Minor Change Existing Approval - 51996 1942 01 (As Published)
13. The footpath across the frontages of the site is to be upgraded by the provision of a 1.2
metres wide concrete footpath and the forming, grassing and topsoiling of the remaining area
to the standards and requirements of the Shire Engineer. The applicant is to contact Council’s
Engineering Department to determine the footpath alignment prior to the commencement of
any works.
14. The developer shall bear the cost of alteration of any public utility or other facilities
necessitated by the development of the land or associated construction works external to the
site.
15. Connection to Councils existing water supply and sewerage reticulation system at the
developer’s expense to the standards and requirements of Council’s Shire Engineer.
16. The developer shall provide metered water connections from the water supply system to the
proposed development, in accordance with Council’s standards and to the satisfaction of the
Shire Engineer.
17. Roof and surface water is to be collected on site and is to be discharged through a single
underground drain line into existing drainage in Gibson Road to the satisfaction of the Shire
Engineer. A Building Approval shall not be granted until the Shire Engineer has approved of
the drainage scheme.
18. The storage of any machinery, materials or vehicles is to be aesthetically screened so as not
to be visible from any road which it has frontage, to the reasonable satisfaction of the Shire
Planner.
19. The footpath and setback areas are to be kept clear of goods, signs and street furniture not
approved by Council.
20. Submission of a cash bond or trading bank guarantee to the sum of $5,000 to secure
performance of conditions, prior to the issue of Building Approval. The cash bond or trading
bank guarantee will be returned upon performance of the conditions of approval.
21. The provisions of this approval are to be effected, prior to the commencement of the
approved use. Council reserves the right to call upon the bond or guaranteed sum referred
to in this approval to effect compliance with conditions.
22. This approval lapses where: -
22.1. The use or erection of a building or other structure associated with the use, has not
been commenced within two (2) years of the date of the issue of the approval, unless
application is made and approved by Council for an extension; or
22.2. The use of any premises to the approval ceases for a period of twelve (12) months.
Page 3 of 6
Document Set ID: 24824333
Version: 4, Version Date: 29/05/2026