Original source · versioned page text
13. APP H. Engineering Services Report
Attached to the e-mail MCU14/0102 Development Application 4 of 4 App H Engineering, App I Water quality, App J Economic Needs, App K Local Code response..
Original PDF page 44, section 1. The text section number identifies this passage in the reader.
Local amenity S4.1 Complies – a detailed
O4 The following control Construction Management
Earthworks do not cause measures are implemented Plan will be produced
disturbance to the amenity a) during the construction
of the neighbouring land. phase to ensure that there
regular water spraying of are sufficient dust control
exposed areas to suppress measures in place and that
dust; works are undertaken
b) during the appropriate
provision of dust stabilised hours.
or sealed internal roads;
c)
protective covering of
exposed areas that are left
for more than 2 weeks; and
d)
if there is no valid
development permit for the
site, disturbed areas are
revegetated using species
identified in PSP 3-
Landscaping Plants and
Guidelines;
AND
S4.2 Earthworks are
undertaken only during the
hours of 7am to 6pm,
Monday to Friday and 7am
to 6pm on Saturday. No
work is undertaken on
Sunday or public
holiday
Eumundi Earthworks Code Compliance Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.