08/1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Properly Made) [As Published] · 142008.1704

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

168 FLINDERS STREET EAST
TOWNSVILLE QLO 4810

 

 

 

 

 

 

PO BOX 1984
TOWNSVILLE QLO 4810 ;
P (07) 47270100 i =]
'F (07) 47270150 ar
emanate i € [email protected] Sr
LEGAL
Our Ref: PRC:KMG:080471:1127.01
Your Ref:
28 November 2008 RECEIVED
2 Now 2008
Sunshine Coast Regional Council Lica nnet
Planning and Development Services Dre
PO Box 141

TEWANTIN QLD 4565

Attention: Denise Wallace

Development: 30 Noosa Parade, Noosa Heads

Development Application: Operational Works Application for Prescribed Tidal Works
(Development Application)

Lot 14 Crown Plan N21842 (Land)

We refer to your letter dated 26 September 2008.

Development Application

We note Council has advised that the application was not properly made, pursuant to
section 3.2.1(6) of the integrated Planning Act 1998 (IPA).

Strand Gardens submits an application for Operational Works for Prescribed Tidal Works.
Please refer to Attachment One for the following:

. IDAS Assessment Checklist

° IDAS Part P

e IDAS Part E

We enclose a cheque for the additional amount of eight hundred and ninety dollars
($890.00) being the difference between the previous amount paid and the prescribed fee for
a Development Application of this nature.

Evidence of Resource Entitlement

Strand Gardens has obtained allocation for Resource entitlement from the Environmental
Protection Agency (EPA) (refer to Attachment Two) in accordance with Kidd and Co

drawing WD 202(2) and WD 701(1) (refer to Attachment Three).

The plans have been amended to minimise the width of the regatta stairs to the same width
of the pontoon.

We note EPA supports the Development Application.
Full text of the other 24 pages

Page 2

 

 

 

Sunshine Regional Coast Council Emanate Legal =:
Attention: Denis Wallace 28 November 2008 =
PRC:KMG:080471:1127.01 Page 2 [ Eh]

 

Concurrence Agency Response

We note an early concurrence agency response has been obtained from the EPA (refer to
Attachment Four).

It is noted that the EPA supports the Development Application as concurrence agency.
Maritime Safety Queensland (MSQ)

We note MSQ approval has been obtained (refer to Attachment Five).

The proposed structures have been assessed in accordance with MSQ’s navigation
requirements, are appropriately allocated within the prolongation boundaries of the Land,

and address marine safety issues.

It is noted that the Development Application have satisfactorily addressed MSQ concerns,
which is evident in their approval.

Noosa Planning Scheme Policy 4

We refer to discussions between Denis Wallace (Council) and Kayla Gulliver (Emanate).
We note Council has advised the Application will be refused on the basis that the
Application does not comply with the Policy 4.

Pursuant to section 2.1.23 of the Integrated Planning Act 1998 (IPA) (refer to Attachment
Six), which states a planning scheme policy may only do 1 or more of the following inter
alia, (4) include guidelines or advice about satisfying assessment criteria in the
planning scheme.

A planning policy cannot regulate development on the Land.

EPA as Concurrence Agency and as the administering Department for the state resource
has approved the Application.

. Strand Gardens requests a relaxation of the design dimensions identified in Policy 4
of the Planning Scheme.

° Strand Gardens proposes an 8m long by 2m wide pontoon, an additional area of 1m’,
then that, defined in Policy 4 of the Planning Scheme.

Merits of Development Application

The proposed structures will not impact on the existing amenity of the area nor will they
pose a detrimental impact on adjoining lands and uses.

The setback of 5.985m on either side of the Land provides sufficient clearance between
adjoining Lands and dramatically reduces the possibility of encroaching on adjoining lands
and uses.

Page 3

 

 

 

 

Sunshine Regional! Coast Council Emanate Legal rt :
Attention: Denis Wallace 28 November 2008 ola
PRC:KMG:080471:1127.01 Page 3 }

The proposed structures will not be ascetically displeasing for passing vessels or
recreational type activities along the Noosa River, due to the length of water frontage of the
land to the river.

The Development Application demonstrates the ability to provide specific outcomes with
respect to both the Noosa Heads Locality and Infrastructure Uses Code of the Planning
Scheme (refer to Planning Report).

The Development Application should be approved
Meeting

We propose to convene a meeting of all parties in Noosa in the near future and will contact
you shortly to ascertain your availability.

Should you wish to discuss the foregoing, please do not hesitate to contact Peter Cardiff at
your convenience.

Yours faithfully

yo

Writer: Peter Cardiff
Direct: 47270100
Email: —_ [email protected]

Page 4

     

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 
 

Form 1 Development Application

IDAS

Assessment Checklist

 

IDAS Development Application Form 1 is the approved form for all development applications under the Integrated Planning. Act
% >»  19971PA), Form 1 is made up of various Parts. . . :

Part A (Common details) of Form 1 must be completed for all applications. The relevance of other Parts of Form 1 depends o on
te Fw st «the nature of the application.

Form 1 also includes this IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
: =Fequirements, and the Parts of Form 1 relevant to the application,

a hoes

   

* Section 1) and all other relevant sections of the ‘DAS Assessment Checklist, 28 identified in the Table below, must be -*,
completed f for all development applications except those proposed on land i in an urban evelopment area, or for r building work”

  

 

Answering the following questions will assist you in cleaning which sections ofth the 2 check m must be competed for your application. if
unsure, phone or visit your local government or log onto the DIP website www.dip.qid.gov.au for help

For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist

 

 

Does the application seek approval to materially change use of the premises?

 

 

if yes - complete Section 2 of this checklist DiYes |[xJNo
Does the application seek approval to reconfigure a lot? Ces |pano
ifyes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the local government.

Does the application seek approval to carry out operational work?

ifyes - complete Section 4 of this checklist Yes (No

 

Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?

. fd Yes |LNo
if yes - complete Section 5 of this checklist

 

Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development application?
tyes - complete Section 6 of this checklist. &t Yes |()No

 

Does the application seek approval to carry out building work requiring assessment against a local government planning

scheme? Yes |TNo
if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government.

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. OYes |KINo
Assessment is by a building certifier

 

 

 

 

 

 

 

    

 

 

 

  

SEC TION T section 1 must be coripleted for all applications that réquire cofipletion of the IDAS Assessment Checklist?»
HERITAGE {ee Oe ge ee |
samme na

 

 

141A Is any part of the proposal intended to be carried out on a Queensland Heritage place under the Queensland Heritage Act 1992?
IX) No-Gow118  [[] Yes

IPA, si 8, part 1 table 3. kom 2: 1P R,

   

cide 2 rable 1, ftom 17, table 2 item 18; PA, seulewt 7.3.5 (Drtiations fae tens usod m devchpinent}

 

Page 5

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

1.18 Does the proposal involve development, other than development mentioned in the integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered in
a Local Heritage Register under Part 11 of the Queensland Heritage Act 1992?

J No - Goto Q1.2 oO Yes - (Compiete Form 1, Part C,) This application requires assessment by the relevant focal government against the (DAS
Code in the Queensland Heritage Requiation 2003. if the development involves building work and the local
government is nat the Assessment Manager for the application, the local government has jurisdiction as Concurrence
Agency.

n, Sulodule 2. t20'@ 1 tern FIA IPA

   

 

[REMOVING QUARRY MATERIAL; WILD RIVER AREA se ek ee . , |

 

1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
X] No-Gowat3 (_] Yes
IPA, schedule 8, part 1. lable 5.

     

dem 1: 1 Regulation. schedule 2, ta jam 11 P Reguiation, schedule 1. table 5. item 2 (wild

 

ver area); Water Act 2000.

     

 

     

 

Section 960C, Wild Rivers Act 2
[ENVIRONMENTALLY RELEVANT ACTIVITY; WILD-RIVERAREA « ) 4. os Soe 4
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

[X} No-Gowara (] Yes

   
 

&, part 1, table 2, TPA, schedule & part 1. tabh
dives area): Wild Rivers Act 2005, svctlon SA; relevi

 
  

he 2. Hens 1 and 23: Envirornneatal Proicton Act 1904, section

 

 

MITHINTHE LIMITS OR APORT st, Seva ok op

     

1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
EX} No - Goto ais

CL Yes

IP Regulation, scheauit 2. tabh: 2. e203

 

 

   
 

noes “ comme
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
[X] No - Goto 07.6

oO Yes - if answers to questions in ather sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

 

 

IDECLARED FISH HABITAT. AREA.

 

iP Regulation, schedule 2, tibiae 2, tem 26

|COMMUNITY. INFRASTRUCTURES: ‘

 

 

 

1.6 1s any part of the premises designated for community infrastructure?
{X] No - Goto.a1.7

C Yes

IP Reguishon, schedide 2. tabie 4, tom?

(WASTE WATER MANAGEMENT:

 

  

 

17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[XJ No - Endof Section’ [(] Yes

IP Reguisuon, §

 
 
 

uo 2. labie 3, dem §

     

P

 

LANNING SCHEME. «:

 

 

4] \s any of the proposed operational work assessable under a planning scheme?
oO No - Goto 04.2 & Yes - (Complete Form 1, Part E} Answer Qs4.1.1 - 4.1.7 below.

Page 6

INTEGRATED PLANNING ACT 1997 iDAS Assessment Checklist, Version 21.3, 9 May 2008

 

 

STATE-CONTROLLED ROAD ‘ . . : i
4.1.1 4s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?

(No

C1 Yes

If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?

[K] No -Gowos12

Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

   

qulation, schecula 2. table 3. des 3.1P Reguiation: schaduie 2. tadle 3. tem 1d)
(ACID SULFATE SOILS es a . . : 7]

4.1.2. |s any of the operational work proposed in a local government area listed*" in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils

IX] No -Go10 04.7.3 (7 Yes

41 urukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Reddiffa, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

IP Regulation, schedule 2, lable 3, tein 4 Stale Planning

[EASEMENTS AND SUBSTATIONS 2. 1

 

 

 

“y 2/02: Planning and Managing Develapment invehang Acid Sultate Soils. section 3.6

 

         

 

Sige ge Bo pe ai i
4.1.3 Is any of the proposed operational work for filling or excavation?
1X] No -Got0414
C1 Yes
IP Reguision. schedule 2. tabie 2 em Tata): iP Regeln 2 102b}

 

4.14 — \|s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

(IJ No -Gotoas15 (] Yes

iP Reguiaiion. schedule 2, table 3, tem 17
PUBLIC PASSENGER TRANSPORT

4.1.5 Is any of the proposed operational w work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?

No- Go to 04.1.6 oO Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
JP Reguiation, schedule 2. table 3. dein 14

 

  

 

|RAILWAY SAFETY AND EFFICIENCY - aie.

4.1.6 Is any of the proposed operational work listed in schedule 13D oft the Integrated Planning Reguiation 1998 and does it exceed the
specified threshold?
EX] No-Got0a41.7 — [[] Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Reguiation, schedule 2. table 3, tem 1S

'KOALA CONSERVATION

 

 

 

ye ee
4.17 Is any part of the premises in a koala conservation area or koala sustainability area?
IX] No -Gowaez [_] Yes

IP Requistion, schedule 2, tahle 3. te 19

   

 

 

WILD RIVER AREA *- Although Tegistalion pr provides for assessment Of operational works for residential, commercial and industrial:
‘development for the purposes of the Wild Rivers Act 2005; currently no dectarations for any of the wild tiver areas apply the Wild River:
code to that type-of development. ae 2 :

   

 

     

Page 7

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN. AWILD RIVER
AREA

4.2 ls any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
[X] No -Gotoa13 [_] Yes

& . . i.

 

 

 
  

nie}
Wild Rivers oF residential. indusuial ot Ce

ated)

 

 

 

iVEGETATION CLEARING; KOALA CONSERVATION; WILDRIVERAREA= °. 0 gg 8 we Yew j
4.3 |s any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

No -Gotoo44 ([] Yes

IPA, schedule 8, part 1. isble 4, leis 1A-1G; 1P Regulation, schedule 2 {bk 2. Hea 5 ¢
conservation), f %
clearinghwitt] iver

{TAKING OR INTERFERING WITH WATER; WILD RIVER AREA=.> #%

   

il

 
  
 
 

gestion Management Act 1999, section 22A {vegelation

 

 

38-38 “e ame have

44 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?

EX} No -Go10a45 [] Yes - Answer (a) and (b) below

  
 

 

IPA , table 4, tems 3fa): 18 tation, sche hk ation, Sol 0, part 2, watie 4. lems 3 anid 3A; Water Act 2 eeclion SBLA file river

4.5 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump walter)?

XX No Goto 04.6 0 Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). I NRW is not the Assessment Manager for the application, the agency has. sursttion as Concurrence Agency.

IPA, schectule é

Mik! Rivers code

  
 

46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?

0X) No -Gotoas7 [-] Yes - Answer (a) and (b) below

  

8:1 Regulation, scheduly 1, patt 3. fable 4. tom 3: 4% SA gual tives arcat:

 

47 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water}?

[XJ] No -Gowors OY Yes

  
 
 

dle 1, pratt 4 tabie 4, tem a
OE wali Subsrtesian

   

48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
[EX] No -Got0.04.9 O% Yes - Answer both (a} and (b) below

Ws,

dives

  
 

schedule 2, lable 2, tem 9 1P Regulation, schedule

 

49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [ No O Yes
(i) To increase the storage capacity of a referable dam by more than 10% & No 0] Yes

If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ky) This application requires assessment by the Department of Natural Resources and

Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

IPA. scheriite 8. part 1. table 4, tem

(MDAL WORK; WILD RIVER AREA

schedule: 2, wible 2. item 10

ee ae

    

 

 

4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
BX) No -Gotoas17 ([] Yes - Answer (a) and (b} below

 

Page 8

INTEGRATED PLANNING ACT 1997 (DAS Assessment Checkfist, Version 21.3, 9 May 2008
i tie 2. iste 2 dems 12, 14 ard 17, iP Regulation, schedule 1, part 3 table 4, hems 4A and 5

 
 

 

iCOASTAL MANAGEMENT DISTRICT; WILD RIVER AREA : . + |

4.11 Is any of the operational work proposed to be carried out within a coastal management district?
[XJ No -Gotoas12 ([_] Yes

IPA, schedule 6. part?
Coastal Protection and M:

WATERWAY BARRIER WORKS; WILD RIVER AREA - oe” . — ° ™— |

4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
[X] No -Gotoaa13 (_) Yes

IPA, screds i tab
Reguistion. schethde |. pati 3. ta!

  
 

table 4, tenis 4A and §

 

43 patie VON BFGa!

 

 

StisA

   
 

     

Sessable Codes). iP Regula sifadule 2. table 2. tom 2eb iP
section 124,

 

schuntie 3.

ime 4, dem 2, Fishecuss Regul
p Fishorcs 2 a

3 ieald oar are

   

 

[DECLARED FISH HABITAT AREA; WILD RIVER AREA...

413 ls any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
DX] No -Gotoa4.74

CO Yes

IPA, sche:
Regueation.

 

 
 
 

 

4, tom 71PA, schegute 2. pat ssabic eodesi, IP Rexyuleton. schectt:
fs yi

area}.

  

ate 4. tert 3, Fisheries itegui
005, it

    
 

 

IREMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA,

4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
[xX] No -Gotoasis {_]} Yes

   

 

 

 

4.45 |s any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
IX] No -Gowarr ((] Yes

IPA, schedule 8. part 7. able 1, item ti IP Requistion, schedise 2, (tile 2. lest 37; Wild Rivers Act 2004. sections 12, 134A

 

 

   

iSTATE-CONTROLLED ROAD... —

   

4.16 ts any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
[XJ No - End of section 4 Oo Yes

ee eee

applies when he cppteaton is seeking eval to carry out bul
is work "is ina Tecra fl igh habitat a are y

 

 

DECLARED FISH HABITAT AREA & ee

   

5.1 Is the building work proposed in a declared fish habitat area under the Fisheries Act 1994?
EX] No - End of Sections (] Yes

  

 

JPRE APPLICATION REFERRAL AGENCY RESPONSE #2
6.1

 

 

 

REFERRAL MATTERS FOR WHICH A REFERRAL AGENCY RESPONSE HAS 3 [have you satisfied any conditions
IBEEN RECEIVED UNDER IPA S3,2.2 - lista separate . stated i in the! respol se?

 

 

 

1 Resource Entitlement Approval and Concurrence Agency Response ()No [] Yes f& No Conditions

 

 

 

 

Page 9

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
if yes for any of the referral matters fisted in the table above - A referral for this matier is not required, and the relevant Part identified in the IDAS Assessment
Checklist is not required to be compteted. A copy of the referral agency response and evidence
of how you have satisfied any conditions stated in the response must be attached to your
application.

if no for any of the referral matters listed in the table above - The retevant Part identified in the IDAS Assessment Checklist is required to be completed. The

application must be referred to the relevant referral agency. unless the referral agency is the
Assessment Manager.

 

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to fiability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
feliance on this process and the information contained on this form.

 

 

Page 10

INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008

Part P

Prescribed tidal work

 

 

 

Nature of the prescribed tidal works : : cs a = ]

1. What is the nature of the proposed prescribed tidal work and the type of approval sought? (Tick applicable box/es)

 

 

 

 

 

 

 

 

 

Nature of use ° Estimated value of T f i ht
(Fick applicable box) | completed works (¢) | «| YP Of aPProval soug!
KK) Private use
i Jetty, pier or wharf .
x ty. P (J Non-private use
(7 Private use
ii Boat ramp or spillwa
0 por splway CJ Non-private use
Private use
mm) Mooring pile 4 Non-private use [X] Development Permit
Private use imi
[1 ) Deck or boardwalk 0 (Preliminary approval
{J Non-private use
{XJ Private use
v) Pontoon
XM {_] Non-private use
Private use
OO wi) Revetment, sea wall or retaining wall O .
(] Non-private use
mI (vii) Other (e.g. abutment, basin, bridge, breakwater, dam,
o dock, dockyard, embankment, groyne, pipeline or other | (XX) Private use
underground service etc.) - Provide details below
regatta stairs (J Non-private use

 

 

 

 

 

 

 

 

 

2. |s the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of the lot connected to the
work and neighbouring lots are not at right angles to the waterway?

<a)

| Yes - Submit, with the application, photos of any constructed neighbouring structures. or information about approved but unconstructed
neighbouring structures.

 

are : “ a

[Adjoining property « access and evidence of support ,.

  

3. Is the application supported by evidence that the proposed work will not prejudice the access rights of adjoining property owners?
[No & Yes - Complete 03(a)

3(a) What is the nature of the evidence?
[X] Letters of support from adjoining property owner - Sumit, with the application, the letters of support.
[J Plans illustrating a water allocation area - Submit, with the application, the plans illustrating the water allocation area.

Page 11

INTEGRATED PLANNING ACT 1897 Part P, Version 2.1, 3 March 2008

 

Certification : , 8 |

 

4. Has a Registered Professional Engineer of Queensland (RPEQ) or interstate equivalent certified that the works comply with the design
and safety provisions of the State IDAS code for Prescribed Tidal Works contained in the Coastal Protection and Management

 

 

 

 

 

Regulation 2003?

(] No

IX] Yes - Provide details below

Name of RPEQorequivalent =, =, {Walter John Schwabe

RPEQ No. or equivalent — 4328

Contact maling address war  _, {PO Box 6224, MOOLOOLAH VALLEY 4553
Contact ielephone nuinber,. mu sow vy a . 10419090 866

Contact facsimite number .::« INIA

 

 

Reference number of all plans to which this certification relates :* |wd.202

 

 

 

 

 

 

», Confirmation of . | vk
°  Iedgement?” Method of lodgement

 

 

  

Lena

 

 

Plans and written documentation” “" ,
(i) The focation and dimensions of the proposed tidal work in relation to the lot/s abutting the proposed
work and the tidal land on which the work is proposed to be located

(i) All other structures on the waterfront and within 20 metres of the proposed works (X] Confirmed

(iii) The current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide (HAT) and
Mean High Water Springs (MHWS)

(iv) The slope angjes of the beds and banks of the tidal area EX] Confirmed

me

   

 

(XX) Confirmed

 

 

{X] Confirmed

 

 

(v) Details of the proposed work in accordance with the IDAS code for prescribed tidal work in the
Coastal Protection and Management Regulation 2003, schedule 4A (e.g. physical appearance, lighting, |<] Confirmed
signage, earthworks, public access, infrastructure, structural components, engineering design standards)

 

(vi) The finished levels of the proposed works [EX] Confirmed

 

LX} Confirmed

 

(vii) Details of the largest vessel, if any, to be moored at the structure
[J Not applicable

 

(vii) Evidence that the proposed work will not prejudice the access rights of adjoining property & Confirmed
owners ([] Not applicable

 

 

 

 

 

 

OFFICE USE ONLY

Date Received Reference Numbers fe] EPA cost code | 433061

 

 

 

 

 

 

 

 

Page 12

 

INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008
Advice for completing Part P

 

General advice
» — Part A must aiso be completed for all OAS development applications.
« The applicant is responsible for answering al! questions fully and correctly, unless following a response there is a statement to go directly to another
question.
« When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) use the process from the information sheet Electronically
paying fees to the Environmental Protection Agency (EPA) and attach the form Electronic Funds Transfer (EFT) payment notification to the application.
* — For further information about completing this form go to:
. IDAS Guide 24 (Prescribed tidal work)
° Ecoaccess website
. EPA Guidelines and procedural guides

 

a1 A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise
development to occur.

 

a4 A Registered Professional Engineer of Queensland (RPEQ), or the interstate equivalent, may certify that the proposed work complies with the
design and safety provisions of the IDAS code for prescribed tidal work in the Coastal Protection and Management Regulation 2003, schedule
4A. The provision of the certification may reduce the applicable fee for assessment of the work by the local government.

 

 

Page 13

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

   

Form 1 Development Application

Part E

Building &/or operational works assessable
against a planning scheme

asap iy

 

 

 

‘Nature of the works ; * ° ooo. - bse 2k Sa er bog. Ei
1. Nature of work that requires assessment against a planning scheme:
Building work - Complete Table A Operational work - Complete Table B
9
Table B
(i) What is the nature of the operational work?

() Roadworks ([) Stormwater &X) Water infrastructure (L) Sewerage infrastructure

(F] Landscaping ( Earthworks [-] Drainage Works C) Signage

{) Clearing vegetation under the planning scheme {([] Other - Specify below

(ii) What type of approval is being sought? ;vOTE: if you have indicated multiple operational works in questan (i) above andl your answers to ths
question would be different for different operational work, it may be more appropnaie to provide these details in an attachment to ihis form)

{X] Development Permit {[] Preliminary approval (J Both (Specify netow}
(iii) Is the operational work necessary to facilitate the creation of new lots (.e. subdivision)?
No (J Yes - Specify ihe number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

EXNo =] Yes - Complete Table B(a)

 

 

 

2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour)

 

(Mandatory Information oss in Sindh weil secs nda dbus oon,

3. Confirm that the following mandatory information accompanies this application

 

 

 

 

 

 

 

 

 

 

 

{Confirmation of | ying toa es
* adgement i Method of lodgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works finchading the
lextent of any cut and fl) &) Confirmed
OFFICE USE ONLY
Date Received Reference Numbers

 

 

 

 

Advice for completing Part E

General advice
¢ Past A must also be completed for ail 1DAS development applications.
* The applicant is responsibte for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

 

 

qi A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur

 

 

Page 14

 

Notice

Coastal development

 

Notice of decision — Provision of evidence of resource entitlement

 

This notice is issued by the Environmental Protection Agency pursuant to section 3.2.1 of the Integrated Planning Act 1997
to provide resource entitlement as delegated under the Land Act (Tidal works and prescribed tidal work) Delegation (No. 1, 1)
2008.

Strand Gardens Pty Ltd Cc: Sunshine Coast Regiona! Council
30 Noosa Parade Locked Bag 72 :
Noosa Heads Sunshine Coast Mai! Centre

(Lot 14 on N21842) . Qld, 4560

Attn: Peter Cardiff
Emanate Legal

PO Box 1984
Townsville QLD 4810

Your reference: PRC:KMG:080471
Our reference: MCY2068

Attention: Mr Peter Cardiff,

Project Ref: 330246

Re: Request for evidence of resource entitlement for a prescribed tidal work application for a jetty,
pontoon and regatta stairs in the Noosa river situated at 30 Noosa Parade (Lot 14 on Plan
N12842), pursuant to section 3.2.1 of the Integrated Planning Act 1997 by Strand Gardens Pty
Ltd

The Environmental Protection Agency, under the Land Act (Tidal works and prescribed tidal work) Delegation
(No. 1) 2008, has considered your request received on 20 October 2008 and wishes to advise you of the
decision as specified below:

 

 

 

Property owner: | Strand Gardens Pty Ltd
Activity: Prescribed tidal work
Activity description: Pontoon, jetty and regatta stairs

 

 

 

 

 

Page 1 of 2 + 080131

Environmental! Protection Agency Queensland Government
www.epa.qid.gov.au ABN 87 221 158 786 Environmental Protection Agency
Queenstand Parks and Wildlife Service

Page 15

ecoaccess

environmental licences and permits

Notice
Notice of decision — Provision of evidence of resource entitlement

 

 

Kidd and Co Designers drawing WD.202 (2) Jetty Layout 2 of 2 dated March
Plan / Drawing number: 2007 & Kidd and Co Designers drawing WD.710 (1) Water allocation plan
dated March 2007

 

30 Noosa Parade, Noosa Heads QLD

 

Description of subject land:
Lot: 14 Plan: N21842

 

Decision: Evidence of resource entitlement is granted.

 

Decision Number: CSRE00384008

 

 

 

 

A Notice — ‘Prescribed Tidal Work Early Concurrence Agency Response’ is included with this Notice.

If you require more information, please contact Rod Garner, the Project Manager, on the telephone number
listed below.

Yours sincerely

Af One 21 November 2008
4

7

 

Signature Date
Dr Glen Brown : Enquiries:
Regional Manager Environmental Protection Agency
Brisbane North Region 29 The Esplanade, Cotton Tree, QLD 4558
Environmental Services Telephone: (07) 54 596132 @

Environmental Protection Agency Facsimile: (07) 54 439927

 

Page 2 of 2 + 080131 Environmental Protection Agency

Page 16

8700

700

 

 

 

gid selout ®

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

     

 

 

   

  

5,300

 

 

4000 4,100
Line indicates 0:}4 Mean High Water +
“eT hom Ste Survey "43 =
post eter eng detais | 43 Sit salereng de
ye ten stab | Tout HEY
== soubor *| To
“KITCRERN i: 7 Ee
’
} pe ee —postio.eng. det Ly PRE
140 block wall past“? fy woe 4 a OECK —T ef oe See
pool
a enclosure = TOWA.7 i sop po tlle : : : - oe
| | ‘ } . ida '
Ry
| sab oe
Towa |", 2177 prc own fot ot a row ds

 

  
    

 

fpation of oft | i
|

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

4
new 100 block ——¥
wall on centertine
‘of boundary .
& ang
= i
®
3 SUMPL ap
g ' » Ou
x ae
”

30.500

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

OOSOE = .OZEL.rZE
2
5700

 

 

‘no splters refer

 

 

 

 

 

 

 

 

 

exposed agg,
courtyard,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2 no AC condensor
under roof by A\

contra 3

 

 

 

 

 

 

 

 

 

 

 

 

al ‘
Vr
I
GAM. fe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

Iresh ai duct undor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

refer A4 echadules for material description
alurinium seraen.

durrinigm louvres, refer schedule...
slurriniam skiing door.
lumina door.

aluminium window.

box gutter

balustrade type 1, refer detad
batustrac
reso

       

 

Hore cement external cladding,
fascia gutter.

Insiu, concrete

rete! awning, refer detail

GHHGOOSOHGOHSOOOOS

etal roofing
ESD) natal ground line
CPE) plasterboard ining
(PD) pamperwat
RED ridge capping

rain water head, refer detel,

   

stak, refer engineer.
ted deck

timber floor

turbo ver.

B9GGOOS

 

 

LEGEND

 

#

hosecock

hte
‘the hot & cold nose cock

 

 

 

EXTERNAL FINISHES & FIXTURES LEGEND

polycarbonate roof sheating, refer schedute,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

  

 

 

 

 

   

 

 

 

 

  
 

 

 

 

 

 

 

 

 

      

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      

 

 

 

 

      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   
 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

designers

20 Duke Street

Sunshine Beach QLD 4567

  

PO Box 262
Noosa Heads QLD 4567

 

Telephone 07 $447 5633
Facsimile 07 5447 5633

[email protected]

www kiddeo.com.au

Constructon'a comply
‘wit al relevant SAA &
BCA Codes & standard
Eady Bysow 1975 & 2
amended

erty af dmensions on
siz porto commencement
Stary works, These
drawings aw nattobe
sed for sealing
Copyrighter design &

Ge Revsedwrdawlayou 0/ 0/ 08
C2 Revised pod Benglayod 020005
CC Iesued lor corururneruchert rene
100303

To} ssued for rtaxcton olan caton
eos

Tissurd for Bung Approval 2411 OF
T1ieaued for tender 16 15 OF

Fy General rontion 24 100/

PS Genera revion 181007

Fo Srucure developad 2308 0/
4 General reason 1908 OF
P23 lanes tor nforretun 190707
Pe General recon.
\snued for development approval 3 04 0
Pt taeund or development aprord 2504 OF

Paget
PROPOSED
ENCE

|" eon NOOSA PARADE
Or

a2

 

     

8
5
EE
8 vanty trough oot
5 ‘and vert in ext. wal to
ae mech contr’s design
y
l i E ZX nn sae
— BoA Pb WSR Bp |
4 Ee. ET |+—4 |
a rl, :
EB f t
t emestic hot water ~ aca ee?
heat pump 15 Une indxates edge
nanee | pom ee
+ za 5 |
++ ----- : eS aT te pite, | ry
i Naa r block wail on
TOW4.6 he: < LJ tf owe | | centerine of boundary | | \
ey aa . |) Ts, = 3 tt pumps x 2 ' |
5 LP TLS ic
say L : MH Py r H eee ato en
aa “pe “ Bo earecd zt mn | A
i r A capi | we] Ue ts
san: <A chancel 19 cenit < fe | ne as open awning wih sun c an 5,685
| BA tout 5 3 _ | BAAS 77 bates ow ate g 3 SR :
3 = aa Slempised agg * Ze pool spa a oT |
EAS! _ ctabgsmmp « aren / sed agg reer '
2 ia Pe one . fora 2tena 7" 44 are, 5 sched L -4-
fey Q
SAY Cd) ong pote = & CM wally > to eng, det and as —
Jon Ey 5 ae . . ht wea! AC &t by AC ae ofan a
tt j ows * afte FF 600. 600 te as sched. contractor "Tr tam Sée Sune . ap
TT a on ats wi oo fot Tow 44 ic os refer eng deals + 1a
*r eS = Le 5
| cavityredsiresto Ss sag TT canty requires’ : Ciba vO od
3 ato S pacalrad »'T seconmotate : | | a as sched. 54°29°20" 10.058 we |
l © 4 * 19.058 +° ysianggae t
{ Bulder ta ensure oe
3 + DRIVEWAY. . | Fu
a prises “tet mene was eng cpa s
3 | a feces EU OE ¢
: iz
¢_1 \Ground Floor Plan 1 pf2 ee ; 1 NOOSAPARADE =
WD.207' SCALET=TO0 i cos orriabia aor i t om
aI 1 ' : \WwD.207 scate 1:100
i sett of boundary 1g 4000 Kas xX 30 x %a80 De ot setout off boundary

 

 

 

JOSAHEADS
+ Client

<HraZAYLOR

 

 

 

 

 

 

 

 

He “Drawing The

Ne ae

GROUND FLOOR PLAN
‘Seale Date

as shown Mar.07
Ocean By dN:
LFAEW 0705

Drawing to, (sue hb.
WD.202 (4)

Page 17

kidd
+CO

designers

 

QLD 4567

      

 

(07 5447 5633
07 5447 5833

omau

 

Tis drawing is tobe

Engneers Orawngs &

dg By-law 1975 & 25
amended

Very at mensions on
se prior to commencement
any works These
drawings are not to be
used for scaling
‘Copyright for design &

 

WET BERTHED VESSEL Phone: 54437208

Ema surca@bigporeinetau
x — 14,465 = # Length 2/' (8.22m) |

x 14370

S465
13,300 Phone. (07) 5446-3988
| 13.515

ADJOINING

a PROPERTY JETTY

 

 

 

ADJOINING
PROPERTY JETTY

 

| | 5
CT profile (approx) tr —_—

Project
PROPOSED
RESIDENCE
_— Locaton
30 NOOSA PARADE
NOOSA HEADS
a — _ - Client
4 TAYLOR
5 Drawng Tee
= WATER ALLOCATION
4% LOT 13 PLAN
ba Seae Cate
as shown Mar ‘07
1 " Drawn By Job No

LFNEW 0705
1 WATER ALLOCATION PLAN lan
WD 7107 SCALE' 100 @A2

(Orawing No nel
: WD.710 (c1

MZ L Siege) — -
Line icc ates nominal 0 34 Mean High W ater
‘Spring (Munna Polit) interpolated from Site Survey

 

 

 

 
 

Page 18

Notice

 

Prescribed Tidal Work Early Concurrence Agency Response

 

This notice is issued by the Environmental Protection Agency pursuant to Sections 3.3.16 and 3.3.18 of the Integrated
Planning Act 1997 to advise of a decision or action.

Sunshine Coast Regional Council Cc: Strand Gardens Pty Ltd
Locked Bag 72 C/- Emanate

Sunshine Coast Mail Centre . PO Box 1984

QLD 4560 . TOWNSVILLE QLD 4810

Our reference: 330246

Dear Sir/Madam,

Re: Referral for Prescribed Tidal Work Early Concurrence Agency Response by
Strand Gardens Pty Ltd, 30 Noosa Parade, Noosa Heads.

The Environmental Protection Agency (EPA), wishes to advise that a referral for an early concurrence
agency response for prescribed tidal works, was received on 20-OCT-2008, and has been assessed,
and on 21 November 2008 resource entitlement was granted. :

1. Property/Location:

Street address - 30 Noosa Parade NOOSA HEADS QLD 4567
Lot/Plan - Lot 14 Plan N21842

2. Details of the recommendation

Aspect of Development
~ Concurrence Response for Operational Work
- Prescribed Tidal Work

Recommendation

 

- Granted
EPA Ref Number
~ IPCC01241808
Page 1 of 3+ AFO80109_—-
Q wezrsiers Government
Environmental Protection Agency
Environmental Protection Agency Queensland Parks and Wildlife Service

www.epa.qid.gov.au ABN 87 221 158786

Page 19

ecoaccess ot

environmental licences and permits

Notice
Prescribed Tidal Work Early Concurrence Agency Response

 

5.

Currency period

This approval will lapse unless substantially started within the currency period/s set by the Assessment
Manager OR the standard currency periods stated in section 3.5.21 of the Integrated Planning Act
1997 applying to each aspect of development in this approval AND/OR the following currency periods
applying to aspects of development in this approval.

The approved plans

The approved plans and/or documents for this approval are:

 

 

 

 

Plan/Document No. Pian/Document Name Date
WD.202 (2) Kidd & Co. designers — Jetty layout 2 of 2 March 2007
WD.710 (1) Kidd & Co. designers — Water Allocation Plan March 2007

 

 

 

 

Codes for self-assessable development

Any self-assessable development for an environmentally relevant activity conducted in conjunction
with this approval, must comply with the relevant code of environmental compliance.

Assessment Manager Responsibilities

Please note that it is a requirement under Sections 3.5.15 and 3.5.17 of the Integrated Planning Act 1997

that a copy of the final Decision Notice (which includes the EPA’s concurrence response) for this application
issued by the Sunshine Coast regional Council,, be forwarded to each referral agency. Therefore could you
please send a signed hardcopy to the EPA’s Ecoaccess Customer Service Unit, PO Box 15155 CITY EAST

4002 and an electronic copy to [email protected] addition, the State’s Native Title Work Procedures indicate that responsibility for assessment of native title e

issues for an IDAS application rest with the Assessment Manager. Therefore in this instance, the EPA has
not provided a notification to native title parties.

if you require more information, please contact Rodney Garner, the Project Manager, on the telephone
number listed below.

Yours sincerely

 

Enquiries:

ES - Reg Serv - Bne North - Sunshine Coast -
EPA

PO Box 168

COTTON TREE QLD 4558

Phone: (07) 5459 6132

Fax: (07)5443 9927

Environmental Protection Agency
21-NOV-2008

 

Page 2 of 3 + AFO80109 Environmental Protection Agency

Page 20

Queensland
¥. Government

>

15 October 2008 Maritime Safety
Emanate Legal

Queensland Transport
PO Box 1984 REC EIV ED
Townsville Qld 4810 17 01 7008
Dear Sir

Tidal Works — Request for comments
Pontoon/Jetty — Taylor - 30 Noosa Parade, Noosa Heads (Lot 14 on N21842)

Thank you for your letter of 6 October 2008 about your proposal to construct a pontoon/jetty at the
location mentioned above.

As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
following navigation and marine safety conditions are complied with.

I. The contractor must build the pontoon/jetty according to Kidd & Co Designers, Drawing No
WD.710, attached to your letter dated 6 October 2008.

2. No part of the structure or any ship berthed at this structure is to come closer than | .Smetres from
the side boundaries of the allocated water space as shown on the submitted water allocation plan.

3. The pontoon/jetty and all freestanding piles must be lit and clearly visible to approaching vessels.
The contractor must position ail lighting so it does not cause a risk to the safe navigation of other
vessels.

4. The applicant or his agent is responsible for the removal of any existing structure above or below
the waterline, and must contain and remove any debris. Any pile that needs to be removed must
be totally extracted,

5. The ship moored at this pontoon must follow the most direct course from this structure to open
waters and a similar direct course when returning to this pontoon.

6. The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel
clearance at all stages of tide. The ship must comply with any local restrictions placed on channel
depths and draft restrictions.

Maritime Safety Queensland Our ref 710/01585(5) P39100 £28420 F82
Marine Operations (Brisbane) Your ref
MacArthur Avenue East Enquiries James O'Connor
Pinkenba Queenstand 4008 Telephone +61 7 3860 3504
Facsimile +61 7 3860 3571
ABN 13 200 330 520 Website —www.msq.qid.gov.au

Email [email protected]

Page 21

7. Any ships and equipment you or your agent use must comply with the Transport Operations
(Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (Marine Pollution) Act 1995.

8. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
1994 and the Transport Operations (Marine Safety) Regulation 2004.

9. Any ship moored at this pontoon/jetty must not impede the safe navigation of other ships or
restrict safe access to or from neighbouring structures.

10. Any ship moored or dry berthed at this structure must not exceed the following sizes:

Wet Berth Dry Berth
Length Overall - 9 metres N/A
Beam - 3 metres

I. The contractor must construct the pontoon/jetty within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.

Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.

The above conditions must be included in your application to the assessment manager.

This agency will also forward a copy of this letter to the Assessment Manager.

Yours sincerely

launeo Loni

Captain Richard C Johnson
Regional Harbour Master (Brisbane)

Maritime Safety Queensland Page 2 of 2

Page 22

s 2.1.23

60 s 2.1.23
Integrated Planning Act 1997

 

Division 6

Local planning instruments
generally

2.1.23 Local planning instruments have force of law

(1) A local planning instrument is a statutory instrament under
the Statutory Instruments Act 1992 and has the force of law.

(2)

(3)

(4)

A local planning instrument may not prohibit development
on, or the use of, premises.

Subject to part 5B, a planning scheme or a temporary local
planning instrument can regulate a use of premises, but
only—

(a)

(b)

by applying to the use a code identified in the planning
scheme or temporary local planning instrument; and
if-—

(i) the use is a natural and ordinary consequence of

making a material change of use of the premises
happening after the code took effect; and

(ii) the making of the material change of use is
assessable or self-assessable development.

A planning scheme policy may only do | or more of the
following—

(a)
(b)
(c)

(d)
(e)

state information a local government may request for a
development application,

state the consultation the local government may carry
out under section 3.2.7;

state actions a local government may take to support the
process for making or amending its planning scheme,

contain standards identified in a code;

include guidelines or advice about satisfying assessment
criteria in the planning scheme.

(5) Subsections (2) to (4) apply despite subsection (1).

Page 23

s 2.1.24

61 $ 2.2.1
Integrated Planning Act 1997

 

2.1.24 Infrastructure intentions in focal planning instruments
not binding

(1)

(2)

If a local planning instrument indicates the intention of a local
government or a supplier of State infrastructure to supply
infrastructure it does not create an obligation on the local
government or the supplier to supply the infrastructure.

If a local government or a supplier of State infrastructure
states a desired standard of service in a priority infrastructure
plan, an entity does not have a right to expect or demand the
standard.

2.1.25 Covenants not to conflict with planning schemes

Subject to section 3.5.37, a covenant under the Land Act 1994,
section 373A(4) or the Land Title Act 1994, section 97A(3)(a)
or (b) is of no effect to the extent it conflicts with a planning
scheme—

(a) for the land subject to the covenant; and

(b) in effect when the document creating the covenant is
registered.

Part 2 Reviewing local planning
instruments
Division 1 Review of planning schemes by

local government

2.2.1 Local government must review planning scheme every
8 years

(1) Each local government must complete a review of its planning

scheme—

(a) within 8 years after the planning scheme was originally
adopted; or

Page 24

 

Sunshine Coast ‘and Use SECTION FEES

Regional Council

 

 

 

 

 

 

 

 

RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111
APPLICATION FEES
Material Change of Use - Code/impact
Consistent 521
Inconsistent : 521
Assessment under Superseded Planning Scheme §21
Modification to a Development Permit ' §21
Extension of a Currency Period. 521
Operational Works - Landscaping §21
Bidg Work assessable against the Planning Scheme : §21
PRE LODGEMENT REVIEW
Half Hour , 522
One Hour §22°
ADVERTISING
Purchase Advertised Applications 523
JETTIES / :
Jetty Application Fee - 2190 S24
Jetty Bond ‘ © FOOD. eG
: . : ‘ (category $ ae )
BONDS So Ogee
’ Performance Bond . 51
: . (Category 9) .
SIGNS . ,
Registration Fee : . 222
SEARCH FEE .
Search of Land Use Section file. 112
Liquor Licensing Request mo : : 113
TOTAL $ 26790
NAME: SVawe Gras hes Pie Ls Preomn— Gj Te el
ADDRESS: CO Berne !9 bas 7 Y
Towmwsvicce tS
FILE NO: e¢/ toy DATE: J/(zJo€
a => -
RECEIPTNO: 46 } Zs?, 4618S & Signature of TP Officer: PS Aideo m7
7 , ;
‘AUTHORITY NO: c)

 

jM4{ 2008/1724)

Page 25

 

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

TOTAL FEES

 

 

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Properly Made) [As Published].pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.