Council archive · source document
08/1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Properly Made) [As Published] · 142008.1704
Sunshine Regional Coast Council Emanate Legal =: Attention: Denis Wallace 28 November 2008 = PRC:KMG:080471:1127.01 Page 2 [ Eh] Concurrence Agency Response We note an early concurrence agency response has been obtained from the EPA (refer to Attachment Four). It is noted that the EPA supports the Development Application as concurrence agency. Maritime Safety Queensland (MSQ) We note MSQ approval has been obtained (refer to Attachment Five). The proposed structures have been assessed in accordance with MSQ’s navigation requirements, are appropriately allocated within the prolongation boundaries of the Land, and address marine safety issues. It is noted that the Development Application have satisfactorily addressed MSQ concerns, which is evident in their approval. Noosa Planning Scheme Policy 4 We refer to discussions between Denis Wallace (Council) and Kayla Gulliver (Emanate). We note Council has advised the Application will be refused on the basis that the Application does not comply with the Policy 4. Pursuant to section 2.1.23 of the Integrated Planning Act 1998 (IPA) (refer to Attachment Six), which states a planning scheme policy may only do 1 or more of the following inter alia, (4) include guidelines or advice about satisfying assessment criteria in the planning scheme. A planning policy cannot regulate development on the Land. EPA as Concurrence Agency and as the administering Department for the state resource has approved the Application. . Strand Gardens requests a relaxation of the design dimensions identified in Policy 4 of the Planning Scheme. ° Strand Gardens proposes an 8m long by 2m wide pontoon, an additional area of 1m’, then that, defined in Policy 4 of the Planning Scheme. Merits of Development Application The proposed structures will not impact on the existing amenity of the area nor will they pose a detrimental impact on adjoining lands and uses. The setback of 5.985m on either side of the Land provides sufficient clearance between adjoining Lands and dramatically reduces the possibility of encroaching on adjoining lands and uses.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Properly Made) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.