Skip to the record
Accept no substitutions.

Council archive · source document

07/0399 - Preliminary Building Work assessable against the Planning Scheme 103 Noosa Dr [As Published] · 172007.399

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

»

    

Material change of use

assessable against a local government’s planning scheme

Part D, Version 2.0, 4 October 2004

Form 1 Development Application

_—
<
a.

 

 

Completion of all applicable questions on Part Dis mandatory for all applications involving assessment of a
materiat change of use (MCU) assessable against a local governments planning scheme.

 

Nature of the application

A development permit authorises
development to occur, while a preliminary
approval is a step in the approval process
and does not authorise development to occur.

1.

This application is for: (tick 1 or both if applicable}

(2) Preliminary approval for a material change of use of premises including conceptual
design for any associated works that require approval! under the planning scheme (ie.
consideration of the proposal concept)

AND/ OR

evelopment permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(if applicable)

 

The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
For the dafinition of “gross floor area” go to
the planning scheme against which the RK ESIDENT (At ‘4
application will be assessed,
3. Existing gross floor area: (if appticabto) | : |
4. Are there any existing easements on the land?
C] No
. (2) YES - attack plans of the focation and details of the purpose of the easement
Material change of use details |5. Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment building,
. vacant land to industry (tyre manufacturing) etc.) |
[| Boumore-y RELAXATION To ExiSmNéE Dwele G |
6. Number of employees: [ np aw ' |
7, Operating days and hours: | n/a : |
Associated building works details (if | 9 Site cover: 2o1. 5 me
applicable) ms ‘
For the definition of *site caver’, “gross floor at
area’ and “storey” go to the planning scheme Gross floor area: 220-2 m
against which the application will be 4 .
sessed. PP 10. Number of on-site car parking spaces: [ 2. CO
11. Number of storeys / maximum height above natural ground:
13. Hours and days the use will operate | n [A - |
. Associated operational works details | 14. Details of associated operational works (ag. landscaping, cut and fil, drainage, road works efc.}

 

LL ivla

 

 

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information

 

requested by Part A and any other relevant part of Form 1.

 

 

 

OFFICE USE ONLY applicable to assessment manager) -

 

‘DATE RECEIVED |

 

"REFERENCE ~
NUMBERIS | | |

 

 

 

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0399 - Preliminary Building Work assessable against the Planning Scheme 103 Noosa Dr [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.