Appendix F - Amended Solid Waste Management Plan
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawncompleted swept path analysis is provided below as Figure 3.8. To view the full swept path analysis
completed for stage 6, please refer BE150106-00-SK001-A contained in Appendix C of this report.
Figure 3.8 Stage 6 Swept Path Analysis for Service Waste Vehicle
Please note that all residents of the development shall be informed that additional green waste bins
can be acquired from Council for an additional annual fee.
It is recommended that in the initial operational stages of the development, the waste management
system be monitored closely to ensure that the bins provided on the site are suitable for the amount
of waste generated. The waste generation calculations within this report are considered
conservative, and therefore it is possible that smaller sized bins may be adequate to meet the needs
to the development. If additional refuse storage is required, collection frequencies should be
increased in accordance with provisions prescribed by PSP09: Waste Management.
Client: Palm Lake Works Pty Ltd
Doc No.: BE150106-RP-SWMP-01
Doc Title: Solid Waste Management Plan Page 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.