Skip to the record
For the highest quality transcripts.

Original source · versioned page text

13. APP H. Engineering Services Report

Attached to the e-mail MCU14/0102 Development Application 4 of 4 App H Engineering, App I Water quality, App J Economic Needs, App K Local Code response..

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 43, section 1. The text section number identifies this passage in the reader.

SPECIFIC OUTCOMES, ACCEPTABLE SOLUTIONS AND PROBABLE SOLUTIONS
FOR THE EARTHWORKS CODE
SPECIFIC OUTCOMES                    PROBABLE SOLUTIONS             SITE COMPLIANCE

Drainage                             S1.1                           Complies – refer to the
O1                                   The finished surface           preliminary site grading
Finished surface levels              gradient of any filled or      plan.
ensure land is free draining         excavated area is within
                                     the range 0.5% to 1.5%
                                     and drains to Council’s
                                     stormwater infrastructure
                                     where available or where
                                     stormwater infrastructure is
                                     not available, toward the
                                     street.
Hydraulics                           No solution provided           Complies – the proposed
O2                                                                  development does not
Any change to the level of                                          result in any changes to
the land does not have an                                           the stormwater runoff
adverse flooding impact on                                          (including quality and
the flooding and drainage                                           quantity) to the site.
characteristics off-site.
Geotechnical                         S3.1                           Complies- the earthworks
considerations                       Filling works are              have been designed in
O3                                   undertaken in accordance       compliance with Noosa
Earthworks do not result in          with Section 2.8- Filling of   Council’s PSP5.
geotechnical instability on          Site of Council’s PSP 5 -
the premises or nearby               Engineering Design
premises.                            Standards- Roads and
                                     Drainage & Earthworks
                                     AND
                                     S3.2
                                     Where the filling is for
                                     residential commercial or
                                     industrial purposes the
                                     works comply with
                                     Sections 3 to 6 of AS3798-
                                     Guidelines for earthworks
                                     on commercial &
                                     residential development.




Eumundi Earthworks Code Compliance                                                             Page 1
Log in to download the original file

13. APP H. Engineering Services Report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.