Engineering Services Report
Attached to the e-mail MCU16/0066 & OPW16/0133 - Engineering report & Stormwater Mgmt Plan (2 of 4).
ENGINEERING SERVICES REPORT
Client: Hass Holdings ATF The Quasar Trust Location: Taylor Court, Cooroy
Refer to Appendix A for the location of the fire storage tanks and Appendix C for Unitywater’s
DBYD Map.
10.0 ELECTRICITY AND COMMUNICATIONS
Based on Telstra Cable Plan and Energex DBYD Plan, Electricity and Communications exist within
the vicinity of the site, namely along Taylor Court. It is anticipated that there will be sufficient
capacity within the exiting electrical and communications networks to accommodate the increase in
demand.
Based on nbn.com.au accessed on 8th June 2016, the proposed development site can be
“connected to the nbn network via fixed wireless technology” (nbn co ltd, 2016).
Refer to Appendix D for Telstra Cable Plan and Appendix E for Energex DBYD Plan.
11.0 CONCLUSION
All engineering facets of the proposed development can be catered for. The development is
considered fit for use and increasing the yield on the already existing infrastructure is not
considered detrimental to any engineering functions. Further detailed design will be undertaken at
the operational works phase.
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.