures for getting all waste to the bins; the storage of bins
and the collection of bins by the contractor.
32.6. A description of the design details of waste storage and recycling areas
including size, location, elevation and floor plan, methods of bin washing and
system to prevent storm water getting into sewer via the bin wash.
32.7. A description of types and volume of waste storage containers to be used.
32.8. The waste and recycling storage area shall include the provision of containers
for all waste and recycling materials including putresable matter, non-recycling
waste, paper/ cardboard, glass, aluminum/steel cans, waste oil, styrofoam
boxes, etc, and bin washing facilities connected to sewer. Note: The
residential component is also required to have recycling facilities.
32.9. A detailed description of vehicular access to collect waste. Where collection is
off street, access must allow vehicles to enter and leave the site in a forward
direction.
33. Refuse chutes must be provided in accordance with Council’s Policy for “Refuse
Chutes and Accessories in Multi Storey Buildings”.
34. All liquid waste produced by the commercial section of the development is “Trade
Waste” and is to be treated as required under the Noosa Trade Waste Policy prior to
release to the sewer. Provide details of access to each grease arrestor for cleaning
and servicing purposes.
Note: Any car wash facilities will require pretreatment prior to connection to sewer
and must be roofed.
35. In relation to the kitchen facilities, supply details of:
35.1. Estimated maximum number of diners at the conference and restaurant areas,
35.2. Estimated area of the kitchen and food storage areas,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2008.00000176.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 19 KB (small file)
- File type
No other editions are linked here.