Original source · versioned page text
Appendix F - Amended Solid Waste Management Plan
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn8.3 Indoor waste storage areas must –
a) Be well ventilated
b) Be well lit; and
c) Have hazardous waste and no smoking signs installed.
9.0 Design Standards – Vehicle Access
9.1 Within the development site –
a) Design specifications must be sufficient to carry a wheel load of 7 tonnes per axle;
AND
b) Turning circles are designed in accordance with AUSTROADS: design dingle unit truck/bus
(12.5m) template;
AND
c) Vehicles must be able to move in a forward direction at all times or be able to enter and exit
the development in a forward direction; or
d) A turning bowl or a “T” or “Y” shaped manoeuvring area is provided, which allows the vehicle
to turn with no more than a three-point turn;
AND
e) For a bin collection from within a building or structure –
f) Height clearance must be sufficient to allow for safe travel and lifting for vehicles and bins;
and
g) The grade of access/egress ramps must not exceed 1:8.
All bin store areas and bin store rooms are to be designed in accordance with the above provisions.
This section details the bin store areas and waste container storage rooms provided for each stage
and component of the development and also nominates waste collection points and applicable
service vehicles.
The Traffic Impact Assessment (TIA) prepared for the proposed development by Calibre Consulting
has assessed the internal road network for the retirement community with regard to the provision of
appropriate access for refuse collection services. The report concludes that the vehicle turning
templates confirm that functional access arrangements to all service areas has been provided within
the site.
For further detail regarding the assessment of the access and servicing of the retirement community
by Refuse Collection Vehicles (RCV’s) reference should be made to the Traffic Impact Assessment
prepared by Calibre Consulting.
Client: Palm Lake Works Pty Ltd
Doc No.: BE150106-RP-SWMP-01
Doc Title: Solid Waste Management Plan Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.