Original source · versioned page text
Appendix F - Amended Solid Waste Management Plan
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Table 3.3 Lawn Bowls Facility Waste Generation Summary
Estimated Solid Estimated
No. Units / Quantity of Solid Waste
Waste Recycling
GFA Produced/week
Use Generation generation
General
Recyclable
Waste
0.39kg / m2 GFA 0.095kg / m2 GFA
Kitchen 20.0m2 54.6kg 13.3kg
/ day / day
0.25 / per m2 /
Bar 0.35 / per m2 / day 18.5m2 14.875kg 45.32kg
day
Dining / 0.25kg / m2 GFA 0.25kg / m2 GFA /
139m2 243.25kg 243.25kg
Lounge / day day
Lawn Bowls Facility Waste Generation 312.72kg 301.87kg
Stage 4: Golf Room / Workshop and Tennis Court
The proposed Golf Room and Workshop are recreational facilities provided for use by residents of
the village. The Golf Room is expected to generate a small amount of waste. The workshop is
expected to produce a modest amount of general waste and small amounts of recyclable waste. For
the purposes of calculating the weekly volume of general waste and recyclable waste to be produced
by both uses, the Golf Room has been treated as a commercial business office (0.1kg / per 1m2 /
day general waste) and the Workshop is to be treated as a domestic house and hardware business
(0.3kg / per m2 / day general waste). Table 3.2 below provides the waste generation calculations for
the Golf Room and Workshop facility.
Table 3.4 Golf Room and Workshop Facility Waste Generation Summary
Estimated Solid Estimated
No. Units / Quantity of Solid Waste
Waste Recycling
GFA Produced/week
Use Generation generation
General
Recyclable
Waste
0.3kg / per m2 / 0.1kg / per m2 /
Workshop 142m2 297.6kg 99.4kg
day day
0.1kg / per m2 / 0.1kg / per m2 /
Golf Room 87m2 60.9kg 60.9kg
day day
0.1kg / per m2 / 0.1kg / per m2 /
Tennis Court - 60kg 60kg
day day
Golf Room and Workshop Waste Generation 418.5kg 219.4kg
Stages 1 – 6: Retirement Village Component - Detached Dwellings & Caretakers Residence
Stages 1 through 6 of the proposed development are comprised entirely of detached residential
dwellings. The detached dwellings contained within the retirement village component of the
development shall be treated as standard residential dwellings.
Client: Palm Lake Works Pty Ltd
Doc No.: BE150106-RP-SWMP-01
Doc Title: Solid Waste Management Plan Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.