20. A dilapidation survey must be carried out of all adjacent properties, structures and
infrastructure prior to the commencement of works and endorsed as part of the building
approval.
Acid Sulfate Soils
21. All works must be carried out in accordance with ADG Consulting’s Dewatering Management
Plan (ADG1786.25, Rev. 1) dated 7 October 2025 and endorsed as part of the building
approval.
Earthworks and Retaining Walls
22. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be contained entirely within the subject site unless
written permission form the respective landowner(s) is provided to Council. All earthworks
must be undertaken in accordance with the provisions of Australian Standard AS3798:
Guidelines on Earthworks for Commercial and Residential Developments.
23. Where the development involves excavation or filling over, or adjacent to, drainage, water
supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
provide a freeboard of 100mm above the finished ground surface level.
24. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
25. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
ADG1786.25 Rev1 Dewatering Management Plan 7 October 2025
Prepared by ADG Consulting
25040-001 Rev1 Geo-environmental Investigation Proposed 4 June 2025
Residence
Prepared by Tectonic
0280-OW4.1 B Driveway & Access Plan 9 October 2025
Prepared by SCG Consulting
0280-OW4.2 A Driveway Details 4 June 2025
Prepared by SCG Consulting
6. REFERRAL AGENCIES
Not applicable.
Page 4 of 7
Document Set ID: 24250364
Version: 3, Version Date: 30/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority - MCU25 0020 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 177 KB (small file)
- File type
No other editions are linked here.