Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Engineering Services Report

Attached to the e-mail MCU16/0066 & OPW16/0133 - Engineering report & Stormwater Mgmt Plan (2 of 4).

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                  ENGINEERING SERVICES REPORT
Client: Hass Holdings ATF The Quasar Trust                                  Location: Taylor Court, Cooroy




                                             Site
                                             Area




          Figure 2 - Site Locality (image accessed from Nearmap on 11 August 2015)


The site is currently vacant land and was previously temporarily used as a depot for the upgrade of
the Bruce Highway. The site predominantly drains from north to south, with an approximate slope
of 5%.

3.0 PROPOSED DEVELOPMENT
The overall site area is approximately 8243m2, with the area of the proposed new development
utilising the site area available. The proposed development for a highway service centre includes
the service station bowsers, fast food outlet, service station, services, truck parking and associated
carparking and landscaped areas.

Site plans are located in Appendix A for further detail.

4.0 FLOODING
Noosa Council’s River and storm tide flood mapping accessed via the Council website indicts that
the proposed development site is flood free for all rainfall events up to and including an extreme
flood event.

5.0 EARTHWORKS
There are expected to be earthworks when cutting or filling building pads and carparks which are
typical of this type of construction development. However, no significant filling is anticipated within
the site boundary.

6.0     SITE ACCESS
The site is fronted by Holts Road to the north east and Taylor Court to the south east but will only
be accessed from the Taylor Street frontage. Suitable access provision has been provided at this
location in accordance with the requirements of the traffic Engineer as shown in Appendix A.



                                                    2
Log in to download the original file

Engineering Services Report.pdf · 6.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.