Skip to the record
The only place to find full transcripts.

Original source · versioned page text

13. APP H. Engineering Services Report

Attached to the e-mail MCU14/0102 Development Application 4 of 4 App H Engineering, App I Water quality, App J Economic Needs, App K Local Code response..

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 44, section 1. The text section number identifies this passage in the reader.

Local amenity                        S4.1                           Complies – a detailed
O4                                   The following control          Construction Management
Earthworks do not cause              measures are implemented       Plan will be produced
disturbance to the amenity           a)                             during the construction
of the neighbouring land.                                           phase to ensure that there
                                     regular water spraying of      are sufficient dust control
                                     exposed areas to suppress      measures in place and that
                                     dust;                          works are undertaken
                                     b)                             during the appropriate
                                     provision of dust stabilised   hours.
                                     or sealed internal roads;
                                     c)
                                     protective covering of
                                     exposed areas that are left
                                     for more than 2 weeks; and
                                     d)
                                     if there is no valid
                                     development permit for the
                                     site, disturbed areas are
                                     revegetated using species
                                     identified in PSP 3-
                                     Landscaping Plants and
                                     Guidelines;
                                     AND
                                     S4.2 Earthworks are
                                     undertaken only during the
                                     hours of 7am to 6pm,
                                     Monday to Friday and 7am
                                     to 6pm on Saturday. No
                                     work is undertaken on
                                     Sunday or public
                                     holiday




Eumundi Earthworks Code Compliance                                                         Page 2
Log in to download the original file

13. APP H. Engineering Services Report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.