Skip to the record
Beware of cheap imitations.

Council archive · source document

16003 - Stormwater Quantity Assessment Letter - 17-09-20 · OPW17/0554

Attached to the e-mail Operational Works Application OPW17/0554.

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                        MORGAN CONSULTING
                                                                       E NGINEERS P TY LTD
                                                                                   16003/CG
                                                                                          Page 6




       Table 4: XP-RAFTS Pre and Post Development Minor and Major Storm Peak Discharges
                                Pre Development            Post Development
             Scenario       XP-RAFTS Peak Discharge     XP-RAFTS Peak Discharge
                                     (m3/s)                      (m3/s)
            10 Year ARI              3.469                       3.399
            100 Year ARI             4.637                       4.548
              Overland               1.168                       1.149

Refer to the attached pre and post development peak flow rate hydrographs from XP-RAFTS.

As seen in Table 4, there is a small decrease in the overland flow expected through the
overland flow easement in the adjacent development at Noosa Springs Resort. As there is no
increase in the overland peak flow, there will be no worsening of the existing conditions.

3.0 Conclusion

Based on the analysis in this letter, it has been confirmed that there is a minor increase in
the 1 year ARI storm event flow from the site, however this minor increase will be mitigated
by the storage provided within the extensive pipe network, bio-retention basin and swale
within the site. The XP-RAFTS hydrographs confirm that the time to peak is approximately
14 minutes which lines up well with the master drainage report and Noosa Springs Resort
drainage concept.

It has also been confirmed that the existing stormwater infrastructure and property
connections for the site within Resort Drive have been designed and have sufficient capacity
to cater for the post development 10 year ARI event flows from the site. An analysis of the
10 year and 100 year ARI event flows confirmed that there is a slight decrease in the
overland flow expected at the sag in Resort Drive. Therefore there is no worsening of the
existing overland flow conditions.

Please contact me if you have any further queries on (07) 3369 8411.

Yours faithfully,

M ORGAN C ONSULTING E NGINEERS P TY LTD




Henry Morgan        RPEQ 11950
Director

Used in these records

About this file

File size
5.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

16003 - Stormwater Quantity Assessment Letter - 17-09-20.pdf · 5.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.