Original source · versioned page text
Appendix F - Amended Solid Waste Management Plan
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn5. Monitoring
All Facility Management should consider the adoption of a waste auditing and monitoring program
to monitor and document:
• Quantity of wastes being produced;
• Quantity of waste materials being recycled and reused on site; and
• Ongoing performance of recycling and reuse programs.
Monitoring and auditing of these programs is expected to enable the client to assess the relative
success or failure of such programs. In addition, by monitoring and auditing, the client can identify
potential opportunities to improve processes and potential economic savings pertaining to these
programs (i.e. reduce frequency of bin collection).
Client: Palm Lake Works Pty Ltd
Doc No.: BE150106-RP-SWMP-01
Doc Title: Solid Waste Management Plan Page 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.