Log in to see the plans as drawnTypes of wastes expected to be generated from the aged care facility components on site include:
• Recyclable wastes (cardboard, packaging etc.);
• General waste including paper, packaging, shrink-wrapping, stationery;
• Other general waste; and
• Medical or Clinical wastes.
An estimate of quantities of wastes expected to be generated from proposed activities contained
within the operational phases of each of the stages of development is provided in the following
section. These quantities have been estimated using Appendix A of Noosa Planning Scheme Policy
9 – Waste Management.
Please note that applicable generation rates for a number of uses contained within the development
have not been provided for by Appendix A of PSP09. Council Officers were contacted to discuss
appropriate waste generation rates for these uses.
Required container sizes are calculated based on likely collection frequencies as described in
Section 3.1.2 of this report.
Stage 1A: Clubhouse Facility
Stage 1 of the proposed development contains are number of different components including 40
detached residential dwellings and a clubhouse facility consisting of a clubhouse with aquatic
facilities. Table 3.1 provides the waste generation rates calculated for each component of the
development.
Table 3.1 Clubhouse Facility Waste Generation Summary
Estimated Solid Estimated
No. Units / Quantity of Solid Waste
Waste Recycling
GFA Produced/week
Use Generation generation
General
Recyclable
Waste
0.39kg / m2 GFA / 0.095kg / m2 GFA
Kitchen 72m2 196.56kg 47.88kg
day / day
0.5kg / m2 GFA / 0.5kg / m2 GFA /
Bar 34.56m2 120.96kg 120.96kg
day day
Clubhouse / 0.25kg / m2 GFA / 0.25kg / m2 GFA /
Dining 208.49m2 364.85kg 364.85kg
Aquatic day day
Centre 0.022kg / m2 GFA 0.072kg / m2 GFA
Office 146m2 22.48kg 73.58kg
/ day / day
Salon 0.8kg / m2 GFA / 0.4kg / m2 GFA /
24.36m2 137.76kg 68.20kg
day day
Clubhouse / Aquatic Centre Subtotal 842.61kg 675.47kg
Stage 1b: Aged Care Facility
As previously identified, Stage 1b of the proposed development contains a 120 bed Aged Care
Facility including nursing stations, consultants rooms, kitchen and dining facilities. A breakdown of
Client: Palm Lake Works Pty Ltd
Doc No.: BE150106-RP-SWMP-01
Doc Title: Solid Waste Management Plan Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.