Original source · versioned page text
Appendix F - Amended Solid Waste Management Plan
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTable 3.7 Lawn Bowls Facility Refuse Bin Summary .................................................................... 17 Table 3.8 Golf Room and Workshop Refuse Bin Summary .......................................................... 17 Table 4.1 Design Rules for Clinical and Related Waste Containers (Schedule 7A of the Environment Legislation Amendment and Repeal Regulation (No. 1) 2014) ...................................................... 28 Figures Figure 1.1 Site Locality Plan (Courtesy: Noosa Interactive Mapping). ............................................ 4 Figure 1.2 Aerial Photograph (Courtesy: Noosa Interactive Mapping). ........................................... 4 Figure 1.3 Proposed plan of development. ..................................................................................... 6 Figure 2.1 Waste Management Hierarchy (source: Queensland Waste Avoidance and Resource Productivity Strategy 2014) ............................................................................................................. 9 Figure 3.1 Clubhouse / Aquatic Centre Facility Bin Storage Room and Servicing Point ................ 20 Figure 3.2 Clubhouse Centre facility Temporary Servicing Point ................................................... 21 Figure 3.3 Aged Care Facility Bin Store Area and Servicing Point ................................................ 22 Figure 3.4 Lawn Bowls Facility Bin Store Area and Servicing Point .............................................. 23 Figure 3.5 Golf Room and Workshop Facility Bin Store and Servicing Point ................................. 24 Figure 3.6 Golf Room / Workshop RCV Swept Path Analysis (Courtesy: Calibre Consulting) ....... 24 Figure 3.7 Stage 6 Temporary Waste Servicing Points ................................................................. 25 Figure 3.8 Stage 6 Swept Path Analysis for Waste Service Vehicle .............................................. 26 Appendices Appendix A – Plan of Development Appendix B – Staging Plan Appendix C – Stage 6 Swept Path Analysis Client: Palm Lake Works Pty Ltd Doc No.: BE150106-RP-SWMP-01 Doc Title: Solid Waste Management Plan Page vi
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.