Decision Notice - Approved by Delegation of Authority - MCU25 0020 (As Published) · MCU25/0020
Car Parking
7. Car parking spaces must be provided on site as shown on the approved plans (Basement
and Basement 2) and made available and accessible at all times for residents. Vehicle
manoeuvring areas are provided on site in accordance with the Australian Standards for Off-
street car parking so vehicles enter and leave the site in a forward gear.
Lighting Amenity
8. No flood lighting must be used on site. Any vertical illumination resulting from direct, reflected
or other incidental external lighting emanating from the site must not exceed 8 lux when
measured at any point 1.5 metres outside the boundary and at any level from ground level
upward.
Environment
9. Sediment or any other material including building materials or waste products must not be
deposited or released into the road reserve, stormwater drain or adjacent properties.
Landscaping Works
10. A minimum of 20% of the site must be retained as soft landscaping.
11. Side boundaries are to include a mix of vegetation which includes shrubs and trees. The
plants are to be sourced from the Noosa Plan 2020 - PSP2 Landscaping planning scheme
policy and maintained for the life of the use at the site.
12. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
Flood Immunity and Earthworks
13. The minimum floor levels of all habitable rooms must be at least 300 millimetres above the
Defined Flood Event – 1% AEP.
Site Access and Driveways
14. A sealed access driveway must be provided from Ravenwood Drive to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval, be generally in accordance with SCG’s Driveway & Access
Plan (0280-OW4.1, Rev. B) dated 9 October 2025.
Stormwater Drainage
15. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge without causing scour or damage to the subject site or any adjoining properties.
Easements
16. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
17. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
18. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
19. All works must be carried out in accordance with the recommendations contained in
Tectonic’s Geo-environmental Investigation Proposed Residence (25040-001-Rev1) dated 4
June 2025 and endorsed as part of the building approval.
Page 3 of 7
Document Set ID: 24250364
Version: 3, Version Date: 30/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority - MCU25 0020 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 177 KB (small file)
- File type
No other editions are linked here.