      Table 2: XP-RAFTS Pre Development Peak Discharge
                                        XP-RAFTS Peak Discharge
                    Catchment
                                                  (m3/s)
                                                  0.286
                        A
                                            (1yr 60min storm)
                                                  0.094
                        B
                                            (1yr 25min storm)
                                                  0.736
                        C
                                            (1yr 60min storm)
                                                  1.103
                       Site
                                            (1yr 60min storm)
                                                  1.582
                       LPD
                                            (1yr 60min storm)

Refer to the attached pre development peak flow rate hydrographs from XP-RAFTS.

      2.2 Post Development

The catmint details in the XP-RAFTS model from Figure 2 were amended to represent the
ultimate post development site conditions. Refer to the enclosed Precinct F Post
Development Catchment Plan for the catchment details.

The model input parameters summarised in Table 1 have been used for the XP-RAFTS post
development model for each of the nodes as described above. Pervious and impervious areas
were measured from the detailed design plans for the site. The detailed design plans were
used to determine the vectored slope and the Manning’s n for each of the sub-catchments.

Table 3 summaries the post development 1 year ARI storm peak discharges calculated by XP-
RAFTS.

      Table 3: XP-RAFTS Post Development Peak Discharge
                                        XP-RAFTS Peak Discharge
                    Catchment
                                                  (m3/s)
                                                  0.316
                        A
                                            (1yr 25min storm)
                                                  0.186
                        B
                                            (1yr 25min storm)
                                                  0.683
                        C
                                            (1yr 60min storm)
                                                  1.184
                       Site
                                            (1yr 25min storm)
                                                  1.709
                       LPD
                                            (1yr 25min storm)

Used in these records

About this file

File size
5.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

16003 - Stormwater Quantity Assessment Letter - 17-09-20.pdf · 5.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.