Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Appendix F - Amended Solid Waste Management Plan

Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Stages 1-6: Residential Dwellings

As previously identified, all residential dwellings to be constructed within the retirement village will
be provided with a single 240L general waste bin and a single 240L recyclable waste bin. The
servicing of residential dwellings located within Stages 1-5 is to be undertaken from the
corresponding street frontage. Residents shall be responsible for the transfer of bins from their
storage point to their servicing point.

The 10 lots included within Stage 6 of the development, are to be serviced from common servicing
points located adjacent to the Caravan Storage area. Servicing the Stage 6 lots via their
corresponding road frontage by the service waste vehicle is not possible due to the vehicle not being
able to navigate the proposed 4m road widths.

Given the likely age Stage 6 patrons, there is the potential that they may be unable to move wheelie
bins to the identified servicing location. As such, it is recommended that a service be offered to Stage
6 residents for the transfer of wheelie bins to and from the identified temporary servicing points for
servicing.




          Temporary Servicing Point
          Haulage path

                          Figure 3.7 Stage 6 Temporary Waste Servicing Points

Additionally, a swept path analysis has been completed in order to demonstrate that the lots
contained within Stage 6 can be serviced by the service waste vehicle. An extract taken from the



Client:    Palm Lake Works Pty Ltd
Doc No.: BE150106-RP-SWMP-01
Doc Title: Solid Waste Management Plan                                                       Page 25
Log in to download the original file

Appendix F - Amended Solid Waste Management Plan.pdf · 4.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.