16003 - Stormwater Quantity Assessment Letter - 17-09-20 · OPW17/0554

Attached to the e-mail Operational Works Application OPW17/0554.

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                        MORGAN CONSULTING
                                                                       E NGINEERS P TY LTD
                                                                                  16003/CG
                                                                                      Page 3




Figure 2: XP-RAFTS Pre Development Model

Table 1 summarises the input parameters used in the XP-RAFTS pre development model for
each of the nodes described above. Pervious and impervious areas were measured from the
detailed survey plan for the site. The detailed survey of the site was used to determine the
vectored slope while aerial photos and findings from the site visit were used to determine
the Manning’s n for each of the sub-catchments.

      Table 1: XP-RAFTS Source Node Parameters

                                                 Pre Development
                           Parameter
                                              Pervious    Impervious
                                             Catchment    Catchment
                        Initial Loss (mm)        10           0
                         Continuous Loss
                                                 2.5           0
                             (mm/hr)
                          Manning's "n"        0.035        0.015
                         IFD Coefficient       Noosa        Noosa
                       Storage Coefficient      1.0          1.0


No input parameters were used for the nodes representing the existing drainage
infrastructure within Resort Drive at each of the drainage outlet points. The legal point of
discharge for the site, Resort Drive and contributing catchments is represented by the LPD
node at the end of the model.

Table 2 summarises the pre development 1 year ARI storm peak discharges calculated by XP-
RAFTS.

Used in these records

About this file

File size
5.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

16003 - Stormwater Quantity Assessment Letter - 17-09-20.pdf · 5.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.