Original source · versioned page text
Appendix F - Amended Solid Waste Management Plan
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn1. Introduction
Burchills Engineering Solutions (BES) was engaged by Palm Lake Works Pty Ltd to prepare a Solid
Waste Management Plan to accompany a Material Change of Use (MCU) Development Application
(DA) for the proposed Retirement Village / Aged Care Facility at Trading Post Road, Cooroy properly
described as Lots 1 & 4 on RP215922 and Lots 1 & 2 on RP165418.
The application proposes the establishment of an Aged Care Community consisting of six (6)
separate stages, including 230 independent dwellings, community facilities (clubhouse, aquatic
facilities, bowling green, workshop and golf room), Caretaker’s facility and a 120 bed Aged Care
facility. Access to the subject site is gained from Caloundra Road. The Preliminary Layout Plan
prepared by Palm Lake Works for the proposed development is included in Appendix A.
This version of the Solid Waste Management Plan has been prepared in response to a Request for
Further Information issued by the Noosa Shire Council on 13 December 2017. The RFI relates
specifically to the proposed Stage 6 extension, which shall result in the construction of ten (10)
additional lots.
Item 10 of the issued RFI relates specifically to the servicing of the Stage 6 extension by a waste
service vehicle. Item 10 is as follows:
Issue:
Waste Management
Information Required
11. Provide updated waste management plan for Palm Lake site that includes the added site of
the proposed 10 Units. The waste management plan must demonstrate that all internal roads
are adequate for the manoeuvring of Council’s Refuse trucks to collect garbage from the
individual units or from allocated collection points within the site. The plan must show the
paths of travel of the Refuse Truck within the site and the entry and exit points into the
Council’s road network.
1.1. Purpose and Scope
The purpose of this SWMP is to outline the waste management provisions included within the
development to demonstrate the efficient, safe and sustainable management of waste during the
operational phase of the development. The report has been prepared to address the requirements
of The Noosa Plan, in particular Division 19 – Waste Management Code and its supporting
documents, Planning Scheme Policy 9 – Waste Management (PSP09 – Waste Management) and
Noosa Planning Scheme Policy 11 – Waste Management Plans (PSP11 – Waste Management
Plans).
As identified in The Noosa Plan: Division 19 – Waste Management Code, the outcomes sought by
the waste management code are:
a) The storage, disposal and management of solid and liquid waste are conducted in a safe and
ecologically sustainable manner and without environmental nuisance;
Client: Palm Lake Works Pty Ltd
Doc No.: BE150106-RP-SWMP-01
Doc Title: Solid Waste Management Plan Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.