Table 2: XP-RAFTS Pre Development Peak Discharge
XP-RAFTS Peak Discharge
Catchment
(m3/s)
0.286
A
(1yr 60min storm)
0.094
B
(1yr 25min storm)
0.736
C
(1yr 60min storm)
1.103
Site
(1yr 60min storm)
1.582
LPD
(1yr 60min storm)
Refer to the attached pre development peak flow rate hydrographs from XP-RAFTS.
2.2 Post Development
The catmint details in the XP-RAFTS model from Figure 2 were amended to represent the
ultimate post development site conditions. Refer to the enclosed Precinct F Post
Development Catchment Plan for the catchment details.
The model input parameters summarised in Table 1 have been used for the XP-RAFTS post
development model for each of the nodes as described above. Pervious and impervious areas
were measured from the detailed design plans for the site. The detailed design plans were
used to determine the vectored slope and the Manning’s n for each of the sub-catchments.
Table 3 summaries the post development 1 year ARI storm peak discharges calculated by XP-
RAFTS.
Table 3: XP-RAFTS Post Development Peak Discharge
XP-RAFTS Peak Discharge
Catchment
(m3/s)
0.316
A
(1yr 25min storm)
0.186
B
(1yr 25min storm)
0.683
C
(1yr 60min storm)
1.184
Site
(1yr 25min storm)
1.709
LPD
(1yr 25min storm)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
16003 - Stormwater Quantity Assessment Letter - 17-09-20.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.