MORGAN CONSULTING
E NGINEERS P TY LTD
16003/CG
Page 5
Refer to the attached post development peak flow rate hydrographs from XP-RAFTS.
As seen in Table 2 and Table 3 there will be a net increase in the 1 year ARI event flow from
the site of 0.081m3/s. This increase is considered minor when compared to the total site 1
year ARI event flow. Although there is a minor increase in flow, it should be noted that the
site is 51% impervious which is generally in keeping with the 50% imperviousness assumed in
the master drainage plan report. The pipe drainage infrastructure in Resort Drive and the
stormwater property connections to the site have been designed for the minor (10 year ARI)
storm event so that the minor net increase estimated above can be accommodated. It
should also be noted that the XP-RAFTS model has not taken into account the storage
provided in the bio-retention basin within Catchment A, the long swale within Catchments A
and C or the extensive pipe network throughout the site.
Based on the above, there is sufficient capacity within the existing drainage network and
opportunities for storage on site to cater for the minor net increase in the 1 year ARI flow
from the site, satisfying Condition 47(a).
Further to the above, a review of the post development peak flow rate hydrograph at the
LPD confirms a time to peak of approximately 14 minutes which is in line with the mater
drainage plan report which indicated 15 minutes. The post development XP-RAFTS model
confirms that Condition 47(b) is satisfied.
2.3 No Worsening Assessment
In order to satisfy Condition 48 and ensure the stormwater drainage system collects and
discharges in a manner that does no harm to the receiving natural and built environments it
has been confirmed using PC Drain that the property connections for the site can cater for
the post development minor (10 year) ARI storm event flow. Refer to the Operational Works
submission package for the pipe drainage longitudinal sections.
Resort Drive has a sag due east of the cul-de-sac. All stormwater flow in excess of the minor
ARI storm event will flow to this point where it will overtop the kerb and flow through the
overland flow path provided for the Noosa Springs Resort Development.
Table 4 summarises the pre and post development minor and major year ARI storm peak
discharges calculated by XP-RAFTS for the site and Resort Drive and the overland flow
expected at the sag.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
16003 - Stormwater Quantity Assessment Letter - 17-09-20.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.