INTEGRATED PLANNING ACT 1997

      

 

[sc §(3) of the IPA prescribes that an,

ele
application must contain; of be supported by, hel, a .

written consent of the fan owners if he epptcaton @ *

involves: *

(i) .. a material change of use:

Mi reconfiguration of a jot,

* Giiy work on land below high-water mark & fot within a
«, canal as defined under the Coastal Protection and

. Management Act 1995.01 2?

{iv} work on rail corridor land defined under the

Transport Infrastructure Act 1994. +

 

| Section 3.8.1(2Na) of the PA provides that

“tandowner's consent Is fet required for a mobile or

temporary ERA.
For more infomation refer to Guide 14,

 

_7

 

| 20. Land owner's consent to the making of this application:: -..

=

Part A, Version 2.4, 29 May 2006

 

 

 

Signatyre

 

 

 

(Lal Fa peison

 

 

  

 

 

 

: Resource entitlement ( {ita licable)

Section 3.2:4(5) of the IPA requires evidence of
resource entitlement be given for. applications that
qi ed State resource.
g + Section 4.2. 4 19)¢€)H} of ine IPA] préséribes that an. 4
; application cannot be taken to be properly madé
without evidence of the sesource entitlement. *
Advice for cor ie it “
Refer to schedule 10-of the Jntegrated Planniig
Regulation 1998 that preseribes the natura of evidence
| sequired by the Slate in support of the *tecaing of thls

1 deyeloprjent pplealion. + . y

 

 

   

  

Advice for c ing Q23

The information in (i) ~ (v} is mandatory if evidence is

“required under Q22 (il) oF (ii) above.

“The ‘official stamp of the Department of Natural
‘Resources, Mines and Water Is mandatory where the |
a + application involves any water or riverine quarry

4 material under the Water Act 2000.

+ Section 3.2.1(5A) aBows the resource manager to limit

the time the evidence may be used, Q23 {vi} mus! be

completed if the evidence is time limited.

Assessment triggers .

This checklist dees not epply if the application requires

the completion of Parts A and 8 of the Form only. i
Must be completed for all other applications.

  
   

«gia

 

to 023

‘entitlement to, the resource - go to. 023

23. Evidence of the resource entitlement: ‘

a)” Resourcé entitlement / = details
(ii) Name of cease officer
(iii) Position of cela officer - %

(v)

(v)

(vi) _ date of evidence a :

24. we IDAS Assessment Checklist‘completed and attached to this application?
YES

Signature of delegated officers

 

 

 

 

Date

 

(vii) Official stamp of the department
administering the resource (if

‘development application may proceed i in the absence of an allocation of, or

applicable) .

‘ Does this application, involve a‘State resource prescribed under a regulation (other than invobing |
aterial on State coastal fand under the Coastal Protection and Management Act 1 996)? 2
2 * 2

  
 
 
    

eveloment is consistent with an allocation of, or entitlement to, the resource - ~go~

 
 
   

 

 

 

 

 

0 NO - the assessment manager may refuse to accept this application on the
grounds tf that the application hag. not been properly made

 

Plans / drawings / reports

An application should be accompanied by details to
support the proposal & enable the assessment
Manager, relerrat agencies and any person viewing
the application during public scrutiny or public
Notification to understand the scope of the proposal
and any potential impact. .

EN

 

PLEASE NOTE: The assessment manager may refuse to accept an application thal, at the time of lodgement, fails to provide all applicable information required by Part A

25. Plans/drawingsireports accompanying | this application:

 

Pian/ Drawing / Report Number

Title

 

(iv)

 

 

 

 

  

 

 

and any other relevant part of Form 1.

OFFICE USE ONLY {applicable to assessment manager's)

frees) 1)" "DATE

-

    

 

Date ofengagement: { /

_ RECEIVED
iNotification of Engagement of Private Certifi ler (Optional forma’) =
Council: thave been engaged as the private certifier for the building work referred to in this application,

Accreditation Number:

 

RECEIVING OFFICER'S ERs |

Name:

| REFERENCE
NUMBERS , |

Signature: «

 

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0399 - Preliminary Building Work assessable against the Planning Scheme 103 Noosa Dr [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.